SRLDC Data Comm
SRLDC Data Comm
Communication
Abhimanyu Gartia
Chief Manager,SCADA-IT
SRLDC
Transducers
RTU
Current Transformer
Capacitor Voltage Transformer
TRANSDUCER
TRANSDUCER
TYPICAL RATING
Transducer
Voltage
Current
Frequency
MW
MVAR
Input
0-110 V
0-1 Amp
0-5 Amp
Output
0-10 mA
0-10 mA
4-20 mA
4-12-20mA
4-12-20mA
SCADA
Local Control
Data Logging
Process Control
MAIN
CPU
BOARD
COMMN
BOARD
PT
SEC
110VAC
PSU
MW
MVAR
VOLT
CT SEC
1 AMPS
A
N
A
L
O
G
D
I
G
T
A
L
I/P
I/P
TERMINAL
BLOCK
TERMINAL
BLOCK
C
O
N
T
R
O
L
O/P
TERMINAL
BLOCK
EVENT LOGGER
PANEL
D
R
I
V
E
R
R
E
L
A
Y
F
R
O
M
S
W
I
T
C
H
Y
A
R
D
F
I
E
L
D
PLCC T x / R x
SPEECH / DATA
PANEL
N
S
K
5
modem
PLCC
INDOOR EQUIMENT
RTU
TRANSDUCERS
CLASSIFICATION
INPUT
OUTPUT IMPEDANCE
VOLTAGE/CURRENT/POWER/POSITION
OUTPUT
500,1000,2000
ACCURACY
TRANSDUCERS
Scan Cycles
Current Transformer
HV
L
C1
Tr
1a
Metering
CHF
1n
C2
2a
Protection
D
2n
COMMUNICATION
REQUIREMENTS FOR
SCADA
COMMUNICATION
REQUIREMENTS FOR SCADA
Modes of Communication
PLCC
Leased Telephone circuits
Microwave Communication
Fibre Optics Communication
Satellite Communication
PLCC
Protection-Channel-I ->
speech channel 300 Hz to 2000 Hz
TeleprotectionTeleprotection- 2000 Hz to 3400 Hz
Protection-Channel-II (Backup-Protection)->
speech channel 300 Hz to 2000 Hz
TeleprotectionTeleprotection- 2000 Hz to 3400 Hz
PLCC
Advantages:
1.
High reliability
2.
All channels are available for dedicated use by
power-utility alone
Disadvantages:
1.
Cost of insulating communication equipment is high
2.
High noise level due to Corona
3.
High speed data-transfer not possible because of
Bandwidth limitations.
Applications of PLCC
Voice Communication
Fascimile Transmission
Tele-Protection
Tele-Metering
Types of Couplings
PHASE-TO-GROUND COUPLING
WT
WT
STATION-A
CC
CC
STATION-B
LMU
DC
DC
LA
ES
LA
ES
PLCC PANELS
PLCC PANELS
ES=Earth Switch
DC=Drainage Coil
LA=Lightening Arrester
WT=Wave Trap
CC=Coupling capacitor
PHASE-TO-PHASE COUPLING
WT
WT
WT
WT
STATION-B
STATION-A
CC
LMU
DC
LA
CC
CC
LMU
LMU
DC
ES
LA
ES=Earth Switch
LA=Lightening Arrester
capacitor
BT=Balancing Transformer
LMU
ES
BT
BT
PLCC PANELS
DC=Drainage Coil
CC
PLCC PANELS
WT=Wave Trap
CC=Coupling
INTER-LINE COUPLING
WT
WT
STATION-A
CC
LMU
DC
LA
CC
CC
LMU
LMU
DC
ES
LA
STATION-B
CC
LMU
ES
BT
BT
PLCC PANELS
ES=Earth Switch
DC=Drainage Coil
LA=Lightening Arrester
Transformer
WT=Wave Trap
CC=Coupling capacitor BT=Balancing
PLCC PANELS
Microwave Communication
Line-of-sight communication
Requires repeaters at 50-60 kms. Intervals
Provides sufficient bandwidth to meet the needs of
power utility
Higher availability than PLCC, availablity not affected by
maintenance or faults on the power lines
Suffers from multipath-fading effect
In India, WPC (wireless planning & co-ordination) wing
has assigned 2.3-2.5 GHz and 2.8-5 GHz bands to power
sector usage.
Fiber-Optic Communication
Analog/Digital
Interface
Voltage to
Current
converter
Source to
Fiber
Interface
Light
Source
Optical Fiber
Fiber to
Light
Detector
Interface
Light
Detector
Current to
Voltage
converter
Analog/Digital
Interface
OUTPUT
Advantages:
The ability to carry much more information and deliver it with greater fidelity
than either copper wire or coaxial cable.
Fiber optic cable can support much higher data rates, and at greater distances
PLCC
FODP
OLTE
2 MB/S
ADD DROP MUX
2 MB/S
VOICE
CARD
DATA
CARD
MICROWAVE RADIO
TERMINAL
OPGW
OPGW (optical ground wire) replaces
shield wires
Provides lightning protection
Provides communication
Lightning short circuit damage
Installation requires long term outage
Expensive
Superior performance
ADSS F.O
WRAP
ADSS
OPGW
AD\AS\RKG\JP\FIBCROSS
LOOSE TUBE
POLYESTER TAPE
XLPE SHEATH
AL TUBE
FIBRE
STRENGTH MEMBERS
ADSS
WRAP AROUND
OPGW
WRAP AROUND
ADSS
AD\AS\RKG\JP\FIBINST
SATELLITE COMMUNICATION
A geostationary satellite is
used as an active repeater.
Modulated signals are send
from earth VSATs in 6 GHz
band to the satellite.
Signals are beamed back to
earth in 4 GHz band.
Roundtime propagation delay
of 540ms exists
Communication is interrupted
during eclipses.
WHAT IS SCADA
Supervisory
FUNCTIONS OF SCADA
DATA ACQUISITION
PROCESSING OF ACQUIRED DATA.
LIMIT / STATUS MONITORING & ALARMING.
NETWORK STATUS PROCESSOR.
SEQUENCE OF EVENT RECORDING.
INFORMATION STORAGE & RETRIEVAL.
DATA EXCHANGE
SUPERVISORY CONTROL.
Karnataka
Warangal
Satellite
HYDERABAD
Ghanapur
Vijayawada
Andhra Pradesh
Lingasugur
Davangere
Chinkampalli
Bangalore
CHENNAI
MW Link
FO Link
State owneed Link
Sub-LDC
SLDC
Kannur-B
Pondy
Erode
UT of Pondy
Kerala
KALAMASSERY
Madurai
Vydyuthi Bhavanam
RCLDC
Tamilnadu
RAMAGUNDAM
PEDAPALLI
DURSHED
JAMMIKUNTA
GAJUWAKA
WARANGAL
VIZAG SW S
SHAP URNAGAR
VIDYUTH SOUDHA
GHANAP UR
BOMMUR
KAKINADA
CH .GUTTA
VTP S
HYDERABAD 400
BHIMADOLE
NSAGAR PH
VIJAYAWADA
TALLAPALLI
SRISAILAM PH
SRISAILAM LBPH
KURNOOL
APSEB
Lingasugur
HUBLI
SOMAYAJULAPALLI
RTUS
82
GOOTY
MUDDANOOR RTPP
DAVANAGERE
CHINAKAMPALLY
ANANTHAP UR
BANGALORE
KEB
CHENNAI
PONDY
RTUS
SOMANAHALLI
KUMBALGODI
SRIPERUMBUDUR
RTUS
05
SP.KOVIL
22
VILLIANUR
PONDY
KANNUR -B
SALEM400
CENTRAL
PANR UTI
SALEM230
NEYVELI
ERODE
SECTOR RTUS
22
CHIDAMB ARAM
INGUR
KOZHIKODE
LEGEND
RSCC (1)
MYLADUTURAI
CPCC (1)
PONGALORE
UDUMALPET
TRICHY
TRICHUR NORTH
ADANIKOTTAI
CHALAKUDI
MADUR AI400
RTUS
30
VIAKKAM
PALLOM
KAYANKUL AM
KUNDRA
KARAIKUDI
SIVAGANGA
MADURAI
TNEB
RTUS
PARIPALLI
SLDC (4)
SUB-LDC / SCC (14)
PUDUKOTTAI
THIRUMAYAM
KALAMASSERY
KSEB
KOVIL VENNI
THIR UVARUR
ORTHANADU
FIBRE
FIBRE
FIBRE
FIBRE
OPTIC
OPTIC
OPTIC
OPTIC
LINK 110/132kv
LINK (220kv)
LINK (400kv)
LINK (SEB)
40
Echengodu
Tanjore 230
Erode Sub-LDC
(Erode)
Pugalur
Chennai
Sub-LDC
(NLC TS-I)
Trichy 400
Paramakudi
Madurai North
Madurai
Sub LDC
Sivagangai
Karaikudi
Madurai 400
Podukotta Adanakottai
C
Orthonadu
Kovilvenni Thiruvarur
Theni
Kayathar
E
Sembatti
Pariyar PH
Sathur
Tuticorin Auto
Kodayar PH2
PLCC Link
S R Pudur
MW Link
FO Link
Kannur-B
Kozhikode -B
T. North
Chalakudy
Kalamassery
Vidyuthi
Bhavanam
Trivendrum
North
Paripally
Kundra
Kayamkulam
Pallom