Table B.1 Operating Time For Each Equipment
Table B.1 Operating Time For Each Equipment
APPENDIX B
Number of
Capacity
Feed
Feed Rate
Operating Time
equipment/s
(kg)
(kg)
(kg/hr)
(hr)
10000
40,236.47
10,000.00
10000*
39,466.22
10,000.00
10000
5,007.62
5,000.00
Magnetic Separator
5000*
44,473.84
10,000.00
Composter
20
4000*
44,433.30
930.00
48
Screen (Rotary)
10000
19,140.50
10,000.00
Pulverizer
5000*
19,140.50
10,000.00
Screen (Rotary)
10000
19,140.50
10,000.00
Mixer
10000
38,281.00
10,000.00
Granulator
10000
45,937.20
10,000.00
Rotary Dryer
10000
39,876.04
10,000.00
Clarifier
5000
12,646.40
5,000.00
Equipment
Trommel^
Shredder (Market &
Food Waste)
ii