Auto Transformer Test Reports (For Secondary)

This document is a test report for the secondary of an auto transformer used in the Khabat Thermal Power Plant Units 1&2 project in Kurdistan Regional Government, Iraq. It was prepared by KESİR Müh. Elektrik Şti. for the main contractor POSCO Engineering & Construction Co. Ltd. and lists the required test equipment and provides a site tests and commissioning report.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
350 views3 pages

Auto Transformer Test Reports (For Secondary)

This document is a test report for the secondary of an auto transformer used in the Khabat Thermal Power Plant Units 1&2 project in Kurdistan Regional Government, Iraq. It was prepared by KESİR Müh. Elektrik Şti. for the main contractor POSCO Engineering & Construction Co. Ltd. and lists the required test equipment and provides a site tests and commissioning report.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Contractor

Owner

Main Subcontractor

PROJECT NAME: Khabat Thermal Power Plant Units 1&2


OWNER: Ministry of Electricity of Kurdistan Regional Goverment
CONTRACTOR: POSCO Engineering & Construction Co. Ltd.
MAIN SUBCONTRACTOR: GAMA Power Systems Engineering &
Contracting Inc.
PROJE REFERENCE NO:
Re
v
A

Revision
Date
15.09.201
5

Description
For Review

Revision History
Created by
Checked by
A.E.
AKMAN

Emission
Status

Return
Status

B. GKCE

Vendor doc No.:

Vendor Logo

Approved by

Document Code :

Title, Subtitle

AUTO TRANSFORMER
TEST REPORT
(FOR SECONDARY)

Format
A4

Rev. A

Date
15.09.2015

Lang.
En

Date
15.09.2015

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

AUTO TRANSFORMER
TEST REPORT
(FOR SECONDARY)

ENG. N

SH/OF
2/3

CLIENT N

REV.

Summary
LIST OF REQUIRED TEST EQUIPMENT S
2.

SITE TESTS AND CHECKS COMMISSIONING REPORT

KESR Mh. Elektrik


ti.
Date
Name
Signature

Page

Revision
A

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

AUTO TRANSFORMER
TEST REPORT
(FOR SECONDARY)

ENG. N

SH/OF
3/3

CLIENT N

REV.

1. LIST OF REQUIRED TEST EQUIPMENTS


Test equipment
Designation / Manufacturer
FLUKE

Name
Signature

Type / Serial Nr

4
X

KESR Mh. Elektrik


ti.
Date

Test corresponding to paragraph