VT Test Prosedure
VT Test Prosedure
VT Test Prosedure
Owner
Main Subcontractor
Revision
Date
15.09.201
5
Description
For Review
Revision History
Created by
Checked by
A.E.
AKMAN
Emission
Status
Return
Status
B. GKCE
Vendor Logo
Approved by
Document Code :
Title, Subtitle
VT
TEST PROCEDURE
Format
A4
Rev. 0
Date
15.09.2015
Lang.
En
Date
15.09.2015
Project No.
ISSUE DATE
15/09/2015
ENG. N
VT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
2/7
0
SUMMARY
1.
2.
3.
4.
5.
6.
7.
7.1.
7.2.
8.
9.
10.
11.
PURPOSE OF TESTS
REFERENCE DOCUMENT
SCOPE
TERMINOLOGY
TEST EQUIPMENT UNDER TEST
TEST EQUIPMENT REQUIRED
GENERAL INSPECTION
MECHANICAL CHECKS
ELECTRICAL CHECKS
INSULATION RESISTANCE TEST
POLARITY TEST
TRANSFORMER TURNS RATIO TEST
RECORDING OF INSPECTION AND TEST DATA
3
3
3
3
3
3
4
4
4
4
6
6
7
Project No.
ISSUE DATE
15/09/2015
ENG. N
VT
TEST PROCEDURE
CLIENT N
REV.
1. PURPOSE OF TESTS
Check conformity with specifications. Check for satisfactory condition prior to energizing.
2. REFERENCE DOCUMENT
Electrical drawing N
3. SCOPE
All Voltage Transformers at MV switchyard
4. TERMINOLOGY
No applicable.
5. TEST EQUIPMENT UNDER TEST
The concerned equipments are all types of potential transformers
6. TEST EQUIPMENT REQUIRED
- RS polarity test set
or, if not available, storage battery,
milliammeter, and switch
- Megohmmeter, 500 V - 5 kV
- Ohmmeter
- Multimeter (volts, amperes, ohms, etc...)
- Auto transformer
- Step-up transformer
SH/OF
3/7
0
Project No.
ISSUE DATE
15/09/2015
ENG. N
VT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
4/7
0
7. GENERAL INSPECTION
7.1.
MECHANICAL CHECKS
- General visual inspection and compliance with drawings and manuals
- Check nameplate ratings and HV and LV terminal markings
- Check that all parts of the transformer are properly assembled and tight
- Check the HV connections for looseness, stressed terminals and poor grounding
- Check the cable connections on the LV side and the markings
- Check the oil levels and inspect for leakage (where applicable)
1/ Capacitor divider type
Check that all parts of the transformer are properly assembled and tight
Capacitors together
2/ Electromagnetic type
Check the intermediate connections
7.2.
ELECTRICAL CHECKS
- Check the equipment grounding (continuity and connections)
- Check the fuse ratings
- Perform the operation described in the following pages
Project No.
ISSUE DATE
15/09/2015
ENG. N
VT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
5/7
0
Project No.
ISSUE DATE
15/09/2015
ENG. N
VT
TEST PROCEDURE
CLIENT N
SH/OF
6/7
REV.
9. POLARITY TEST
The polarity is checked using the kick method (application of direct current) and check of
deflection on a bidirectional milliammeter.
This test is also used to check primary and secondary circuit continuity.
- When switch K is closed, the milliammeter pointer deflects upscale.
- When the circuit is opened, the milliammeter pointer deflects in the negative direction.
Project No.
ISSUE DATE
15/09/2015
ENG. N
VT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
7/7
0