The document is a process flow diagram and mass balance for an existing gas removal system. It shows 20 streams with information like source, destination, temperature, pressure, vapor fraction, and mass and mole flow rates. It indicates the system removes gas (H2O, CO2, H2S) from various sources and vents some gas through the cooling tower. Equipment in the system like the turbine, condensers, ejectors, pumps and cooling tower all show proper mass balancing within the system.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
689 views3 pages

Mass Balance and Process Flow Diagram of Existing GRS (Newest)

The document is a process flow diagram and mass balance for an existing gas removal system. It shows 20 streams with information like source, destination, temperature, pressure, vapor fraction, and mass and mole flow rates. It indicates the system removes gas (H2O, CO2, H2S) from various sources and vents some gas through the cooling tower. Equipment in the system like the turbine, condensers, ejectors, pumps and cooling tower all show proper mass balancing within the system.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Existing Gas Removal System Process Flow Diagram

Mass Balance Existing Gas Removal System (GRS)


Stream Number
Source
Destination
Temperature (oC)
Pressure (bara)
Vapor Fraction
Total Mass Flowrate (ton/hr)
Total Mole Flowrate (kmol/hr)
Individual Mass Flowrate (ton/hr)
H2O
CO2
H2S
Air (N2+O2)

1
Separator
Splitter
172,0
8,32
1,00
145,9920
8.033,3158

2
Splitter
T-01
172,0
8,32
1,00
139,6983
7.687,0107

3
Splitter
Splitter
169,1
7,78
1,00
6,2937
346,3051

4
T-01
E-01
54,7
0,16
1,00
139,6983
7.687,0107

5
CT-01
E-01
30,5
1,29
0,00
3.726,5191
207.028,8389

6
E-01
Splitter
54,7
0,16
1,00
2,7051
76,2774

7
E-03
E-01
56,7
1,19
0,00
73,9260
4.107,0000

8
E-02
E-01
54,1
0,51
0,00
107,2100
5.956,1111

9
E-01
Splitter
52,4
0,16
0,00
4.044,7020
224.705,6667

10
Splitter
JE-01
169,1
7,78
1,00
3,6845
202,7356

143,6122
2,2628
0,1167
-

137,4212
2,1653
0,1118
-

6,1910
0,0975
0,0049
-

137,4212
2,1653
0,1118
-

3.726,5191
-

0,4280
2,1653
0,1118
-

73,9260
-

107,2100
-

4.044,7020
-

3,6244
0,0571
0,0028
-

11
JE-01
E-02
117,9
0,51
1,00
6,3896
279,0160

12
P-03
E-02
30,5
1,29
0,00
103,4216
5.745,6444

13
E-02
Splitter
54,1
0,51
1,00
2,5970
68,3215

14
Splitter
JE-03
54,1
0,51
1,00
1,2984
34,1594

15
Splitter
JE-03
168,0
7,58
1,00
1,3046
71,7847

16
JE-03
Mixer
140,7
1,19
1,00
2,6030
105,9442

17
Splitter
JE-04
54,1
0,51
1,00
1,2984
34,1594

18
Splitter
JE-04
168,0
7,58
1,00
1,3046
71,7847

19
JE-04
Mixer
140,7
1,19
1,00
2,6030
105,9442

20
Mixer
E-03
140,7
1,19
1,00
5,2060
211,8883

4,0524
2,2224
0,1147
-

103,4216
-

0,2599
2,2224
0,1147
-

0,1299
1,1112
0,0574
-

1,2833
0,0202
0,0010
-

1,4132
1,1314
0,0584
-

0,1299
1,1112
0,0574
-

1,2833
0,0202
0,0010
-

1,4132
1,1314
0,0584
-

2,8264
2,2628
0,1169
-

28
CT-01
Atmosphere
65,0
1
1
200,6794
20.259,701

(Continued)
Stream Number
Source
Destination
Temperature (oC)
Pressure (bara)
Vapor Fraction
Total Mass Flowrate (ton/hr)
Total Mole Flowrate (kmol/hr)
Individual Mass Flowrate (ton/hr)
H2O
CO2
H2S
Air (N2+O2)

(Continued)
Stream Number
Source
Destination
Temperature (oC)
Pressure (bara)
Vapor Fraction
Total Mass Flowrate (ton/hr)
Total Mole Flowrate (kmol/hr)

21
Splitter
E-03
30,5
1,19
71,1600

22
E-02
CT-01
67,3
1,19
1,00
2,4386

23
Splitter
P-01
52,4
0,16
2.022,3510

24
Splitter
P-02
52,4
0,16
2.022,3510

25
Mixer
CT-01
52,4
1,50
4.044,7020

26
CT-01
Splitter
30,5
1,29
3.901,1007

27
Atmosphere
CT-01
25,0
1
1
54,6395

3.953,3333

58,1322

112.352,8333

112.352,8333

224.705,6667

216.727,8167

12.223,7197

Individual Mass Flowrate (ton/hr)


H2O
CO2
H2S
Air (N2+O2)

71,1600
-

0,0588
2,2628
0,1169
-

2.022,3510
-

2.022,3510
-

4.044,7020
-

3.901,1007
-

54,6395

143,6601
2,2628
0,1169
54,6395

Equipment Total Mass Balance Checking


Equipment Name (Code)
Turbine (T-01)
Main Condenser (E-01)
Steam Jet Gas Ejector 1st Stage A (JE-01)
Steam Jet Gas Ejector 1st Stage B (JE-02)
Inter Condenser (E-02)
Steam Jet Gas Ejector 2nd Stage A (JE-03)
Steam Jet Gas Ejector 2nd Stage B (JE-04)
After Condenser (E-03)
Hot Well Pump A (P-01)
Hot Well Pump B (P-02)
Cooling Tower (CT-01)
Primary Auxiliary Cooling Water Pump (P-03)

IN

OUT
139,70
4.047,35
6,39
109,81
2,60
2,60
76,37
2.022,35
2.022,35
4.101,78
174,58

139,70
4.047,41
6,39
109,81
2,60
2,60
76,36
2.022,35
2.022,35
4.101,78
174,58

Mass Difference
-

Status
balance
balance
balance
inactive
balance
balance
balance
balance
balance
balance
balance
balance

You might also like