Installation of Fire Detection System
Installation of Fire Detection System
28.07.2015
HO
HU
HP
REV
DATE
DESCRIPTION
PREP
CKD
APPR/AUT
H
OWNER
QAIWAN COMPANY FOR TRADING, GENERAL
CONTRACTS, OIL SERVICES AND GENERAL
TRANSPORT LTD.
CONTRACTOR
Document No
Sheet
Rev.
IQ347
IQ347-300-CN-PRO-00009
1/8
00A
Table of Contents
1.
PURPOSE
..........................................................................................................................................
3
2.
SCOPE
..........................................................................................................................................
3
3.
ACRONYMS
..........................................................................................................................................
3
4.
SAFETY
..........................................................................................................................................
3
5.
REFERENCES
..........................................................................................................................................
4
6.
RESPONSIBILITIES
..........................................................................................................................................
4
6.1. Construction Manager........................................................................................
6.2. E&I Superintendent / Supervisor / Electrical Field Engineer...................
6.3. QC E&I Engineer / Inspector.............................................................................
7.
TESTING & MEASURING EQUIPMENTS
..........................................................................................................................................
4
8.
PROCEDURE
..........................................................................................................................................
5
8.1. General Requirements.......................................................................................
8.2. Precaution During Installation.........................................................................
8.3. Installation of Equipment - General................................................................
9.
INSPECTION & TEST STATUS
..........................................................................................................................................
8
10.
ATTACHMENTS
..........................................................................................................................................
8
1. PURPOSE
This Quality Control Procedure defines the Quality Control activities and the
inspection & tests pertaining to the Installation of Fire Detection System.
2. SCOPE
The purpose of this procedure is to define the inspection and testing methods;
acceptance criteria for the Installation of Fire Detection System at Bazian
Combined Cycle Power Plant Project.
The procedure explains responsibilities of ENKA E&I Construction and QA/QC
departments with QAIWAN relevant department the Installation of Fire Detection
System. All these activities shall be subjected to international codes, standards
and good Engineering practices. It is intended to highlight the minimum test and
inspection requirements.
3. ACRONYMS
EDMS
PM
CM
QM
O/OR
CCPP
HSE
ITR
IP
RFI
AFC
PPE
QA/ QC
ITP
AFC
4. SAFETY
Relevant personnel shall adhere to the site HSE policies at all times with
emphasis on wearing the correct PPE and equipment.
Relevant personnel including third parties shall have safety induction prior to
entry on site.
All testing and measuring equipments shall be controlled daily prior to use by
Electrical Supervisor.
All testing and measuring equipments shall be inspected monthly and color
coded.
All Inspections & Tests described in this document shall be conducted in safe
manner and good engineering practice.
Hot surfaces and hot liquids shall be controlled and marked properly.
5. REFERENCES
IQ347-000-3PS-JQ07-00002
Installation
IQ347-300-QC-ITP-00022
IQ347-300-QC-ITP-00044
IQ347-300-QC-ITP-00045
Boxes
IQ347-000-3PS-JQ05-00001
System
IQ347-000-V1A-JQ05-00006
IQ347-300-HS-PRO-00030
IQ347-300-QM-PLN-00001
IQ347-300-HS-PLN-00001
6. RESPONSIBILITIES
6.1. Construction Manager
Shall be responsible for the overall implementation of this procedure and ensure
that the program supports the construction efforts of the project.
6.2. E&I Superintendent / Supervisor / Electrical Field Engineer
The E&I Superintendent / Instrument Supervisor shall be responsible for ensuring
that equipments are installed to an acceptable standard of workmanship and in
accordance with applicable drawings, data sheets and specifications as well as
making request for inspection (RFI) to Quality Department at each stage of work
as per the applicable ITP requirements.
6.3. QC E&I Engineer / Inspector
The QC E&I Engineer/ Inspector shall be responsible for verifying that work
carried out is complete, correct and meets the specified requirements.
7. TESTING & MEASURING EQUIPMENTS
All testing & measuring equipments shall have a valid calibration certificate
and sticker indicating the calibration date and next due.
8. PROCEDURE
8.1. General Requirements
All material received at site shall be inspected, handled and stored upon
receipt in accordance with Project Procedure for Field Material Control.
Field QA/QC inspection item check list sheet shall be used to report the status
of completed Installations.
Field QC inspection item check list sheet shall be used to report the status of
completed installations.
As most of the fire & gas detectors are sensitive to environmental conditions,
manufacturers recommendation / instructions on storage shall be followed.
Sensor heads shall be installed such that they are not adversely affected by
strong winds, sand/ dust, water sprays etc., which can block the sensor heads
or cause excessive drift or reduced output signals.
Sensor heads spacing and the location shall be in accordance with approved
for Construction drawings and supplier recommendation. However, the
Precise/actual location shall be decided as per instrument location plan and by
consulting with QAIWAN.
Sensors heads shall be located in a position that would readily detect hazards
and provide safe access for periodic maintenance and calibration. Power
supply and electronic circuit shall be located in a nonhazardous area,
preferably in auxiliary room of control center or field auxiliary room.
The post installation checks shall include but are not limited to the following:
Visibility of beacons, if provided and proper accessibility of system
components.
Supports shall be rigid and routing & clamping of cables are correct.
Tag numbers or equipment numbers are provided and numbers are clearly
visible from the ground level.
Inspection for correct polarity of alarms devices, bells, sirens, beacons etc.
and all other items where correctness of polarity is required.
ENKA, all Test forms/ sheets and records shall be prepared and submitted by
Vendor and ENKA to QAIWAN as per Project Specifications.
8.4.1 Supports
Prior to installation, the detectors and manual call points, tag number and type
shall be checked to ensure they are correct according to drawings.
Installation of Detectors and manual call points shall be checked to ensure the
positioning and mounting are as AFC drawings and to the approved method
and fixing as detailed in specification.
Where specified, sunshades shall be inspected to ensure they are as per the
detailed drawings and are securely fixed.
Installation of Detectors and manual call points shall be checked to ensure the
positioning and mounting are as AFC drawings and to the approved method
and fixing as detailed in specification.
Where specified, sunshades shall be inspected to ensure they are as per the
detailed drawings and are securely fixed.
Ensure that the installation of audible and visual alarms is carried out as per
item 8.4.2 above.
Ensure that end of line resistors (where applicable) are installed as per
detailed drawings.
Inspection and Testing shall be carried out based on this document and
applicable approved ITPs.
Inspection and Test results shall be recorded on relevant ITR indicated on the
applicable ITPs and shall be signed off by all parties involved without any
delay.
Inspection and Test status of each tagged items shall be maintained by ENKA
QA/QC department that all activities mentioned in ITPs are completed and
recorded on relevant ITRs.
Inspection and Test status of non-tagged items (if any) shall be separately
controlled and maintained the completion of work as per ITP.
10. ATTACHMENTS
None