The document summarizes cyclone pressure drop measurements taken during a kiln audit training at the Arasmeta Cement Plant from November 10-14, 2008. It shows the pressure drops in millimeters of water column for each stage of cyclones in the calciner string and kiln string, with notes that the pressure drop was higher than expected for the second stage cyclone in the kiln string.

Uploaded by

Tamer Fathy
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
696 views

Cyclone DP

The document summarizes cyclone pressure drop measurements taken during a kiln audit training at the Arasmeta Cement Plant from November 10-14, 2008. It shows the pressure drops in millimeters of water column for each stage of cyclones in the calciner string and kiln string, with notes that the pressure drop was higher than expected for the second stage cyclone in the kiln string.

Uploaded by

Tamer Fathy
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 2

Arasmeta Cement Plant

Kiln Audit Training

10th November to 14th November 2008

CYCLONE PRESSURE DROPS


CALCINER STRING

KILN STRING
CYCLONE

PRESSURE

CYCLONE

DROP mmWC

DROP mmWC
STAGE 1

STAGE 2

119

PRESSURE

STAGE 1

223#

STAGE 2

90

STAGE 3

211

36

STAGE 3

115

STAGE 4

107

STAGE 4
STAGE 5 +
CALCINER + TAD

169

# Expected pressure drop with LP cyclone approx.


80 mmWC.