Auto Cone Comparison
Auto Cone Comparison
Descriptions
Average yarn faults per 100 km/spindle
spindles per machine
cutting on whole machine
time taken in each cut
total time taken per nine macines
for every cut there is a splice
yarn consumed per splice
compressed air per splice
total yarn consumed on extra cutting lbs
total air consumed on extra cuts
schlafhorst
338
Muratec 21-C
75
60
4500
8 sec
2.22
75
60
4500
6.5 sec
1.80
2.15 yds
9 ltr
68.99
4852054.08
2.15 yds
9 ltr
68.99
4852054.075
Lets suppose both machines are running 20s co cmh pk ctn and avg YF are same on both machines.
these YF values related to per 100 Km.
suppose the total production capacity of mill is :
average number of spindles on one machine = 60 spindles (auto cone)
suppose total of 9 auto cone machines are required to fulfill the below target production
the faults given are only classimat faults , other machine faults i.e, tension, additional and system faults are not included
in calculation plus Yarn joints on cop change are also not considered in calculation
if all machines are schlafhorst 338
total frames ring
20
spindle per frame
960
total spindle
19200
nominal Ne
20
OPS
13
total bags/day
468
length per cone meters
63997.759
cuts per cone
47998.319
total length wound per day 718822.83
average winding speed
1300
doff time one cone
49.229045
total faults per day
539117.12
total time taken in splice
4312937
2.218589
efficiency lost
9.2441207
Muratec
21-C
same
8 sec
2.219
9.244
78
same
6 sec
1.803
7.511
78
nil
2 sec
-0.416
-1.733
nil
70.78968
72.141342
1.351662
Difference
efficiency lost
Wastages (extra being incurred due to YF )
Hard waste/ 100km/machine
Hard waste /64 km/cone
production of 9 machines/day
total no. of cones
hard waste on total prod./day
hard waste on total prod./month
cost (bag@ Rs.9000/bag)
Rs
compressed Air consumption
extra air consumed/100km/macine
extra air consumed /63.5km/macine
extra air consumed /63.5km/spindle
total air consumed on 9 machines
capacity of 45KW comp air compresser
compressor working
Extra consumption of elec. Unit(BTU)
Cost of 1KWH
Cost of extra units consumed
9675 yds
0.575892857 lbs
103.2
0.006142857 lbs
468 bags
11232
68.99657143
16.55917714
149032.5943
418800 ltr/hour
Rs. 4/unit
Time losses
time loss per day due to schlafhorst 338
production loss due to extra timing
total production loss
Cost(@Rs. 9000/bag)
1.73
km
m/min
min
sec
hr
%
@ 100 % efficiency
20
960
19200
20
13
468
63997.759
47998.319
718822.83
1300
49.229045
539117.12
3504261.3
1.8026035
7.5108481
km
m/min
min
sec
hr
%
@ 100 % efficiency