0% found this document useful (0 votes)
128 views16 pages

Rodolfo Castillo: 1 Project Schedule Precon Submtl 2 3.4 N/A A N

This transmittal form is submitting shop drawings, equipment data, material samples, or manufacturer's certificates of compliance for approval related to Contract No. W91278-13-D-0012 0005 for the Five Bridges Upper Huallaga Valley project in Peru. Item 1 is submitting a project schedule for Section 01 32 01.00 10. Item 2 is submitting preconstruction submittals. This transmittal is a new submittal from Partenon Contratistas E.I.R.L. for review by the Peru Project Office of USACE Lima-Peru.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views16 pages

Rodolfo Castillo: 1 Project Schedule Precon Submtl 2 3.4 N/A A N

This transmittal form is submitting shop drawings, equipment data, material samples, or manufacturer's certificates of compliance for approval related to Contract No. W91278-13-D-0012 0005 for the Five Bridges Upper Huallaga Valley project in Peru. Item 1 is submitting a project schedule for Section 01 32 01.00 10. Item 2 is submitting preconstruction submittals. This transmittal is a new submittal from Partenon Contratistas E.I.R.L. for review by the Peru Project Office of USACE Lima-Peru.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

DATE

TRANSMITTAL NO.
05/28/2015

01 32 01.00 10-1

(Read instructions on the reverse side prior to initiating this form)

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS


TO:

Peru Project Office (LL)


USACE LIMA-PERU
Unit 3230 Box 0125 (52)
DPO AA 34031

FROM:

Jr. Miguel Grau N.1380 Barrio Partido Alto

DESCRIPTION OF ITEM SUBMITTED


(Type size, model number/etc.)

a.

W91278-13-D-0012 0005

Tarapoto,

SPECIFICATION SEC. NO. (Cover only one section with each


transmittal)
01 32 01.00 10
ITEM
NO.

PARTENON CONTRATISTAS E.I.R.L.

(This section will be initiated by the contractor)


CONTRACT NO.

b.

Project Schedule

PROJECT TITLE AND LOCATION


01-Main Register
PER-D/B HAP 23766 FIVE BRIDGES UPPER HUALLAGA VALLEY, LEONCIO PRADO, PERU
MFG OR CONTR.
CAT., CURVE
DRAWING OR
BROCHURE NO.
(See instruction no. 8)
c.

PRECON SUBMTL

NO.
OF
COPIES
d.

CONTRACT REFERENCE
DOCUMENT
SPEC.
PARA. NO.
e.

3.4

DRAWING
SHEET NO.
f.

CHECK ONE:
X THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL ___________
CHECK ONE: THIS TRANSMITTAL IS
FOR
FIO X GA
DA
CR
FOR
VARIATION
CONTRACTOR
(See
USE CODE
Instruction
No. 6)

N/A

g.

h.

FOR
CE
USE
CODE
i.

I certify that the above submitted items have been reviewed


in detail and are correct and in the strict conformance with the
contract drawings and specifications except as otherwise
stated.
Firmado digitalmente por Rodolfo Castillo

REMARKS

Rodolfo
Castillo

Nombre de reconocimiento (DN):


cn=Rodolfo Castillo, o=Partenon
Contratistas EIRL, ou=PROJECT MANAGER,
[email protected],
c=PE
Fecha: 2015.05.28 23:18:53 -05'00'

NAME AND SIGNATURE OF CONTRACTOR

SECTION II - APPROVAL ACTION


ENCLOSURES RETURNED (List by item No.)

ENG FORM 4025, MAR 95

NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY

(ER 415-1-10)

EDITION OF SEP 93 IS OBSOLETE.

SHEET 1 OF 1

DATE

(Proponent: CEMP-CE)

CONTRACT:
W91278-13-D-0012
Task Order 0005

DESIGN / BUILD
FIVE BRIDGES UPPER HUALLAGA VALLEY
LEONCIO PRADO, PERU

PROJECT SCHEDULE
AGUAJE BRIDGE

Id
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

Texto1

Task Name

Duracin

01 PUENTE AGUAJE
01.01
DEMOLICION DE ESTRUCTURAS EXISTENTES
01.01.01
DEMOLICION DE CONCRETO SIMPLE
01.01.02
ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 M )
01.01.03
DESMONTAJE PUENTE MADERA ROLLIZA
01.02
TRABAJOS EN EL SITIO
01.02.01
ALMACEN Y GUARDIANIA
01.02.02
TRAZO Y REPLANTEO
01.02.03
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
01.02.04
ENERGIA ELECTRICA TEMPORAL
01.03
ACCESOS DE PUENTE
01.03.01
MOVIMIENTO DE TIERRAS
01.03.01.01
EXCAVACION CON EQUIPO EN ACCESOS
01.03.01.02
CONFORMACION DE TERRAPLENES EN ACCESOS, CAPAS DE E=0.20 m.
01.03.02
CUNETAS DE DRENAJE PLUVIAL
01.03.02.01
PERFILADO DE CUNETAS C/MAQ.
01.03.02.02
CONCRETO F'C=210 KG/CM2 EN CUNETAS
01.03.02.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN CUNETAS
01.03.02.04
ENCOFRADO Y DESENCOFRADO EN CUNETAS
01.03.02.05
JUNTA DE DILATACION EN CUNETAS
01.03.03
LOSA DE APROXIMACION
01.03.03.01
PERFILADO PARA LOSA DE APROXIMACION
01.03.03.02
CONCRETO F'C=210 KG/CM2 EN LOSA DE APROXIMACION
01.03.03.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN LOSA DE APROXIMACION
01.03.03.04
ENCOFRADO Y DESENCOFRADO EN LOSA DE APROXIMACIN
01.03.03.05
JUNTA DE DILATACIN EN LOSA DE APROXIMACIN/ESTRIBO
01.04
ACCESOS PROVISIONAL
01.04.01
MEJORAMIENTO ACCESO PROVISIONAL
01.05
SUB ESTRUCTURA
01.05.01
MOVIMIENTO DE TIERRAS
01.05.01.01
EXCAVACION DE TIERRA BAJO AGUA C/MAQ.
01.05.01.02
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN ESTRIBOS
01.05.01.03
RELLENO CON MATERIAL PROPIO SELECCIONADO EN ESTRIBOS
01.05.01.04
CAMA DE ARENA CON MATERIAL GRANULAR
01.05.02
OBRAS DE CONCRETO SIMPLE
01.05.02.01
SOLADO DE CONCRETO DE 4"
01.05.02.02
CONCRETO F'C=210 KG/CM2 EN ESTRIBOS + 30% P.G.
01.05.02.03
ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS
01.05.03
DRENAJE
01.05.03.01
TUBERIA PVC CLASE 10, 3"
01.06
SUPERESTRUCTURA
01.06.01
OBRAS DE CONCRETO ARMADO
01.06.01.01
CONCRETO ARMADO F'C=280 KG/CM2 EN SUPERESTRUCTURA
01.06.01.02
ENCOFRADO Y DESENCOFRADO CARAVISTA EN SUPERESTRUCTURA
01.06.01.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN SUPERESTRUCTURA
01.06.01.04
FALSO PUENTE
01.06.02
JUNTAS
01.06.02.01
JUNTA DE DILATACIN APOYO FIJO
01.06.02.02
JUNTA DE DILATACIN APOYO MVIL

Project: cronograma malanoche


Date: jue 28/05/15

Comienzo

Fin

100 das
lun 01/06/15 mi 09/09/15
4 das mar 02/06/15 sb 06/06/15
3 das mar 02/06/15
vie 05/06/15
3 das mi 03/06/15 sb 06/06/15
1 da
jue 04/06/15
vie 05/06/15
5 das
lun 01/06/15 sb 06/06/15
2 das
lun 01/06/15 mi 03/06/15
2 das mi 03/06/15
vie 05/06/15
1 da
vie 05/06/15 sb 06/06/15
1 da mi 03/06/15
jue 04/06/15
38 das sb 04/07/15 mar 11/08/15
24 das sb 04/07/15 mar 28/07/15
4 das sb 04/07/15 mi 08/07/15
20 das mi 08/07/15 mar 28/07/15
14 das mar 28/07/15 mar 11/08/15
1 da mar 28/07/15 mi 29/07/15
4 das
jue 06/08/15
lun 10/08/15
4 das mi 29/07/15 dom 02/08/15
4 das dom 02/08/15
jue 06/08/15
1 da
lun 10/08/15 mar 11/08/15
13 das mar 28/07/15
lun 10/08/15
1 da mar 28/07/15 mi 29/07/15
3 das
jue 06/08/15 dom 09/08/15
4 das mi 29/07/15 dom 02/08/15
4 das dom 02/08/15
jue 06/08/15
1 da dom 09/08/15
lun 10/08/15
3 das sb 06/06/15 mar 09/06/15
3 das sb 06/06/15 mar 09/06/15
31 das mar 09/06/15
vie 10/07/15
24 das mar 09/06/15
vie 03/07/15
2 das
jue 11/06/15 sb 13/06/15
2 das mar 09/06/15
jue 11/06/15
3 das mar 30/06/15
vie 03/07/15
2 das sb 13/06/15
lun 15/06/15
25 das
lun 15/06/15
vie 10/07/15
1 da
lun 15/06/15 mar 16/06/15
18 das
jue 18/06/15
lun 06/07/15
24 das mar 16/06/15
vie 10/07/15
1 da mar 16/06/15 mi 17/06/15
1 da mar 16/06/15 mi 17/06/15
37 das mar 28/07/15
jue 03/09/15
35 das mar 28/07/15 mar 01/09/15
6 das mi 26/08/15 mar 01/09/15
10 das dom 09/08/15 mi 19/08/15
8 das mar 18/08/15 mi 26/08/15
10 das mar 28/07/15
vie 07/08/15
17 das dom 09/08/15 mi 26/08/15
1 da mar 25/08/15 mi 26/08/15
1 da mar 25/08/15 mi 26/08/15

junio
julio
agosto
septiembre
17/05 24/05 31/05 07/06 14/06 21/06 28/06 05/07 12/07 19/07 26/07 02/08 09/08 16/08 23/08 30/08 06/09 13/09 2

Task

External Milestone

solo duracin

Hito externo

Split

Tarea inactiva

Informe de resumen manual

Progress

Milestone

Hito inactivo

Resumen manual

Deadline

Summary

Hito inactivo

solo el comienzo

Project Summary

Resumen inactivo

solo fin

External Tasks

Tarea manual

Tareas externas
Page 1

Id

Texto1

50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

01.06.02.03
01.06.03
01.06.03.01
01.06.04
01.06.04.01
01.06.05
01.06.05.01
01.07
01.07.01
01.08
01.08.01
01.08.02
01.08.03
01.08.04
01.08.05
01.08.06
01.09
01.09.01

Task Name

Duracin

NEOPRENE SHORE DE (0.45 X 0.30 X 0.05)


BARANDAS
BARANDAS METALICAS INC. ARENADO, TRANSPORTE, PINTURA E INSTALACIN
DRENAJE
TUBERIA PVC CLASE 10, 3"
PAVIMENTOS
CARPETA ASFALTICA EN FRIO DE 2"
SEALIZACION
SEALES INFORMATIVAS SEGUN DISEO INC. SUMINISTRO Y COLOC.
PROTECCION DE MARGENES CON GAVIONES
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN GAVIONES
SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 1.0x1.0x4.0
SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 0.5x1.0x4.0
SUMINISTRO E INSTALACIN GEOTEXTIL MACTEX N40.1
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION COLCHON RENO 0.3 X 2.0 X 4.
LLENADO CON PIEDRAS GAVION COLCHON RENO 0.3 X 2.0 X 4.0
REFORESTACION DE TERRAPLENES
REFORESTACION EN TALUDES DE ACCESO

Project: cronograma malanoche


Date: jue 28/05/15

Comienzo

1 da dom 09/08/15
10 das dom 16/08/15
10 das dom 16/08/15
1 da dom 09/08/15
1 da dom 09/08/15
2 das mar 01/09/15
2 das mar 01/09/15
1 da
jue 03/09/15
1 da
jue 03/09/15
13 das
vie 03/07/15
3 das
vie 03/07/15
10 das
lun 06/07/15
4 das dom 12/07/15
4 das dom 12/07/15
3 das sb 04/07/15
5 das sb 04/07/15
6 das
jue 03/09/15
6 das
jue 03/09/15

Fin
lun 10/08/15
mi 26/08/15
mi 26/08/15
lun 10/08/15
lun 10/08/15
jue 03/09/15
jue 03/09/15
vie 04/09/15
vie 04/09/15
jue 16/07/15
lun 06/07/15
jue 16/07/15
jue 16/07/15
jue 16/07/15
mar 07/07/15
jue 09/07/15
mi 09/09/15
mi 09/09/15

junio
julio
agosto
septiembre
17/05 24/05 31/05 07/06 14/06 21/06 28/06 05/07 12/07 19/07 26/07 02/08 09/08 16/08 23/08 30/08 06/09 13/09 2

Task

External Milestone

solo duracin

Hito externo

Split

Tarea inactiva

Informe de resumen manual

Progress

Milestone

Hito inactivo

Resumen manual

Deadline

Summary

Hito inactivo

solo el comienzo

Project Summary

Resumen inactivo

solo fin

External Tasks

Tarea manual

Tareas externas
Page 2

CONTRACT:
W91278-13-D-0012
Task Order 0005

DESIGN / BUILD
FIVE BRIDGES UPPER HUALLAGA VALLEY
LEONCIO PRADO, PERU

PROJECT SCHEDULE
TARAPOTO BRIDGE

Id
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Texto1

Task Name

Duracin

01 PUENTE TARAPOTO
01.01
DEMOLICION DE ESTRUCTURAS EXISTENTES
01.01.01
DEMOLICION DE CONCRETO SIMPLE
01.01.02
ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 M )
01.01.03
DESMONTAJE PUENTE MADERA ROLLIZA
01.02
TRABAJOS EN EL SITIO
01.02.01
ALMACEN Y GUARDIANIA
01.02.02
TRAZO Y REPLANTEO
01.02.03
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
01.02.04
ENERGIA ELECTRICA TEMPORAL
01.03
ACCESOS DE PUENTE
01.03.01
MOVIMIENTO DE TIERRAS
01.03.01.01
EXCAVACION CON EQUIPO EN ACCESOS
01.03.01.02
CONFORMACION DE TERRAPLENES EN ACCESOS, CAPAS DE E=0.20 m.
01.03.02
CUNETAS DE DRENAJE PLUVIAL
01.03.02.01
PERFILADO DE CUNETAS C/MAQ.
01.03.02.02
CONCRETO F'C=210 KG/CM2 EN CUNETAS
01.03.02.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN CUNETAS
01.03.02.04
ENCOFRADO Y DESENCOFRADO EN CUNETAS
01.03.02.05
JUNTA DE DILATACION EN CUNETAS
01.03.03
LOSA DE APROXIMACION
01.03.03.01
PERFILADO PARA LOSA DE APROXIMACION
01.03.03.02
CONCRETO F'C=210 KG/CM2 EN LOSA DE APROXIMACION
01.03.03.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN LOSA DE APROXIMACION
01.03.03.04
ENCOFRADO Y DESENCOFRADO EN LOSA DE APROXIMACIN
01.03.03.05
JUNTA DE DILATACIN EN LOSA DE APROXIMACIN/ESTRIBO
01.04
ACCESOS PROVISIONAL
01.04.01
MEJORAMIENTO ACCESO PROVISIONAL
01.05
SUB ESTRUCTURA
01.05.01
MOVIMIENTO DE TIERRAS
01.05.01.01
EXCAVACION DE TIERRA BAJO AGUA C/MAQ.
01.05.01.02
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN ESTRIBOS
01.05.01.03
RELLENO CON MATERIAL PROPIO SELECCIONADO EN ESTRIBOS
01.05.01.04
CAMA DE ARENA CON MATERIAL GRANULAR
01.05.02
OBRAS DE CONCRETO SIMPLE
01.05.02.01
SOLADO DE CONCRETO DE 4"
01.05.02.02
CONCRETO F'C=210 KG/CM2 EN ESTRIBOS + 30% P.G.
01.05.02.03
ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS
01.05.03
DRENAJE
01.05.03.01
TUBERIA PVC CLASE 10, 3"
01.06
SUPERESTRUCTURA
01.06.01
OBRAS DE CONCRETO ARMADO
01.06.01.01
CONCRETO ARMADO F'C=280 KG/CM2 EN SUPERESTRUCTURA
01.06.01.02
ENCOFRADO Y DESENCOFRADO CARAVISTA EN SUPERESTRUCTURA
01.06.01.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN SUPERESTRUCTURA
01.06.01.04
FALSO PUENTE
01.06.02
JUNTAS
01.06.02.01
JUNTA DE DILATACIN APOYO FIJO
01.06.02.02
JUNTA DE DILATACIN APOYO MVIL
01.06.02.03
NEOPRENE SHORE DE (0.45 X 0.30 X 0.05)
01.06.03
BARANDAS
01.06.03.01
BARANDAS METALICAS INC. ARENADO, TRANSPORTE, PINTURA E INSTALACIN
01.06.04
DRENAJE
01.06.04.01
TUBERIA PVC CLASE 10, 3"
01.06.05
PAVIMENTOS
01.06.05.01
CARPETA ASFALTICA EN FRIO DE 2"
01.07
SEALIZACION
01.07.01
SEALES INFORMATIVAS SEGUN DISEO INC. SUMINISTRO Y COLOC.
01.08
PROTECCION DE MARGENES CON GAVIONES
01.08.01
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN GAVIONES

Project: cronograma malanoche


Date: jue 28/05/15

70 das
4 das
3 das
3 das
1 da
5 das
2 das
2 das
1 da
1 da
36 das
22 das
4 das
18 das
14 das
1 da
4 das
4 das
4 das
1 da
8 das
1 da
2 das
2 das
2 das
1 da
2 das
2 das
23 das
15 das
1 da
2 das
2 das
2 das
18 das
1 da
13 das
17 das
1 da
1 da
19 das
18 das
4 das
6 das
4 das
3 das
9 das
1 da
1 da
1 da
8 das
8 das
1 da
1 da
1 da
1 da
1 da
1 da
13 das
3 das

Comienzo

junio
julio
agosto
septiembre
octubre
noviembre
diciembre
24/05 31/05 07/06 14/06 21/06 28/06 05/07 12/07 19/07 26/07 02/08 09/08 16/08 23/08 30/08 06/09 13/09 20/09 27/09 04/10 11/10 18/10 25/10 01/11 08/11 15/11 22/11 29/11 06/12 13/12 2

jue 01/10/15
vie 02/10/15
vie 02/10/15
sb 03/10/15
dom 04/10/15
jue 01/10/15
jue 01/10/15
sb 03/10/15
lun 05/10/15
sb 03/10/15
sb 24/10/15
sb 24/10/15
sb 24/10/15
mi 28/10/15
dom 15/11/15
dom 15/11/15
mar 24/11/15
lun 16/11/15
vie 20/11/15
sb 28/11/15
dom 15/11/15
dom 15/11/15
vie 20/11/15
lun 16/11/15
mi 18/11/15
dom 22/11/15
mar 06/10/15
mar 06/10/15
jue 08/10/15
jue 08/10/15
sb 10/10/15
jue 08/10/15
mi 21/10/15
dom 11/10/15
mar 13/10/15
mar 13/10/15
vie 16/10/15
mi 14/10/15
mi 14/10/15
mi 14/10/15
dom 15/11/15
dom 15/11/15
dom 29/11/15
vie 20/11/15
mi 25/11/15
dom 15/11/15
vie 20/11/15
sb 28/11/15
sb 28/11/15
vie 20/11/15
sb 21/11/15
sb 21/11/15
vie 20/11/15
vie 20/11/15
jue 03/12/15
jue 03/12/15
vie 04/12/15
vie 04/12/15
vie 23/10/15
vie 23/10/15

Task

Project Summary

Tarea inactiva

Slo duracin

Slo fin

Split

External Tasks

Hito inactivo

Informe de resumen manual

Progress

Milestone

External Milestone

Resumen inactivo

Resumen manual

Deadline

Summary

Tarea inactiva

Tarea manual

Slo el comienzo

Page 1

Id
61
62
63
64
65
66
67

Texto1
01.08.02
01.08.03
01.08.04
01.08.05
01.08.06
01.09
01.09.01

Task Name

Duracin

SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 1.0x1.0x4.0


SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 0.5x1.0x4.0
SUMINISTRO E INSTALACIN GEOTEXTIL MACTEX N40.1
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION COLCHON RENO 0.3 X 2.0 X 4.
LLENADO CON PIEDRAS GAVION COLCHON RENO 0.3 X 2.0 X 4.0
REFORESTACION DE TERRAPLENES
REFORESTACION EN TALUDES DE ACCESO

Project: cronograma malanoche


Date: jue 28/05/15

10 das
4 das
4 das
3 das
5 das
6 das
6 das

Comienzo
lun 26/10/15
dom 01/11/15
dom 01/11/15
sb 24/10/15
sb 24/10/15
vie 04/12/15
vie 04/12/15

junio
julio
agosto
septiembre
octubre
noviembre
diciembre
24/05 31/05 07/06 14/06 21/06 28/06 05/07 12/07 19/07 26/07 02/08 09/08 16/08 23/08 30/08 06/09 13/09 20/09 27/09 04/10 11/10 18/10 25/10 01/11 08/11 15/11 22/11 29/11 06/12 13/12 2

Task

Project Summary

Tarea inactiva

Slo duracin

Slo fin

Split

External Tasks

Hito inactivo

Informe de resumen manual

Progress

Milestone

External Milestone

Resumen inactivo

Resumen manual

Deadline

Summary

Tarea inactiva

Tarea manual

Slo el comienzo

Page 2

CONTRACT:
W91278-13-D-0012
Task Order 0005

DESIGN / BUILD
FIVE BRIDGES UPPER HUALLAGA VALLEY
LEONCIO PRADO, PERU

PROJECT SCHEDULE
PUCAYAQUILLA BRIDGE

Id
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Texto1

Task Name

Duracin

Comienzo

Fin
24/05

01 PUENTE PUCAYAQUILLO
01.01
DEMOLICION DE ESTRUCTURAS EXISTENTES
01.01.01
DEMOLICION DE CONCRETO SIMPLE
01.01.02
ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 M )
01.01.03
DESMONTAJE PUENTE MADERA ROLLIZA
01.02
TRABAJOS EN EL SITIO
01.02.01
ALMACEN Y GUARDIANIA
01.02.02
TRAZO Y REPLANTEO
01.02.03
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
01.02.04
ENERGIA ELECTRICA TEMPORAL
01.03
ACCESOS DE PUENTE
01.03.01
MOVIMIENTO DE TIERRAS
01.03.01.01
EXCAVACION CON EQUIPO EN ACCESOS
01.03.01.02
CONFORMACION DE TERRAPLENES EN ACCESOS, CAPAS DE E=0.20 m.
01.03.02
CUNETAS DE DRENAJE PLUVIAL
01.03.02.01
PERFILADO DE CUNETAS C/MAQ.
01.03.02.02
CONCRETO F'C=210 KG/CM2 EN CUNETAS
01.03.02.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN CUNETAS
01.03.02.04
ENCOFRADO Y DESENCOFRADO EN CUNETAS
01.03.02.05
JUNTA DE DILATACION EN CUNETAS
01.03.03
LOSA DE APROXIMACION
01.03.03.01
PERFILADO PARA LOSA DE APROXIMACION
01.03.03.02
CONCRETO F'C=210 KG/CM2 EN LOSA DE APROXIMACION
01.03.03.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN LOSA DE APROXIMACION
01.03.03.04
ENCOFRADO Y DESENCOFRADO EN LOSA DE APROXIMACIN
01.03.03.05
JUNTA DE DILATACIN EN LOSA DE APROXIMACIN/ESTRIBO
01.04
ACCESOS PROVISIONAL
01.04.01
MEJORAMIENTO ACCESO PROVISIONAL
01.05
SUB ESTRUCTURA
01.05.01
MOVIMIENTO DE TIERRAS
01.05.01.01
EXCAVACION DE TIERRA BAJO AGUA C/MAQ.
01.05.01.02
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN ESTRIBOS
01.05.01.03
RELLENO CON MATERIAL PROPIO SELECCIONADO EN ESTRIBOS
01.05.01.04
CAMA DE ARENA CON MATERIAL GRANULAR
01.05.02
OBRAS DE CONCRETO SIMPLE
01.05.02.01
SOLADO DE CONCRETO DE 4"
01.05.02.02
CONCRETO F'C=210 KG/CM2 EN ESTRIBOS + 30% P.G.
01.05.02.03
ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS
01.05.03
DRENAJE
01.05.03.01
TUBERIA PVC CLASE 10, 3"
01.06
SUPERESTRUCTURA
01.06.01
OBRAS DE CONCRETO ARMADO
01.06.01.01
CONCRETO ARMADO F'C=280 KG/CM2 EN SUPERESTRUCTURA
01.06.01.02
ENCOFRADO Y DESENCOFRADO CARAVISTA EN SUPERESTRUCTURA
01.06.01.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN SUPERESTRUCTURA
01.06.01.04
FALSO PUENTE
01.06.02
JUNTAS
01.06.02.01
JUNTA DE DILATACIN APOYO FIJO
01.06.02.02
JUNTA DE DILATACIN APOYO MVIL
01.06.02.03
NEOPRENE SHORE DE (0.45 X 0.30 X 0.05)
01.06.03
BARANDAS
01.06.03.01
BARANDAS METALICAS INC. ARENADO, TRANSPORTE, PINTURA E INSTALACIN
01.06.04
DRENAJE
01.06.04.01
TUBERIA PVC CLASE 10, 3"
01.06.05
PAVIMENTOS
01.06.05.01
CARPETA ASFALTICA EN FRIO DE 2"
01.07
SEALIZACION
01.07.01
SEALES INFORMATIVAS SEGUN DISEO INC. SUMINISTRO Y COLOC.
01.08
PROTECCION DE MARGENES CON GAVIONES
01.08.01
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN GAVIONES

Project: cronograma malanoche


Date: jue 28/05/15

junio
31/05

07/06

14/06

21/06

julio
28/06

05/07

12/07

19/07

26/07

agosto
02/08

80 das mi 01/07/15 sb 19/09/15


4 das
jue 02/07/15
lun 06/07/15
3 das
jue 02/07/15 dom 05/07/15
3 das
vie 03/07/15
lun 06/07/15
1 da sb 04/07/15 dom 05/07/15
5 das mi 01/07/15
lun 06/07/15
2 das mi 01/07/15
vie 03/07/15
2 das
vie 03/07/15 dom 05/07/15
1 da dom 05/07/15
lun 06/07/15
1 da
vie 03/07/15 sb 04/07/15
33 das dom 02/08/15
vie 04/09/15
19 das dom 02/08/15
vie 21/08/15
4 das dom 02/08/15
jue 06/08/15
15 das
jue 06/08/15
vie 21/08/15
14 das
vie 21/08/15
vie 04/09/15
1 da
vie 21/08/15 sb 22/08/15
4 das dom 30/08/15
jue 03/09/15
4 das sb 22/08/15 mi 26/08/15
4 das mi 26/08/15 dom 30/08/15
1 da
jue 03/09/15
vie 04/09/15
8 das
vie 21/08/15 sb 29/08/15
1 da
vie 21/08/15 sb 22/08/15
2 das mi 26/08/15
vie 28/08/15
2 das sb 22/08/15
lun 24/08/15
2 das
lun 24/08/15 mi 26/08/15
1 da
vie 28/08/15 sb 29/08/15
3 das
lun 06/07/15
jue 09/07/15
3 das
lun 06/07/15
jue 09/07/15
30 das
jue 09/07/15 sb 08/08/15
23 das
jue 09/07/15 sb 01/08/15
3 das sb 11/07/15 mar 14/07/15
2 das
jue 09/07/15 sb 11/07/15
3 das mi 29/07/15 sb 01/08/15
2 das mar 14/07/15
jue 16/07/15
23 das
jue 16/07/15 sb 08/08/15
1 da
jue 16/07/15
vie 17/07/15
18 das dom 19/07/15
jue 06/08/15
22 das
vie 17/07/15 sb 08/08/15
1 da
vie 17/07/15 sb 18/07/15
1 da
vie 17/07/15 sb 18/07/15
23 das
vie 21/08/15 dom 13/09/15
22 das
vie 21/08/15 sb 12/09/15
4 das mar 08/09/15 sb 12/09/15
8 das
jue 27/08/15
vie 04/09/15
5 das
jue 03/09/15 mar 08/09/15
4 das
vie 21/08/15 mar 25/08/15
12 das
jue 27/08/15 mar 08/09/15
1 da
lun 07/09/15 mar 08/09/15
1 da
lun 07/09/15 mar 08/09/15
1 da
jue 27/08/15
vie 28/08/15
10 das sb 29/08/15 mar 08/09/15
10 das sb 29/08/15 mar 08/09/15
1 da
jue 27/08/15
vie 28/08/15
1 da
jue 27/08/15
vie 28/08/15
1 da sb 12/09/15 dom 13/09/15
1 da sb 12/09/15 dom 13/09/15
1 da dom 13/09/15
lun 14/09/15
1 da dom 13/09/15
lun 14/09/15
41 das sb 01/08/15
vie 11/09/15
3 das sb 01/08/15 mar 04/08/15

Task

Project Summary

Tarea inactiva

Slo duracin

Slo fin

Split

External Tasks

Hito inactivo

Informe de resumen manual

Progress

Milestone

External Milestone

Resumen inactivo

Resumen manual

Deadline

Summary

Tarea inactiva

Tarea manual

Slo el comienzo

Page 1

09/08

16/08

23/08

septiembre
30/08 06/09

13/09

20/09

Id
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

Texto1
01.08.02
01.08.03
01.08.04
01.08.05
01.08.06
01.08.07
01.08.08
01.08.09
01.08.10
01.08.11
01.08.12
01.08.13
01.08.14
01.09
01.09.01

Task Name

Duracin

SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 1.0x1.0x4.0


SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 0.5x1.0x4.0
SUMINISTRO E INSTALACIN GEOTEXTIL MACTEX N40.1
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION COLCHON RENO 0.3 X 2.0 X 4.
LLENADO CON PIEDRAS GAVION COLCHON RENO 0.3 X 2.0 X 4.0
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION CAJON 5.0 X 1.0 X 1.0
LLENADO CON PIEDRAS GAVION CAJA 5.0 X 1.0 X 1.0
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION CAJON 5.0 X 1.5 X 1.0
LLENADO CON PIEDRAS GAVION CAJA 5.0 X 1.5 X 1.0
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION CAJON 5.0 X 0.5 X 1.0
LLENADO CON PIEDRAS GAVION CAJA 5.0 X 0.5 X 1.0
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION COLCHON RENO 0.3 X 2.0 X 5.
LLENADO CON PIEDRAS GAVION COLCHON RENO 0.3 X 2.0 X 5.0
REFORESTACION DE TERRAPLENES
REFORESTACION EN TALUDES DE ACCESO

Project: cronograma malanoche


Date: jue 28/05/15

Comienzo

10 das mar 04/08/15


4 das
lun 10/08/15
4 das
lun 10/08/15
3 das dom 02/08/15
5 das dom 02/08/15
2 das
lun 31/08/15
3 das mi 02/09/15
2 das sb 05/09/15
2 das
lun 07/09/15
1 da mi 09/09/15
1 da
jue 10/09/15
1 da sb 29/08/15
1 da dom 30/08/15
6 das dom 13/09/15
6 das dom 13/09/15

Fin
vie 14/08/15
vie 14/08/15
vie 14/08/15
mi 05/08/15
vie 07/08/15
mi 02/09/15
sb 05/09/15
lun 07/09/15
mi 09/09/15
jue 10/09/15
vie 11/09/15
dom 30/08/15
lun 31/08/15
sb 19/09/15
sb 19/09/15

24/05

junio
31/05

07/06

14/06

21/06

julio
28/06

05/07

12/07

19/07

26/07

agosto
02/08

Task

Project Summary

Tarea inactiva

Slo duracin

Slo fin

Split

External Tasks

Hito inactivo

Informe de resumen manual

Progress

Milestone

External Milestone

Resumen inactivo

Resumen manual

Deadline

Summary

Tarea inactiva

Tarea manual

Slo el comienzo

Page 2

09/08

16/08

23/08

septiembre
30/08 06/09

13/09

20/09

CONTRACT:
W91278-13-D-0012
Task Order 0005

DESIGN / BUILD
FIVE BRIDGES UPPER HUALLAGA VALLEY
LEONCIO PRADO, PERU

PROJECT SCHEDULE
MALA NOCHE BRIDGE

Id
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Texto1

Task Name

Duracin

Comienzo
24/05

01 PUENTE MALANOCHE
01.01
DEMOLICION DE ESTRUCTURAS EXISTENTES
01.01.01
DEMOLICION DE CONCRETO SIMPLE
01.01.02
ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 M )
01.01.03
DESMONTAJE PUENTE MADERA ROLLIZA
01.02
TRABAJOS EN EL SITIO
01.02.01
ALMACEN Y GUARDIANIA
01.02.02
TRAZO Y REPLANTEO
01.02.03
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
01.02.04
ENERGIA ELECTRICA TEMPORAL
01.03
ACCESOS DE PUENTE
01.03.01
MOVIMIENTO DE TIERRAS
01.03.01.01
EXCAVACION CON EQUIPO EN ACCESOS
01.03.01.02
CONFORMACION DE TERRAPLENES EN ACCESOS, CAPAS DE E=0.20 m.
01.03.02
CUNETAS DE DRENAJE PLUVIAL
01.03.02.01
PERFILADO DE CUNETAS C/MAQ.
01.03.02.02
CONCRETO F'C=210 KG/CM2 EN CUNETAS
01.03.02.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN CUNETAS
01.03.02.04
ENCOFRADO Y DESENCOFRADO EN CUNETAS
01.03.02.05
JUNTA DE DILATACION EN CUNETAS
01.03.03
LOSA DE APROXIMACION
01.03.03.01
PERFILADO PARA LOSA DE APROXIMACION
01.03.03.02
CONCRETO F'C=210 KG/CM2 EN LOSA DE APROXIMACION
01.03.03.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN LOSA DE APROXIMACION
01.03.03.04
ENCOFRADO Y DESENCOFRADO EN LOSA DE APROXIMACIN
01.03.03.05
JUNTA DE DILATACIN EN LOSA DE APROXIMACIN/ESTRIBO
01.04
ACCESOS PROVISIONAL
01.04.01
MEJORAMIENTO ACCESO PROVISIONAL
01.05
SUB ESTRUCTURA
01.05.01
MOVIMIENTO DE TIERRAS
01.05.01.01
EXCAVACION DE TIERRA BAJO AGUA C/MAQ.
01.05.01.02
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN ESTRIBOS
01.05.01.03
RELLENO CON MATERIAL PROPIO SELECCIONADO EN ESTRIBOS
01.05.01.04
CAMA DE ARENA CON MATERIAL GRANULAR
01.05.02
OBRAS DE CONCRETO SIMPLE
01.05.02.01
SOLADO DE CONCRETO DE 4"
01.05.02.02
CONCRETO F'C=210 KG/CM2 EN ESTRIBOS + 30% P.G.
01.05.02.03
ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS
01.05.03
DRENAJE
01.05.03.01
TUBERIA PVC CLASE 10, 3"
01.06
SUPERESTRUCTURA
01.06.01
OBRAS DE CONCRETO ARMADO
01.06.01.01
CONCRETO ARMADO F'C=280 KG/CM2 EN SUPERESTRUCTURA
01.06.01.02
ENCOFRADO Y DESENCOFRADO CARAVISTA EN SUPERESTRUCTURA
01.06.01.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN SUPERESTRUCTURA
01.06.01.04
FALSO PUENTE
01.06.02
JUNTAS
01.06.02.01
JUNTA DE DILATACIN APOYO FIJO
01.06.02.02
JUNTA DE DILATACIN APOYO MVIL
01.06.02.03
NEOPRENE SHORE DE (0.45 X 0.30 X 0.05)
01.06.03
BARANDAS
01.06.03.01
BARANDAS METALICAS INC. ARENADO, TRANSPORTE, PINTURA E INSTALACIN
01.06.04
DRENAJE
01.06.04.01
TUBERIA PVC CLASE 10, 3"
01.06.05
PAVIMENTOS
01.06.05.01
CARPETA ASFALTICA EN FRIO DE 2"
01.07
SEALIZACION
01.07.01
SEALES INFORMATIVAS SEGUN DISEO INC. SUMINISTRO Y COLOC.
01.08
PROTECCION DE MARGENES CON GAVIONES
01.08.01
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN GAVIONES

Project: cronograma malanoche


Date: jue 28/05/15

junio
31/05

07/06

14/06

21/06

julio
28/06

05/07

12/07

19/07

26/07

agosto
02/08

90 das
jue 11/06/15
4 das
vie 12/06/15
3 das
vie 12/06/15
3 das sb 13/06/15
1 da dom 14/06/15
5 das
jue 11/06/15
2 das
jue 11/06/15
2 das sb 13/06/15
1 da
lun 15/06/15
1 da sb 13/06/15
38 das
lun 13/07/15
24 das
lun 13/07/15
4 das
lun 13/07/15
20 das
vie 17/07/15
14 das
jue 06/08/15
1 da
jue 06/08/15
4 das sb 15/08/15
4 das
vie 07/08/15
4 das mar 11/08/15
1 da mi 19/08/15
8 das
jue 06/08/15
1 da
jue 06/08/15
2 das mar 11/08/15
2 das
vie 07/08/15
2 das dom 09/08/15
1 da
jue 13/08/15
3 das mar 16/06/15
3 das mar 16/06/15
30 das
vie 19/06/15
23 das
vie 19/06/15
3 das dom 21/06/15
2 das
vie 19/06/15
3 das
jue 09/07/15
2 das mi 24/06/15
23 das
vie 26/06/15
1 da
vie 26/06/15
18 das
lun 29/06/15
22 das sb 27/06/15
1 da sb 27/06/15
1 da sb 27/06/15
28 das
jue 06/08/15
27 das
jue 06/08/15
4 das sb 29/08/15
10 das
vie 14/08/15
6 das dom 23/08/15
6 das
jue 06/08/15
15 das
vie 14/08/15
1 da
vie 28/08/15
1 da
vie 28/08/15
1 da
vie 14/08/15
10 das mi 19/08/15
10 das mi 19/08/15
1 da
vie 14/08/15
1 da
vie 14/08/15
1 da mi 02/09/15
1 da mi 02/09/15
1 da
jue 03/09/15
1 da
jue 03/09/15
46 das dom 12/07/15
3 das dom 12/07/15

Task

Project Summary

Tarea inactiva

Slo duracin

Slo fin

Split

External Tasks

Hito inactivo

Informe de resumen manual

Progress

Milestone

External Milestone

Resumen inactivo

Resumen manual

Deadline

Summary

Tarea inactiva

Tarea manual

Slo el comienzo

Page 1

09/08

16/08

23/08

septiembre
30/08
06/09

13/09

Id
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

Texto1
01.08.02
01.08.03
01.08.04
01.08.05
01.08.06
01.08.07
01.08.08
01.08.09
01.08.10
01.08.11
01.08.12
01.08.13
01.08.14
01.09
01.09.01

Task Name

Duracin

SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 1.0x1.0x4.0


SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 0.5x1.0x4.0
SUMINISTRO E INSTALACIN GEOTEXTIL MACTEX N40.1
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION COLCHON RENO 0.3 X 2.0 X 4.0
LLENADO CON PIEDRAS GAVION COLCHON RENO 0.3 X 2.0 X 4.0
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION CAJON 5.0 X 1.0 X 1.0
LLENADO CON PIEDRAS GAVION CAJA 5.0 X 1.0 X 1.0
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION CAJON 5.0 X 1.5 X 1.0
LLENADO CON PIEDRAS GAVION CAJA 5.0 X 1.5 X 1.0
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION CAJON 5.0 X 0.5 X 1.0
LLENADO CON PIEDRAS GAVION CAJA 5.0 X 0.5 X 1.0
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION COLCHON RENO 0.3 X 2.0 X 5.0
LLENADO CON PIEDRAS GAVION COLCHON RENO 0.3 X 2.0 X 5.0
REFORESTACION DE TERRAPLENES
REFORESTACION EN TALUDES DE ACCESO

Project: cronograma malanoche


Date: jue 28/05/15

10 das
4 das
4 das
3 das
5 das
2 das
3 das
2 das
2 das
1 da
1 da
1 da
1 da
6 das
6 das

Comienzo
24/05

mi 15/07/15
mar 21/07/15
mar 21/07/15
lun 13/07/15
lun 13/07/15
dom 16/08/15
mar 18/08/15
vie 21/08/15
dom 23/08/15
mar 25/08/15
mi 26/08/15
vie 14/08/15
sb 15/08/15
jue 03/09/15
jue 03/09/15

junio
31/05

07/06

14/06

21/06

julio
28/06

05/07

12/07

19/07

26/07

agosto
02/08

Task

Project Summary

Tarea inactiva

Slo duracin

Slo fin

Split

External Tasks

Hito inactivo

Informe de resumen manual

Progress

Milestone

External Milestone

Resumen inactivo

Resumen manual

Deadline

Summary

Tarea inactiva

Tarea manual

Slo el comienzo

Page 2

09/08

16/08

23/08

septiembre
30/08
06/09

13/09

CONTRACT:
W91278-13-D-0012
Task Order 0005

DESIGN / BUILD
FIVE BRIDGES UPPER HUALLAGA VALLEY
LEONCIO PRADO, PERU

PROJECT SCHEDULE
SALTEADOR BRIDGE

Id
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Texto1

Task Name

Duracin

01 PUENTE SALTEADOR
01.01
DEMOLICION DE ESTRUCTURAS EXISTENTES
01.01.01
DEMOLICION DE CONCRETO SIMPLE
01.01.02
ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 M )
01.01.03
DESMONTAJE PUENTE MADERA ROLLIZA
01.02
TRABAJOS EN EL SITIO
01.02.01
ALMACEN Y GUARDIANIA
01.02.02
TRAZO Y REPLANTEO
01.02.03
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
01.02.04
ENERGIA ELECTRICA TEMPORAL
01.03
ACCESOS DE PUENTE
01.03.01
MOVIMIENTO DE TIERRAS
01.03.01.01
EXCAVACION CON EQUIPO EN ACCESOS
01.03.01.02
CONFORMACION DE TERRAPLENES EN ACCESOS, CAPAS DE E=0.20 m.
01.03.02
CUNETAS DE DRENAJE PLUVIAL
01.03.02.01
PERFILADO DE CUNETAS C/MAQ.
01.03.02.02
CONCRETO F'C=210 KG/CM2 EN CUNETAS
01.03.02.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN CUNETAS
01.03.02.04
ENCOFRADO Y DESENCOFRADO EN CUNETAS
01.03.02.05
JUNTA DE DILATACION EN CUNETAS
01.03.03
LOSA DE APROXIMACION
01.03.03.01
PERFILADO PARA LOSA DE APROXIMACION
01.03.03.02
CONCRETO F'C=210 KG/CM2 EN LOSA DE APROXIMACION
01.03.03.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN LOSA DE APROXIMACION
01.03.03.04
ENCOFRADO Y DESENCOFRADO EN LOSA DE APROXIMACIN
01.03.03.05
JUNTA DE DILATACIN EN LOSA DE APROXIMACIN/ESTRIBO
01.04
ACCESOS PROVISIONAL
01.04.01
MEJORAMIENTO ACCESO PROVISIONAL
01.05
SUB ESTRUCTURA
01.05.01
MOVIMIENTO DE TIERRAS
01.05.01.01
EXCAVACION DE TIERRA BAJO AGUA C/MAQ.
01.05.01.02
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN ESTRIBOS
01.05.01.03
RELLENO CON MATERIAL PROPIO SELECCIONADO EN ESTRIBOS
01.05.01.04
CAMA DE ARENA CON MATERIAL GRANULAR
01.05.02
OBRAS DE CONCRETO SIMPLE
01.05.02.01
SOLADO DE CONCRETO DE 4"
01.05.02.02
CONCRETO F'C=210 KG/CM2 EN ESTRIBOS + 30% P.G.
01.05.02.03
ENCOFRADO Y DESENCOFRADO CARAVISTA EN ESTRIBOS
01.05.03
DRENAJE
01.05.03.01
TUBERIA PVC CLASE 10, 3"
01.06
SUPERESTRUCTURA
01.06.01
OBRAS DE CONCRETO ARMADO
01.06.01.01
CONCRETO ARMADO F'C=280 KG/CM2 EN SUPERESTRUCTURA
01.06.01.02
ENCOFRADO Y DESENCOFRADO CARAVISTA EN SUPERESTRUCTURA
01.06.01.03
ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60 EN SUPERESTRUCTURA
01.06.01.04
FALSO PUENTE
01.06.02
JUNTAS
01.06.02.01
JUNTA DE DILATACIN APOYO FIJO
01.06.02.02
JUNTA DE DILATACIN APOYO MVIL
01.06.02.03
NEOPRENE SHORE DE (0.45 X 0.30 X 0.05)
01.06.03
BARANDAS
01.06.03.01
BARANDAS METALICAS INC. ARENADO, TRANSPORTE, PINTURA E INSTALACIN
01.06.04
DRENAJE
01.06.04.01
TUBERIA PVC CLASE 10, 3"
01.06.05
PAVIMENTOS
01.06.05.01
CARPETA ASFALTICA EN FRIO DE 2"
01.07
SEALIZACION
01.07.01
SEALES INFORMATIVAS SEGUN DISEO INC. SUMINISTRO Y COLOC.
01.08
PROTECCION DE MARGENES CON GAVIONES
01.08.01
EXCAVACION DE TIERRA EN TERRENO ARCILLOSO C/MAQ. EN GAVIONES

Project: cronograma malanoche


Date: jue 28/05/15

82 das
4 das
3 das
3 das
1 da
5 das
2 das
2 das
1 da
1 da
36 das
22 das
4 das
18 das
14 das
1 da
4 das
4 das
4 das
1 da
8 das
1 da
2 das
2 das
2 das
1 da
3 das
3 das
29 das
22 das
2 das
2 das
3 das
2 das
23 das
1 da
18 das
22 das
1 da
1 da
23 das
22 das
4 das
8 das
5 das
4 das
12 das
1 da
1 da
1 da
10 das
10 das
1 da
1 da
1 da
1 da
1 da
1 da
13 das
3 das

Comienzo

junio
julio
agosto
septiembre
octubre
noviembre
diciembre
24/05 31/05 07/06 14/06 21/06 28/06 05/07 12/07 19/07 26/07 02/08 09/08 16/08 23/08 30/08 06/09 13/09 20/09 27/09 04/10 11/10 18/10 25/10 01/11 08/11 15/11 22/11 29/11 06/12 13/12 2

sb 19/09/15
dom 20/09/15
dom 20/09/15
lun 21/09/15
mar 22/09/15
sb 19/09/15
sb 19/09/15
lun 21/09/15
mi 23/09/15
lun 21/09/15
mar 20/10/15
mar 20/10/15
mar 20/10/15
sb 24/10/15
mi 11/11/15
mi 11/11/15
vie 20/11/15
jue 12/11/15
lun 16/11/15
mar 24/11/15
mi 11/11/15
mi 11/11/15
lun 16/11/15
jue 12/11/15
sb 14/11/15
mi 18/11/15
jue 24/09/15
jue 24/09/15
dom 27/09/15
dom 27/09/15
mar 29/09/15
dom 27/09/15
vie 16/10/15
jue 01/10/15
sb 03/10/15
sb 03/10/15
mar 06/10/15
dom 04/10/15
dom 04/10/15
dom 04/10/15
mi 11/11/15
mi 11/11/15
dom 29/11/15
mar 17/11/15
mar 24/11/15
mi 11/11/15
mar 17/11/15
sb 28/11/15
sb 28/11/15
mar 17/11/15
jue 19/11/15
jue 19/11/15
mar 17/11/15
mar 17/11/15
jue 03/12/15
jue 03/12/15
vie 04/12/15
vie 04/12/15
lun 19/10/15
lun 19/10/15

Task

Project Summary

Tarea inactiva

Slo duracin

Slo fin

Split

External Tasks

Hito inactivo

Informe de resumen manual

Progress

Milestone

External Milestone

Resumen inactivo

Resumen manual

Deadline

Summary

Tarea inactiva

Tarea manual

Slo el comienzo

Page 1

Id
61
62
63
64
65
66
67

Texto1
01.08.02
01.08.03
01.08.04
01.08.05
01.08.06
01.09
01.09.01

Task Name

Duracin

SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 1.0x1.0x4.0


SUMINISTRO, ARMADO Y LLENADO ELEMENTO TERRAMESH 0.5x1.0x4.0
SUMINISTRO E INSTALACIN GEOTEXTIL MACTEX N40.1
SUMINISTRO, ARMADO, COLOCACIN Y CIERRE GAVION COLCHON RENO 0.3 X 2.0 X 4.
LLENADO CON PIEDRAS GAVION COLCHON RENO 0.3 X 2.0 X 4.0
REFORESTACION DE TERRAPLENES
REFORESTACION EN TALUDES DE ACCESO

Project: cronograma malanoche


Date: jue 28/05/15

10 das
4 das
4 das
3 das
5 das
6 das
6 das

Comienzo
jue 22/10/15
mi 28/10/15
mi 28/10/15
mar 20/10/15
mar 20/10/15
vie 04/12/15
vie 04/12/15

junio
julio
agosto
septiembre
octubre
noviembre
diciembre
24/05 31/05 07/06 14/06 21/06 28/06 05/07 12/07 19/07 26/07 02/08 09/08 16/08 23/08 30/08 06/09 13/09 20/09 27/09 04/10 11/10 18/10 25/10 01/11 08/11 15/11 22/11 29/11 06/12 13/12 2

Task

Project Summary

Tarea inactiva

Slo duracin

Slo fin

Split

External Tasks

Hito inactivo

Informe de resumen manual

Progress

Milestone

External Milestone

Resumen inactivo

Resumen manual

Deadline

Summary

Tarea inactiva

Tarea manual

Slo el comienzo

Page 2

You might also like