Gulf Engineering & Industrial Consultancy
Gulf Engineering & Industrial Consultancy
Gulf Engineering & Industrial Consultancy
Page 1
18
OTHER CONTRACTORS.............................................................................. 2
18.1
GENERAL ...................................................................................................... 2
18.1.1 Scope
18.2
nc
18.3
ul
f
En
gi
ne
er
in
&
In
du
st
ria
lC
on
su
18.4
lta
QCS 2014
Page 2
OTHER CONTRACTORS
18.1
GENERAL
18.1.1
Scope
This Part specifies the requirements for access to the Site for other contractors, for
co-operation and co-ordination with other contractors and for the provision of facilities with
other contractors.
18.2
18.2.1
Unhindered Access
The Contractor shall allow other contractors unhindered access to any part of the Works
when in the opinion of the Engineer those parts are sufficiently completed.
18.3
18.3.1
The Contractor shall carry out his work in a manner that causes the minimum amount of
interference to other contractors working on the Site.
The Contractor shall co-ordinate his operations with the activities of other contractors where
necessary in order to avoid conflicts and ensure orderly progress of the Works.
Those works associated with existing or future service installation shall only be carried out by
a contractor or sub-contractor approved by the public utility authority concerned. The
Engineer shall require proof of such approval in writing prior to the commencement of works.
18.4
18.4.1
If specified in the Contract, the Contractor shall provide site facilities for other contractors.