0% found this document useful (0 votes)
47 views5 pages

RO-1 Plant LOG Sheet Date: 06.03.2016 Shift: Morning Product: Feed in Permeate Reject

This document contains log sheets from two reverse osmosis plants (RO-1 and RO-2) recording various water quality parameters over a 24 hour period. For RO-1, parameters such as feed volume, TDS, pH, hardness and alkalinity are recorded for the feed, permeate, and reject streams hourly. RO-2's log sheet similarly records parameters like permeate volume, TDS, pH, hardness and alkalinity for its permeate and reject streams hourly. Both log sheets track how the recorded parameters fluctuate over the course of the day.

Uploaded by

Donesh Varshney
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views5 pages

RO-1 Plant LOG Sheet Date: 06.03.2016 Shift: Morning Product: Feed in Permeate Reject

This document contains log sheets from two reverse osmosis plants (RO-1 and RO-2) recording various water quality parameters over a 24 hour period. For RO-1, parameters such as feed volume, TDS, pH, hardness and alkalinity are recorded for the feed, permeate, and reject streams hourly. RO-2's log sheet similarly records parameters like permeate volume, TDS, pH, hardness and alkalinity for its permeate and reject streams hourly. Both log sheets track how the recorded parameters fluctuate over the course of the day.

Uploaded by

Donesh Varshney
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Date:

Product:

RO-1 plant LOG Sheet


Shift:

06.03.2016
Feed in

Time
Feed Volume
TDS
m3/hr

pH

Hardness Alkalinity

Chlorides

Morning
Permeate

Silica HPP Pressure

Permeate
m3/hr

TDS

pH

Reject

Hardness Alkalinity Chlorides Silica Pressure

Reject
m3/hr

TDS

pH Hardness Alkalinity Chlorides Silica

Pressure

12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM

75

2:00 PM

75

2440
2430

7.4
7.2

15
15

60
60

55
56

5.6
5.6

14.5
14.5

15 13178
15 13118.6

12
12

75

2380

7.2

14

60

53

5.6

13.5

15 12856.8

12

3:00 PM
4:00 PM
5:00 PM
6:00 PM

Date:
Product:

06.03.2016
Feed in

Time
Feed
Volume
m3/hr

TDS

pH

Hardness Alkalinity Chlorides

12:00 AM
1:00 AM
2:00 AM
3:00 AM
4:00 AM
5:00 AM
6:00 AM
7:00 AM
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
21

13566
13135

7.1
7.4

21

13135

7.5

1:00 PM

21.5

2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
9:00 PM
10:00 PM
11:00 PM
12:00 AM

Silica

RO-2 plant LOG Sheet


Shift:
Permeate
Permeate
HPP Pressure
m3/hr

TDS

pH

Hardness Alkalinity Chlorides

26
30

16
10.2

179
128

5.8
5.8

31

10.2

128

5.8

Silica

Morning
Reject
Pressure

Reject
m3/hr

TDS

25.5
29.5

6 40264.67
5.8 44285.24

31

5.8 44285.24

pH

Hardness Alkalinity Chlorides

Silica

Pressure Final TDS after Degassing

25.5
29.5

62
62

31

64

You might also like