0% found this document useful (0 votes)
89 views6 pages

Filming Schedule

The document provides a filming schedule for the production "X.L.R.8" taking place from November 11-13, 2016 in London. It includes contact information for the cast and crew, a list of contributors and equipment being used. The schedule details the filming plans for each day, including locations, shots being captured, and times for travel, filming, and breaks. It also includes safety information and weather forecasts for the filming days.

Uploaded by

api-308808499
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views6 pages

Filming Schedule

The document provides a filming schedule for the production "X.L.R.8" taking place from November 11-13, 2016 in London. It includes contact information for the cast and crew, a list of contributors and equipment being used. The schedule details the filming plans for each day, including locations, shots being captured, and times for travel, filming, and breaks. It also includes safety information and weather forecasts for the filming days.

Uploaded by

api-308808499
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

FILMING SCHEDULE

[Name of film production:X.L.R.8]


[Filming dates:11/02/16-13/02/16]
Filming locations: [.5 naiby house Hotspur street.] and
[Auckland St, Lambeth, London SE11 5HT]

Production Contact Numbers


Every member of the cast and crew has been given access to the mobile numbers
of the other members, these numbers will be used in situations where there
locations are not known and they need to be found. It also allows anyone in the
group to call in to inform the other production members if they cant make it to the
location on time or at all.

Contributors
Contributor 1: St Michaels Catholic College
Contributor 2: (MacLeans sister)
Camera supplier: St Michaels Catholic College
Props supplier: Manuel Freitas/ Pablo Guembe-Young/ Maclean Sem/ Chelsea Higgins
[numbers
are above]
Actors
Husband: Maclean Sem
Merc(gangster with red shoes): Pablo Guembe-Young
Wife: Sade
The idea is for all of us to have all the numbers you could possibly need while on
location so that the schedule is like a bible in case anything goes wrong.

Technical Requirements and Equipment


Shooting format and sound requirements should be detailed here.
List of equipment:
-Camera: Cannon Powershot SX520HS
-tripod
-monopod
-Phantom 3 Drone

IMPORTANT INFORMATION
Anything that May bee needed: Warm & waterproof clothing necessary for days
where it could rain ( the specific days where this could happen will be mentioned at
a later stage of this schedule), Oyster Cards, Money for lunch or lunch box., Diary of
events book to note the vents that happened during filming.

Props with the day that theyll be used on

Syringe (both days)

Powerade energy drink for XLR8 substance (Both days)


Dissarano Alcohol (Saturday)
BB gun (both days)
Multiple toys e.g. toy trucks (Saturday)
Yellow alien Toy (Saturday)
Red food colouring gel (Saturday)
Doctors letter (Saturday)

Health and Safety


police telephone:999 (ask for police)
hospital A&E telephone:999 (ask for ambulance)
A first aid kit should be taken with us in case of minor injury.
A full risk assessment has been completed separately, it has been thought through
in relation to all aspects of filming from travel to and from location, specific set ups
planned, use of equipment, working alone etc.

Weather Forecast
This was planned as it can be very useful for when we work in exterior areas and so
everyone involved can plan clothing and prep appropriately.
London

Day

Thursday
weather
11/02/2016

Saturday
weather
13/02/2016

Weather

PartlyCloudyfor
17;00(moderately
affectslighting)

Showersforwhole
day(couldaffect
naturallighting
heavily)

Temperature
(C)

WindDirectionand
Speed
(mph)

Precipitation/Humidity

10mph(willmildly
affectsound)

18%/62%
(shouldbenotedsothat
thecameraisnt
damagedbyanyof
them)

13mph(willnot
affectsounddueto
filmingbeingindoors)

50%/73%
(shouldbenotedsothat
thecameraisnt
damagedbyanyof
them)

Daily filming schedule- This schedule was made, printed and distributed to everyone
on set to leave anyone reading it in no doubt of what is happening when.

Thursday 11th February


London
15:30

2016

TRAVEL & FILM -

DEPART college and travel to alleyway location

16:10 RV (rendezvous)

location 1: 49-51 Black Prince Rd


Lambeth London
SE11 6AB

Directions & From Michaels Catholic college to set:

16:15 BREIF

Brief the cast and crew about what will be filmed and also show them the risk
assessment and troubleshooting.
16:20 Ensure the set is clear of any unwanted objects such as plastic bags,
chocolate wrappers etc.
16:30 FILM Film shots 2-6.
(Take pictures of filming process during the filming process)
17:00 FILM Film the Establishing shot of London using the Phantom 3 Drone (shot
1).
17:05-17:30

BREAK

17:30 FILM Film shots 7-14. Then check that all the shots taken during the entire
look how they are meant to and retake any shots that are not to the necessary
standard.
18:00 WRAP
Put equipment in its allocated storage bag and travel back home.
For me Pablo Guembe-Young (5 Hinckley road SE15 4HZ)

Directions to get home:

1843

Arrive back home.

Saturday 11th February


London

2016

TRAVEL & FILM -

We have talked and checked with the Contributor 2 (Maclean Sems sister) to ensure
whether we had permission to film in this location at the time specified.

10:00
DEPART Home (5 Hinckley road SE15 4HZ).
Travel to house location
1040 RV

Contributor 2s home, location 2:


Auckland St,
Lambeth, London
SE11 5HT

10:45 FILM Film some interior demo shots too see how the natural light from the
window will affect the lighting of the shot. The edit the set so that the lighting is as
we want (low key lighting)
1150 FILM Place the necessary props in the correct places around the set, then
ensure they will all be in shot using further demo shots
FILM Film shots 15-25.
12:30-13:00

LUNCH BREAK

13:00 FILM Film shots 26- END


13:45 WRAP
Put equipment in its allocated storage bag, then check that all
shots are as planned . Retake shots that have errors. Travel back home. For me
Pablo Guembe-Young (5 Hinckley road SE15 4HZ).

14:30

Arrive back home.

You might also like