Becl Bhavnagar 2 250 MW LTPP: S.No. Description Valve No. LP Flash Tank

This document lists valve numbers for drain lines from various components in the low pressure flash tank and high pressure flash tank of a 2x250 MW LTP power plant. In the low pressure flash tank section, it lists 10 drain lines from components like the LPT to LPH exhaust lines and the IPT to DEA exhaust line. In the high pressure flash tank section, it lists 11 drain lines from components like the LPBP, HRH, CRH, IPT and GS lines. It also lists the status of the GAR 2x250 MW LTPP project as pending for welding of some drain line joints.

Uploaded by

saravan1891
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views2 pages

Becl Bhavnagar 2 250 MW LTPP: S.No. Description Valve No. LP Flash Tank

This document lists valve numbers for drain lines from various components in the low pressure flash tank and high pressure flash tank of a 2x250 MW LTP power plant. In the low pressure flash tank section, it lists 10 drain lines from components like the LPT to LPH exhaust lines and the IPT to DEA exhaust line. In the high pressure flash tank section, it lists 11 drain lines from components like the LPBP, HRH, CRH, IPT and GS lines. It also lists the status of the GAR 2x250 MW LTPP project as pending for welding of some drain line joints.

Uploaded by

saravan1891
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

BECL BHAVNAGAR 2*250 MW LTP

S.NO. DESCRIPTION

VALVE NO.

LP FLASH TANK
1 LPT TO LPH 1 EX. LINE DRAIN
2 LPT TO LPH 2 EX. LINE DRAIN (BEFORE QCNRV)
3 LPT TO LPH 2 EX. LINE DRAIN (AFTER QCNRV)
4 LPT TO LPH 2 EX. LINE DRAIN (AFTER QCNRV)
5 LPT TO LPH 3 EX. LINE DRAIN (BEFORE QCNRV)
6 LPT TO LPH 3 EX. LINE DRAIN (AFTER QCNRV)
7 LPT TO LPH 3 EX. LINE DRAIN (AFTER QCNRV)
8 IPT TO DEA EX. LINE DRAIN (BEFORE QCNRV)
9 IPT TO DEA EX. LINE DRAIN (AFTER QCNRV)
10 HT APRDS TO GS LINE LINE DRAIN

EX.128
EX.124
EX.123
EX.119
EX.125
EX.122
EX.126
EX.113
EX.107
AS.222

HP FLASH TANK
1 LPBP LINE DRAINS
2 LPBP WARMUP DRAINS
3 HRH STRNR DRAINS
4 CRH NRV AND LINE DRAINS
5 IPT TO HPH 5 EX. LINE DRAIN (BEFORE QCNRV)
6 IPT TO HPH 5 EX. LINE DRAIN (AFTER QCNRV)
7 IPT TO HPH 5 EX. LINE DRAIN (AFTER QCNRV)
8 CRH TO HPH 6 LINE DRAIN
9 CRH TO DEA LINE DRAIN
10 CRH TO GS LINE DRAIN
11 GS HDR DRAIN

HRH.109, 110
HRH.103, 104
HRH.101, 102
CRH 101
EX.105
EX.103
EX.101
EX.121
CRH.110
CRH.122
CRH.105

LPH-3 EX. I/L LINE


LPH-1 TO DRAIN COOLER LINE
HPH-5 I/L AND O/L
HPH-6 I/L AND O/L LINE

GAR 2*250 MW LTPP


STATUS

START DATE END DATE REMARKS

completed
completed
completed
completed
completed
completed
completed
completed
completed
completed

PENDING
PENDING
PENDING
PENDING
PENDING
PENDING
PENDING

only welding
only welding
only welding
only welding
only welding
only welding
only welding
completed
completed
completed
completed

joint
joint
joint
joint
joint
joint
joint

pending
pending
pending
pending
pending
pending
pending

PENDING
PENDING
PENDING
PENDING

only
only
only
only

joint
joint
joint
joint

pending
pending
pending
pending

welding
welding
welding
welding