ATP Robustness
ATP Robustness
<LIVELLO SICUREZZA>
Doc N.
XXXX.
Iss.
DRAFT.
PROGRAM:
CDRL No. :
Program No. :
Contract Identification Code :
ISSUED BY :
SELEX Sistemi Integrati
Via Tiburtina km 12,4 - Roma
ITALY
The total number of pages, included the eventual Appendixes and Annexes, is .. pages.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 1
<SECURITY RATING>
<LIVELLO SICUREZZA>
Doc N.
XXXX.
Iss.
DRAFT.
SECURITY CLASSIFICATION
The following are the military classification levels for the documents from lowest to highest.
UNCLASSIFIED
NC
RISERVATO
RESTRICTED
RISERVATISSIMO
CONFIDENTIAL
RR
SEGRETO
SECRET
SEGRETISSIMO
TOP SECRET
SS
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 2
<SECURITY RATING>
<LIVELLO SICUREZZA>
Doc N.
Iss.
Validation
Prepared by :
<Function>
Verified/Approved by:
<Function>
Approved by:
<Function>
Checked by:
<Function>
Authorized by:
<Function>
312240262.doc
Mod.
..........................................................
(Name Surname)
..........................................................
(Name Surname)
..........................................................
(Name Surname)
..........................................................
(Name Surname)
..........................................................
(Name Surname)
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 3
<SECURITY RATING>
<LIVELLO SICUREZZA>
Doc N.
Iss.
Date
Rev. A
Rev. B
20/02/02
13/05/02
Rev. C
24/05/02
Rev. D
16/09/02
Rev. E
10/04/03
Rev. F
Rev. G
31/05/04
05/10/04
07/07/10
312240262.doc
Mod.
Revised Paragraphs
Document
Change Note
All
TST_Robustness_7, TST_Robustness_8,
TST_Robustness_12, TST_Robustness_26,
TST_Robustness_27 TST_Robustness_13,
TST_Robustness_16, TST_Robustness_18,
TST_Robustness_19, TST_Robustness_20,
TST_MRT_10, TST_MRT_11, TST_MRT_14,
TST_MRT_17, TST_REC_1, TST_REC_3,
TST_PLB_1, TST_BCK_2, TST_CMS_6,
TST_CWP_1, TST_CWP_7, TST_CWP_8
-TST_Robustness_9, Dropped
-TST_Robustness_27, Moved in MRT Accuracy and
Capability Tests
-TST_MRT_5, updated and re-inserted,
-TST_MRT 10, 11,14, 15, 16, 17, 18,19, 21, 22, 23,
Moved into MRT Accuracy and Capability Tests
-Performed general editorial improvement
TST_Robustness_2, TST_REC _2, TST_PLB _5,
TST_BCK _4, TST_BCK _5, TST_CWP _7,
TST_CWP _4
Removed TST_TCA_1, TST_TCA_2, TST_TCA_3;
TST_PLB_1
TST_Robustness_13, TST_Robustness_17
TST_Robustness_1, 2, 3, 4, 7, 11, 12, 14, 15, 16, 17,
18, 23 TST_MRT_1, TST_CWP _4
All pages revised and doc updated to last Selex
template. AGW>RFB switch test added
<SECURITY RATING>
<LIVELLO SICUREZZA>
First Issue
E04067
E040105
Page 4
<SECURITY RATING>
<LIVELLO SICUREZZA>
Doc N.
Iss.
ABBREVIATIONS LIST
CODE
DESCRIPTION
ACC
ACD
ACK
Acknowledge
ACL
Arrival CLearance
ACR
AFTN
AIS
ALV
Authorization LeVel
APP
APProach control
ARR
ARRival
ASF
Assistant function
ASQ
Arrival SeQuencing
ASS
Assistant Controller
ATA
ATC
ATD
ATI
ATM
ATO
ATS
ATW
BRW
BroWse
CNL
CaNceL
CoMap
CSCI
CWP
DAIW
DARD
DCL
Departure CLearance
DCR
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 5
<SECURITY RATING>
<LIVELLO SICUREZZA>
CODE
Doc N.
Iss.
DESCRIPTION
DEP
DEParture list
DIS
DISabled
DLA
DeLAy departure
DMD
EMG
EmerGency
EST
ESTimate
ETA
Estimated Time of Arrival / Estimated Exit Time from the feeding fix (in ACL order)
ETD
ETI
ETL
ETO
EXE
EXEcutive function
FCK
Formality ChecK
FCN
FDM
FDP
FIR
FL
Flight Level
FLD
FLDA Displaying
FLDA
FLDI
FPLM
FTR
File TeRmination
GlobMap
I/O
Input/Output
ICAO
INBFIX
INI
INItialize
LND
LANding report
LRW
Landing RunWay
LSV
LaSt leVel
LVA
MET
METeorological
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 6
<SECURITY RATING>
<LIVELLO SICUREZZA>
CODE
Iss.
DESCRIPTION
MIL
MILitary
MNG
MaNaGement
MPG
MRT
MSAW
NAVAID
NAVigational AID
NM
Nautical Miles
NOTAM
Notice to AirMan
NVS
NaVigator aid
OBT
ODS
ONL
ON Line
OP
Operational
OPRSUP
OpeRational SUPervisor
PCN
Planning Cancellation
PEN
PENding tracks
PKB
PLB
PlayBack
PLC
Planning Controller
PLN
PlaNning function
QNH
RCL
en-Route CLearance
RCR
RDP
REC
RECording
REG
REGistration number
REP
Position REport
REV
estimate REVision
RHP
RNG
RaNGe scale
RWY
RunWaY
SBY
Stand-BY
SID
312240262.doc
Mod.
Doc N.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 7
<SECURITY RATING>
<LIVELLO SICUREZZA>
CODE
Doc N.
Iss.
DESCRIPTION
SIG
fir SIGmet
SMD
SRL
SSR
STAR
SUM
SUP
SuPerVisor
SW
SoftWare
TAS
TBD
To Be Defined
TCA
TKF
TaKe-oFf report
TMA
TerMinal Area
TMS
TRW
departure RunWay
TXT
free TeXT
TWR
control ToWeR
VDU
VFR
WTC
WaTCher
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 8
<SECURITY RATING>
<LIVELLO SICUREZZA>
Doc N.
Iss.
TABLE OF CONTENTS
1.
INTRODUCTION.................................................................................................................10
2.
GENERAL CONDITION......................................................................................................10
3.
4.
TESTS RESULTS............................................................................................................... 51
LIST OF ANNEXES
ANNEX 01 E184-02-1875ATP01TDR
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 9
<SECURITY RATING>
<LIVELLO SICUREZZA>
1.
Doc N.
Iss.
INTRODUCTION
This document contains the supplementary tests to be done at the operative site to ensure that the
performance of the part under test meets Selex Sistemi Integrati Technical Specification. The procedures
described are a comprehensive check of the part under test.
The specifications contained in this document are current at the time of publication but may be subject to
variation as a result of improvement.
The part under test will be in accordance with Selex Sistemi Integrati specifications at the time of
manufacture.
2.
GENERAL CONDITION
All tests will be performed in the normal environmental conditions of the sites as specified in the contract
during the normal indoor operations.
All required personnel will be provided by Selex Sistemi Integrati.
The test will be done by a Selex Sistemi Integrati test team and demonstrated to the Customer's
representative.
3.
Where applicable, for each test the parameters to be checked, the values to be obtained and the test
procedures are described.
4.
Not Applicable
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 10
<SECURITY RATING>
<LIVELLO SICUREZZA>
4.1
4.1.1
Doc N.
Iss.
TESTS DESCRIPTION
TESTS LIST
TEST NAME
System Robustness
TST_Robustness_1
TST_Robustness_2
TST_Robustness_3
TST_Robustness_4
TST_Robustness_5
TST_Robustness_6
TST_Robustness_7
TST_Robustness_8
TST_Robustness_9
TST_Robustness_10
TST_Robustness_11
TST_Robustness_12
TST_Robustness_13
TST_Robustness_14
TST_Robustness_15
TST_Robustness_16
TST_Robustness_17
TST_Robustness_18
TST_Robustness_19
TST_Robustness_20
TST_Robustness_21
TST_Robustness_22
TST_Robustness_23
TST_Robustness_24
TST_Robustness_25
TST_Robustness_26
TST_Robustness_27
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 11
<SECURITY RATING>
<LIVELLO SICUREZZA>
Doc N.
Iss.
Applications Functionality
TST_MRT_1
TST_MRT_2
TST_MRT_3
TST_MRT_4
TST_MRT_5
TST_MRT_6
TST_MRT_7
TST_MRT_8
TST_MRT_9
TST_MRT_10
TST_MRT_11
TST_MRT_12
TST_MRT_13
TST_MRT_14
TST_MRT_15
TST_MRT_16
TST_MRT_17
TST_MRT_18
TST_MRT_19
TST_MRT_20
TST_MRT_21
TST_MRT_22
TST_MRT_23
TST_AGW_1
TST_AGW_2
TST_AGW_3
TST_AGW_4
TST_RFE_1
TST_RFE_2
TST_RFE_3
TST_REC_1
TST_REC_2
TST_REC_3
TST_PLB_1
TST_PLB_2
TST_PLB_3
TST_PLB_4
TST_PLB_5
TST_BCK_1
TST_BCK_2
TST_BCK_3
TST_BCK_4
TST_BCK_5
TST_CMS_1
TST_CMS_2
TST_CMS_3
TST_CMS_4
TST_CMS_5
TST_CMS_6
TST_TCA_1
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 12
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_TCA_2
TST_TCA_3
TST_CWP_1
TST_CWP_2
TST_CWP_3
TST_CWP_4
TST_CWP_5
TST_CWP_6
TST_CWP_7
TST_CWP_8
TST_CWP_9
312240262.doc
Mod.
Doc N.
Iss.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 13
<SECURITY RATING>
<LIVELLO SICUREZZA>
4.2
Doc N.
Iss.
SYSTEM ROBUSTNESS
TST_Robustness_1
Purpose:
Verify the correct behaviour of the system after a Master node fail simulation.
Execution:
Result:
Note:
On the CWPs there will be no loss of Radar data. Verify on the CMS the changed status
of the nodes. Switch on the previous node and wait the alignment with the other node.
Verify the correct alignment between the two nodes. No double targets on the CWP.
STCA remain active.
TST_Robustness_2
Purpose:
Verify the correct behaviour of the system after a Slave node fail simulation.
Execution:
Switch off the Slave node. Modify some parameters. (This test is not applicable on
FDPSL and FPPS).
Result:
Note:
On the CWPs there will be no loss of Radar data. Verify on the CMS the changed status
of the nodes. Switch on the Slave node and wait the alignment with the Master node.
Verify the correct alignment data between the two nodes included those changed during
its stop. If, after the modification of the parameters into the Master Alone node, this node
is switched off, it is necessary to start-up this one as first to maintain the new
configuration; on the contrary, the last modification will be lost if the Slave node is the
one to be started-up as first. Do not change parameters during start-up phase. No double
targets on the CWP. STCA active.
TST_Robustness_3
Purpose:
Verify the correct behaviour of the system after a fail simulation of both the RDP nodes in
matched pair configuration.
Execution:
Result:
Note:
Each CWP continues to display its selected radar if it is disseminated. Verify on the CMS
the changed status of the nodes. Verify the correct alignment between the two nodes after
restarting. The test must be changed or dropped if overlaps a test in MRT fallback.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 14
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_Robustness_4
Doc N.
Iss.
Purpose:
Verify the system has the capability to start-up two nodes in configuration Master/Slave
simultaneously.
Execution:
Result:
The fastest node will start as Master Alone and when the other will reach the start-up
phase becomes Master.
Note:
Verify on the CMS the changed status of the nodes. Verify the correct alignment between
the two nodes. No double targets on the CWP. STCA active.
TST_Robustness_5
Purpose:
Verify the correct behaviour of the system after a fail simulation of the Inter-Computer
Serial Line of the two servers in Matched Pair configuration.
Execution:
Take off the cable connection from one of the two servers.
Result:
The node where the cable is disconnected goes in HALT and the other node becomes
Master Alone.
Note:
On the CWPs there will be no loss of data. Verify on the CMS the changed status of the
nodes.
TST_Robustness_6
Purpose:
Verify the correct behaviour of the system after a connection back of the cable.
Execution:
Result:
Verify that both nodes recover the Matched Pair Master/Standby functionality.
Note:
On the CWPs there will be no loss of data. Verify on the CMS the changed status of the
nodes.
Repeat the same procedures (5 and 6) to the other node.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 15
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_Robustness_7
Doc N.
Iss.
Purpose:
Verify that the failure will be managed by the system without affecting the correct
functionality of the system.
Execution:
Take off the Main LAN from one of the Master node.
Result:
There will be a misalignment of the node. If the node is the AGW (Artas Gateway), the
system will be in RFB-C mode; if the node is the RFE the system maintain its whole
functionality, if the node is either the FDP or RPB the functionality is stopped, if the node
is a CWP that is disseminating a radar, this radar will be disseminated by the next CWP
on the LAN. The system can recover its whole functionality either by manual switching
of the Main LAN or by a manual node role switching.
Note:
Verify on the CMS and CWP the changed status of the nodes. Connect back the LAN on
Master node. The functionality will be recovered. Repeat this order for each typology of
node. Verify the behavior of CAT 62,63 output.
TST_Robustness_8
Purpose:
Verify that the failure will be managed by the system without affecting the correct
functionality of the system.
Execution:
Take off the Main LAN from one of the Slave nodes. (Note: This test is not applicable to
the FPPS).
Result:
There will be a misalignment of the relevant node without any problem for the system
functionality.
Note:
Verify on the CMS the changed status of the nodes. Connect back the LAN on
Slave node. Repeat this order for each typology of node.
TST_ Robustness_9
Procedure Dropped
TST_Robustness_10
Purpose:
Verify that the failure of the Reserve LAN will be managed by the system without
affecting the correct functionality of the system.
Execution:
Take off the Reserve LAN from the Master node. (Note: This test is not applicable to the
FPPS).
Result:
Note:
Verify on the CMS the changed status of the nodes. Connect back the Reserve LAN on
Master node and check the recovered configuration on the CMS. Repeat this test taking
off the Reserve LAN on the Slave node.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 16
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_Robustness_11
Doc N.
Iss.
Purpose:
Execution:
Perform the NWS order from the I/O console of the RDP and perform the order REL
STA. ( This test is not applicable on the FPPS).
Result:
Verify that the whole system have changed to the second LAN.
Note:
Verify that there are not losses of data on the CWP. Verify on the CMS the changed status
of the LANs. Repeat these orders from the CMS. No double targets.
TST_Robustness_12
Purpose:
Change the operative LAN manually even if the Reserve LAN of best node is in fault.
Execution:
Take off the Reserve LAN cable from the Best Node Server. Perform the NWS order
from the I/O console of the same node and perform the order REL STA. (This test is not
applicable on the FPPS).
Result:
Verify that the whole System have changed to the Reserve LAN and that the best node is
now transferred to another computer. If the node is the master RDP, the system will be in
DARD mode; if the node is the master FDP or master RPB the functionality is stopped, if
the node is a CWP that is disseminating a radar, this radar will be disseminated by the
next CWP on the LAN. The system could be recovering its whole functionality: either by
manual switching of the Main LAN or by a manual node role switching. Force RFB to be
best node, and also CWP.
Note:
Verify on the CMS the changed status of the LANs. Repeat these orders from the CMS.
TST_Robustness_13
Purpose:
Verify how the system can manage a failure of the Main LAN of the Best Node.
Execution:
Take out the cable of the Main LAN of the Best Node from its switch. (This test is not
applicable on the FPPS).
Result:
Verify that in the system there is another best node and that the whole system remains
working to the Main LAN. If the node is the master RDP, the system will be in DARD
mode if the node is the master FDP or master RPB the functionality is stopped, if the
node is a CWP that is disseminating a radar, this radar will be disseminated by the next
CWP on the LAN. The system could be recovering its whole functionality: either by
manual switching of the Main LAN or by a manual node role switching.
The system does not allow the explicit assignment of OPER (OPERative environment) mode to a LAN, it switches automatically
only at a LAN switching. It is possible to assign to different LANs the REAL and PLB environments with command REL LAS from
CMS. Note that having OPER and REAL modes working on different LANs leads to the loss of LAN redundancy. In this case the
system becomes unstable, switching endlessly between MRT and DARD, and all the information on CWPs is lost.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 17
<SECURITY RATING>
<LIVELLO SICUREZZA>
Note:
Doc N.
Iss.
Verify on the CMS the changed status of the LANs. Repeat this test switching off all the
Switches of the Main LAN (all nodes off) and verify that the whole system changes to the
Reserve LAN.
TST_Robustness_14
Purpose:
Simulate a failure of the Radar Head data. Repeat the test three times.
Execution:
Set in BYP, on the chosen radar, at least one CWP. Take off both the serial cables of the
chosen radar head.
Result:
Verify that the relevant radar data dont arrive anymore and the tracks related to that radar
head disappears from all the CWPs.
Note:
Verify on the CMS the changed status of the serial line. Connect back the cable and check
that the radar data presentation is restored. No double targets.
TST_Robustness_15
Purpose:
Simulate a failure of the radar data for one of the Radar Heads. Repeat the test three
times.
Execution:
Set in BYP, on the chosen radar, at least one CWP. Take off the serial cable of the main
link of the chosen Radar Head.
Result:
Verify that the channel will change, that the data continue to arrive and the tracks related
to that radar head are present on the CWPs.
Note:
During this test perform some commands towards the RHP. Verify on the CMS the
changed status of the serial line. Connect back the cable. No double targets.
TST_Robustness_16
Manual switch from Main to Reserve of the radar data input channel
Purpose:
Execution:
From the CMS performs the manual switch of the radar serial line using the RCS
command.
Result:
Verify on the SDA Window of the CWP that the channel is changed, that the data
continue to arrive and the tracks related to that radar head are present on all the CWPs.
No double targets.
Note:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 18
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_Robustness_17
Doc N.
Iss.
Purpose:
Execution:
Result:
Switch off or reboot the CWP. Repeat this test three times.
Verify that the data continue to be presented in all CWPs because of the occurred change
of the disseminator. Verify that the new disseminator of that radar data is the next
available CWP on the list that has the possibility to disseminate that radar data. No
double targets.
Note:
The radar disseminator change procedure in the REAL operational environment is mainly
in charge of the following activities:
1. it shall search for the physical unit responsible for dissemination in the table of nodes
(DNSTB).
2. if the physical unit responsible for dissemination is not found, the disseminator
change order shall be rejected and a diagnostic message produced.
3. it shall search for the radar to be disseminated in the table of radars (RDNTB).
4. if the radar to be disseminated is not found, the disseminator change order shall be
rejected and a diagnostic message produced.
5. if the disseminator change order is not concerning the REAL operational
environment, the disseminator change order shall be rejected and a diagnostic
message produced.
6. it shall check if the disseminator physical unit is first level aligned.
7. if the physical unit responsible for dissemination is not first level aligned, the
disseminator change order shall be rejected and a diagnostic message produced.
8. If the physical unit assigned to the new dissemination is already disseminating
another radar, it shall disable the dissemination of the old radar from the RCHTB
table and send the message RCIMG.
9. If the order is of dissemination disabling, it shall disable the dissemination.
10. If the radar to be disseminated is already disseminated by another node, the latter
dissemination shall be disabled in the NSTAB table.
11. it shall definitely assign the dissemination of the specified radar to the specified
node.
12. If the specified node is in the REAL operational environment, it shall transmit the
disseminator change message to DIS (a display sub-function) and DPS (a display
sub-function).
13. it shall send the status message to XMD.
14. it shall notify SYO (a display sub-function) of the order execution.
Verify on the CMS the changed status of the disseminator. Switch on the CWP.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 19
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_Robustness_18
Doc N.
Iss.
Purpose:
Simulate a failure of one of the two-mirrored Hard disk and verify that the system
continues to write to the second one without loss of data.
Execution:
Take out one Hard Disk. After some minutes connect back the Hard Disk.
Result:
Verify that the other Hard disk continues to write and after a reconnection of the failed
one could be necessary to recover the all data following a procedure.
Note:
Verify on the CMS the changed status of the Hard Disks. It is not necessary to stop the
node to recover the Hard Disk. No data loss.
TST_Robustness_19
Purpose:
Execution:
After a recording session and during the back-up procedure, take off the cassette from the
tape unit.
Result:
Verify that the file recorded on the Hard Disk is still assigned to the Back-up waiting for a
new tape mounted. After the mounting, the system will start again the Back-up session to
the new cassette.
Note:
The cassette that has been in fault cannot have a correct data saved for the last save-set.
Repeat this test by unplugging the drive.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 20
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_Robustness_20
Doc N.
Iss.
Purpose:
Execution:
Switch off the switch in the equipment room (LAN Main). Switch on all the nodes
available.
Result:
Verify that the system will start-up to the only LAN available.
Note:
Verify on the CMS the status of the LANs. Switch on the switch. Repeat this test
switching off only the switch in operational room and switches in equipment and
operational room. When not all the switches are off, the system has to start-up beginning
from those nodes that are connected on the switch off.
TST_Robustness_21
Time synchronization
Purpose:
To have all the nodes of the system synchronised also those sited in RDS sites.
Execution:
Disconnect the GPS Clock from the RHP and then restart the application
Result:
Verify that the time in the RDS site is the same in OPS site performing some orders.
Verify also that the data continue to arrive and the tracks related to that radar head are
present on all the CWPs.
Note:
Verify on the CMS the changed status of the GPS Clock serial line. Connect back the
cable of the GPS to the RHP. Repeat this test taking off the GPS clock cable in OPS site.
Repeat again this test switching off both GPS clock in RDS site and OPS site and input
manually the new time either from one of the I/O Consoles or from the CMS.
TST_Robustness_22
Purpose:
Perform orders to the FDP node using the I/O Console of the RDP and the SLAVE RPB.
Execution:
Result:
Note:
Repeat the same order from the I/O Console of the RPB node.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 21
Doc N.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Iss.
Execution:
To switch from MASTER to SLAVE the order to be entered from the I/O console of the
MASTER node is:
SLV
and press RETURN.
If the order is acknowledged, the following diagnostic message will be displayed:
NSV: SWITCHING:
MASTER STAND-BY
At the end of the switching, the following diagnostic message will be displayed:
NSV: END SWITCHING: MASTER STAND-BY
If the order is not acknowledged, the following diagnostic message is displayed:
XXX MST: INCONSISTENCE ORDER WITH MASTER STATUS OF NODE
To switch from SLAVE to MASTER the order to be entered is:
MST
and press RETURN.
If the order is acknowledged, the following diagnostic message will be displayed:
NSV: SWITCHING:
STAND-BY
MASTER
At the end of the switching, the following diagnostic message will be displayed:
NSV: END SWITCHING: STAND-BY MASTER
If the order is not acknowledged, the following diagnostic is displayed:
XXX SLV: INCONSISTENCE ORDER WITH STANDBY STATUS OF NODE
Note:
312240262.doc
Mod.
Repeat the test three times, after the complete recovery of new master node.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 22
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_Robustness_24
Doc N.
Iss.
Purpose:
Execution:
Start a session of recording. Perform the DRS order to put the system in DARD Mode.
After some minutes, stop the recording session. Take the registration and make some
check using the Plotter function.
Result:
Verify that the data are correct both in MRT and in DARD Mode.
Note:
None.
TST_Robustness_25
Purpose:
Verify the behaviour of the system starting-up all nodes at one time.
Execution:
Switch off all the nodes of the system and switch them all on together.
Result:
Note:
None.
TST_Robustness_26
Purpose:
LAN SWITCH main Power Supply Off, Reset and full Power Off
Verify the behaviour of the system acting on the LAN switch of the Servers and CWPs.
Execution:
Switch off the Power Supply of the LAN SWITCH of the Servers. Reset the switch of the
Servers. Switch off the LAN SWITCH of the Servers
Result:
Verify that: after the first case the servers connected to that switch are misaligned to the
rest of the system until the Reserve Power Supply enters in function, after the second case
the servers connected to that switch can be misaligned to the rest of the system if the
recovery time of the LAN SWITCH, after its reset, takes some seconds, after the third
case the servers connected to that switch will be definitively misaligned to the rest of the
system and a manual change of the LAN has to be performed.
Note:
After the Switching On of the LAN SWITCH the system will recover the whole
functionality. Repeat the test in the OPS room also.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 23
Doc N.
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_Robustness_27
4.3
Iss.
FUNCTIONAL TESTS
TST_MRT_1
Purpose:
Execution:
Result:
System Mode
MRT Role
:
:
Function Status
Function Status1
Input Source
RDS
LINE
STATUS
LOC. TRK
A. SYN
F. SYN
Where:
TOT. LT,
TOT. ST:
System. Mode:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 24
<SECURITY RATING>
<LIVELLO SICUREZZA>
RFB-C:
RFB-F:
MRT Role:
node role
MST:
SBY:
Doc N.
Iss.
commutation RFB
(manually) forced RFB
MASTER or MASTER ALONE
SLAVE (stand-by)
LINE:
STATUS:
LOC.TRK:
A.SYNC:
F.SYNC:
Note:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 25
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_MRT_2
Purpose:
Execution:
Result:
Doc N.
Iss.
Note:
312240262.doc
Mod.
Repeat the same order on the Slave console to verify the alignment data.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 26
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_MRT_3
Purpose:
Execution:
Doc N.
Iss.
Result:
Note:
The values are not sent if the OPEN channel of the addressed RDS is
in NU status.
Use RAC order to display the last seven angular deviations for each
radar.
Examples:
Next order sets to 10 B.A.M. the angular deviation of radar site OT:
DEV OT B 000A
Next order sets to - 00^ 45' 00" the angular deviation of radar site BU:
DEV BU D 00.750W
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 27
Doc N.
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_MRT_4
Purpose:
Iss.
Execution:
Result:
Note:
The values are not sent if the OPEN channel of the addressed RDS is
in NU status.
Repeat the RAC order on both nodes console to verify the alignment data.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 28
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_MRT_5
Doc N.
Iss.
The alignment of a radar head data can be performed by an automatic procedure (RAL) or manually. The
decision of choosing either one or the other procedure depends mainly upon the following conditions:
Presence of radar(s) provided of SSR Site Transponder,
Presence of overlapped radar coverage between synchronised and non synchronised radars,
Number of aeroplanes flying in the overlapped area.
Experience of the System Specialist in performing MRT alignment
Upon the above said consideration the most suitable procedure of alignment will be adopted; in the
following both the possible procedures are mentioned.
a)
Purpose:
To correct the angular deviations of each radar antenna from its local Geographical North
Execution:
Effects:
The list of radars couples is scanned, and radars alignment algorithm is activated for two
radars at a time; a positive / negative diagnostic (at level 3) concludes the alignment
phase for each couple. The new deviations values are sent to the given radar sites, in
updated configuration messages. The MASTER AMR performs radar alignment; at the
end of the algorithm hard disk and stand-by RFB are aligned Use RTB and RCP orders to
check the above conditions.
Note:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 29
<SECURITY RATING>
<LIVELLO SICUREZZA>
b)
Doc N.
Iss.
Purpose:
To correct the angular deviations of each radar antenna from its local Geographical North
Execution:
Effects:
312240262.doc
Mod.
Set in BYP all the radars that have not a Site Test-Transponder to be used as reference for
the alignment.
Disable the Tracks output flow of the radar to be aligned, so that only the Plots of that
radar will be present.
Chose on the CWP the radar to be aligned and enable its Plot presentation.
Select on the relevant CWP the minimum Range Scale of presentation.
Compare the System Track (ST) against the Plots of the radar under alignment.
Minimize the difference between the System Track (ST) and the Plot using the DEVIA
order.
Enable the Tracks output flow so that also that radar can contribute for the new System
Track.
Set in OP status the radar that has been aligned.
The chosen radar is aligned and contributes for the System Tracks
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 30
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_MRT_6
Doc N.
Iss.
Purpose:
Verify the alignment of the data on Slave node after the start-up phase.
Execution:
Result:
TST_MRT_7
Both Master node and Slave node have the same parameters.
Purpose:
Execution:
Result:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 31
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_MRT_8
Purpose:
Iss.
Execution:
Doc N.
The setting is written in the Hard Disk and the Stand-by RDP is aligned.
TST_MRT_9
Purpose:
Verify the correct data coming out by the serial line from the RDP node.
Execution:
Result:
Verify that the data are the same described into the ICD document.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 32
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_MRT_10
Doc N.
Iss.
TST_MRT_11
TST_MRT_12
Purpose:
Execution:
DMP order
Verify the possibility to save a certain configuration.
Perform the DMP Order. Change one of the following parameters:
Couples, DEVIA and all the parameters included into the RCT Order.
Result:
TST_MRT_13
In the Hard Disk it will store the file with this change.
LOA Order
Purpose:
Execution:
Result:
TST_MRT_14
TST_MRT_15
TST_MRT_16
TST_MRT_17
TST_MRT_18
TST_MRT_19
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 33
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_MRT_20
Doc N.
Iss.
Purpose:
Execution:
Change the XR parameter in the MRT. Send the configuration message using CNF
command.
Result:
Verify that on the RADIN (SCP) and MRT (RCT) the parameters changed are the same.
Note:
TST_MRT_21
TST_MRT_22
TST_MRT_23
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 34
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_AGW_1
Purpose:
Iss.
Execution:
Doc N.
Rx Status
Node Role (Master or stand-by)
System Mode (RFB, RDP or DARD)
Input Lan
Total System Tracks
Configured Radars status
TST_AGW_2
Purpose:
Execution:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 35
<SECURITY RATING>
<LIVELLO SICUREZZA>
Result:
Doc N.
Iss.
Verify that:
1. The following modes of operation (source) automatic transitions shall be provided:
ARTAS Gateway RFB.
2. The automatic transition from ARTAS Gateway to RFB shall occur, at a certain time
T0, when ARTAS GTW source shall be no more available.
3. On the CWP, in the system data area, check by visual inspection that the data are
received from RFB.
TST_AGW_3
Purpose:
Execution:
Result:
Verify that:
The following modes of operation (source) manual transitions shall be provided:
ARTAS Gateway RFB.- From T0 , RFB creates system tracks from the local radar
tracks.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 36
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_AGW_4
Doc N.
Iss.
Purpose:
Execution:
Result:
from ARTAS
Verify that:
The following modes of operation (source) manual transitions shall be provided:
RFB ARTAS Gateway.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 37
<SECURITY RATING>
<LIVELLO SICUREZZA>
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Doc N.
Iss.
Page 38
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_RFE_1
Purpose:
Doc N.
Iss.
Execution:
Result:
The system will remain in RFB MODE and all radars input LAN will switch on
reserve. The full functionality is recovered by a manual node role switching.
Note:
Verify on the CMS the changed status of the nodes. Connect back the LAN on the node.
TST_RFE_2
Purpose:
Execution:
Result:
Note:
TST_RFE_3
Purpose:
Filter orders
Verify on the CWPs the behaviour of these orders.
Execution:
Perform the filter orders from the I/O console of the RFE. Perform the RTB order.
Result:
On the CWPs only the tracks belonging to the sectors not included in the filter orders are
presented. Verify with the RTB order that the line has a decrease number of targets from
the filtered line. Perform the same orders from the CMS.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 39
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_REC_1
Doc N.
Iss.
Purpose:
Execution:
Result:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 40
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_REC _3
Purpose:
Execution:
Doc N.
Iss.
Result:
After the CHF order wait for FILE CHANGED. After reaching the last saveset on the
first swap area the system automatically will write the next file on the second area.
Note:
Before changing the file wait for the end of the Back-up (END OF BACKUP ON HD1).
Perform the same orders from the CMS. Check the result on Playback.
TST_PLB_1
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 41
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_PLB _2
Doc N.
Iss.
Purpose:
Verify that the diagnostic presented on the CMS during the recording session is the same
of that printed during the playback session.
Execution:
Assign to the same sector more than one CWP in Playback mode. Assign the printer to
the PLB function and start the PLB session with the orders:
PLB ASS SP01
PLB ENA SP
PLB RUN
Print on the CMS the LOG file related to the period of the PLB session.
Result:
Both the PLB printed and the LOG file printed has the same diagnostic.
Note:
Perform the same orders from the CMS. Verify that after configuring the CWP to the real
world, the old configuration must be presented.
TST_PLB _3
REV Command
Purpose:
Execution:
Result:
Note:
312240262.doc
Mod.
Verify that it is not possible to make orders regarding the real world meantime the CWP is
in playback mode. The orders regarding the presentation can be performed. Perform the
same orders from the CMS.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 42
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_PLB _4
Doc N.
Iss.
Purpose:
If a wrong time or date is written in the positioning order the system advice about the
error.
Execution:
With the order PLB INF check the correct date and time on the file and perform the
positioning order putting a wrong time.
Result:
The following diagnostic will appear on the CMS and on the RPB I/O Console :
REPRODUCER RUN NOT POSSIBLE
Note:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 43
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_BCK _1
Purpose:
Execution:
Doc N.
Iss.
Empty tape
Verify that after that a tape is initialised the cassette is empty.
Perform the following orders:
BCK ASS DT1 WR (PASSWORD)
BCK MOU DT1 INI
BCK DMO DT1
BCK DEA DT1
BCK ASS DT1 RD
BCK MOU DT1
Result:
Note:
TST_BCK _2
Purpose:
Verify that, during a node switching there are no losses of data while the backup is
running.
Execution:
Result:
After the CHF order the old main file is locked to the BCK function and starts its file save
on the tape. After the node switching verify, with the INF order, that the data saved on the
tape are the same of what saved on the HD.
Note:
Repeat the same test with a big change file. Perform the same orders from the CMS.
Check the result on Playback. This test can be performed for backups on the local swap
areas and for backups on tapes.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 44
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_BCK _3
Doc N.
Iss.
Purpose:
Verify that the system shows a diagnostic if there is the intention to back-up a number of
savesets greater than the allowed.
Execution:
Result:
After the INF order it is possible to verify how many savesets are present on the swap
area. With the RST order it is trying to restore a file that doesnt exist on area. The
following diagnostic will be displayed :
ERROR IN COMMAND
Note:
TST_BCK _4
Purpose:
Execution:
Result:
After the ASS order the tape is assigned in write mode, After the MOU order the tape is
mounted in write mode. With the INF order it is possible to verify witch file we want to
restore. After the RST order the following diagnostic will be presented:
ERROR IN COMMAND
Note:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 45
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_BCK _5
Purpose:
Execution:
Doc N.
Iss.
Result:
With the INF order it is possible to verify witch file we want to restore. After both the
RST orders the following diagnostic will be presented:
ORDER EXECUTED
Verify that both files have the same file restored with the PLB INF command.
Note:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 46
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_CMS _1
Purpose:
Doc N.
Iss.
Global mode
Verify that, the CMS can perform all the orders foreseen in this session
Execution:
Result:
All the orders are correctly executed. Some effects are presented on the various screen of
the CMS.
Note:
From the other CMS it is not possible to make the same orders while global mode is set.
TST_CMS _2
Purpose:
Operative mode
Verify that, the CMS can perform all the orders foreseen in this session
Execution:
Result:
All the orders are correctly executed. Some effects are presented on the various screen of
the CMS.
Note:
TST_CMS _3
Purpose:
Technical mode
Verify that, the other CMS can perform all the orders foreseen in this session
Execution:
Result:
All the orders are correctly executed. Some effects are presented on the various screen of
the CMS.
Note:
TST_CMS _4
Purpose:
Diagnostic
Verify that on the CMS is possible to see the diagnostic until level 7.
Execution:
Perform the order UDL 7 ALL on all the nodes of the system from the free text menu of
the CMS.
Result:
Verify that all the nodes are producing diagnostic at level 7 and the CMS is able to show
them.
Note:
With the order UDL I ALL no diagnostic is produced by the nodes and displayed on the
CMS.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 47
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_CMS _5
Purpose:
Doc N.
Iss.
Time realignment
Verify that after the start-up the CMS is able to present the correct time of the system.
Execution:
Stop both the CMS and, after disconnecting the GPS units (also from radar heads)
perform the STT order. After the system has the new time set, start-up both CMS.
Result:
Note:
Put back the GPS units to have the correct time on the system.
TST_CMS _6
Purpose:
LOG file
Verify that the CMS can store and print a LOG file.
Execution:
From the CMS menu start a session of LOG and after a certain period stop with this
session.
Result:
Verify the diagnostic produced during the registration of the LOG file is presented and
printed and it is the same of the diagnostic appeared on the VDU.
TST_TCA _1
TST_TCA _2
TST_TCA _3
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 48
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_CWP _1
Purpose:
Doc N.
Iss.
Geographical co-ordinates
Verify the correct position of some known points.
Execution:
Built a map in which are present some known points and install it on the CWPs. Use the
mouse to verify the correct their position on the screen.
Result:
Note:
Repeat this test using the Test Transponder position with delay = 0. Repeat this test on all
the CWPs.
TST_CWP _2
Purpose:
Execution:
With the WB button, capture one of the window present on the screen and start to move it
very fast in all the direction.
Result:
Note:
TST_CWP _3
Purpose:
Verify that, if there is a lack of paper while some strips must be printed, the strips will be
printed as soon as the device has the new paper carried on.
Execution:
Take out the paper from the strip printer. Perform some orders on some flight plans to
have some strips (ex. EST order, Take OFF) and put a new paper into the strip device.
Result:
Verify that after the new paper is installed the previous strips will be printed.
Note:
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 49
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_CWP _4
Doc N.
Iss.
Passage from MRT to DARD and Vice versa (Not Applicable for RDP/RFB)
Purpose:
Verify that on the CWPs there is no loss of information regarding the tracks and their
correlated flight plans on selected radar if it is disseminated, during the passage from
MRT to DARD and Vice versa.
Execution:
Result:
Verify on the CWPs there is no loss of information on selected radar during the passage
from MRT to DARD and vice versa.
Note:
During the transition MRT->DARD all the SFPL correlated to the tracks outside the coverage of selected
bypass radar will be lost and displayed into Coast List, while the tracks under coverage remain correlated.
After the switch in MRT mode, the controller to recover the normal working condition shall act on the all
tracks outside the coverage of selected bypass radar using the appropriate command (AoC for the
tentative tracks and Correlate to correlate the pending tracks and flights in coast list).
TST_CWP _5
Purpose:
Verify the reaction of the system if there is a failure of the DARD LAN in DARD
Mode.
Execution:
Result:
Note:
It is necessary to have at least one of the RDPs operative to recover the situation,
otherwise it should be considered as a double fault.
TST_CWP _6
Purpose:
Verify the behaviour of the system after changing the Mode A code when a flight plan is
correlated to the relative track.
Execution:
Correlate a flight plan to a track and after that ask the pilot to change the Mode A Code.
Result:
Verify on the CWP that the flight plan is still correlated to the same track and the new
SSR Code is presented on the lists of that flight plan. .
Note:
None.
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 50
<SECURITY RATING>
<LIVELLO SICUREZZA>
TST_CWP _7
Doc N.
Iss.
Purpose:
Verify that there is an automatic change of disseminator after a manual switch of radar
disseminator in one CWP.
Execution:
Chose a CWP that is disseminating a certain radar and perform the DSC command to
another radar.
Result:
Verify that the previous radar disseminated is not disseminating anymore and the new
chosen radar is disseminating. Verify on the CWPs that the radar data coming from the
radar are displayed into 10 seconds.
None.
Note:
TST_CWP _8
Purpose:
Meteo MAPS
Verify the possibility to select the Meteo Maps on the CWP.
Execution:
Select primary radar. From the LDA of the CWP, select the MAP Menu and choose one of
the six Meteo Maps available.
Result:
Verify on the CWP that the Meteo Maps are presented in base of what selected.
Note:
The line has to be connected to the port of the RFE node in witch it is foreseen the Meteo
Channel.
TST_CWP _9
Purpose:
Verify that there is no lost of tracks presentation if the highest level of diagnostic is
enabled.
Execution:
Result:
Verify on the CWP that there are not lost of data and on the CMS the highest level of
diagnostic coming from the radar selected are displayed.
Note:
None
312240262.doc
Mod.
<SECURITY RATING>
<LIVELLO SICUREZZA>
Page 51
<SECURITY RATING>
<LIVELLO SICUREZZA>
5.
Doc N.
Iss.
TESTS RESULTS
All the results obtained during the acceptance tests are reported into the Tests Data Record contained in
Annex 01- E184-02-1875ATP01TDR.