HTLS Conductor
1. Capacity Upgrading
2. HTLS Conductor
3. Experience
4. Summary
OHM TEKMIN
Telf. 51 1 260 8616 Fax 51 1 260 8616
[email protected]
* HTLS Conductor: High Temperature Low Sag Conductor
1. Capacity Upgrading
Background
Solution
Very
Very high
high cost
cost to
to install
install new
new power
power lines
lines
Too
Too difficult
difficult to
to acquire
acquire tower
tower sites
sites
and
and right-of-way
right-of-way
Re-conductoring
Re-conductoring of
of existing
existing lines
lines
Not
Not enough
enough time
time to
to built
built new
new lines
lines
High Temperature
Popular
Popular feeling
feeling against
against construction
construction of
of
high
high voltage
voltage overhead
overhead lines
lines
in
in urban
urban and
and suburban
suburban areas
areas
with
with
2. HTLS Conductor
Optimized HTLSC
Current
Capacity
Reliability
Sag
Optimized
HTLS Conductor
Installation
Conductor cost
Economics
Labor cost
Low line loss
2. HTLS Conductor
Developmental Trend
Key materials
Ampacity
GAP
Conductor
ACSS
x 2.0
Material
STACIR
Conductor
GAP 3
TACSR
Conductor HiTACSR
x 1.5
x 1.0
Copper
ACSR
Conductor
Max.
current
Ratio
Application
ACSR
Steel
Al
90 oC
x 1.0
TACSR
Steel
TAl
150 oC
x 1.55
Uprating
with increased sag
Hi-TACSR
Steel
Hi-TAl
150 oC
x 1.5
Uprating
for long span
STACIR
INVAR
STAl
210 oC
x 2.0
Uprating
with equivalent sag
ACFR
CFCC
Al
90 oC
x 1.0
Increase G.clearance
under same capacity
* A key to abbreviations:
AAAC
Core
Max.
operating
temp.
ACFR
1880 1910
1960
1980 1990
2000
Year
2. HTLS Conductor
STACIR Conductor
High
High Strength
Strength AW
AW
Aluminum-clad
Aluminum-clad Invar
Invar
STAL
STAL
Super
Super Thermal
Thermal Resistant
Resistant
Al-Alloy
Conductor
Al-Alloy Conductor
2. HTLS Conductor
STAL Conductor
TAL
Hi-TAL
STAL
2.7
2.7
2.7
2.7
61
60
55
60
16.2
~17.9
16.2
~17.9
22.9
~25.7
16.2
~17.9
Continuous
90
150
150
210
Emergency
120
180
180
240
Ampacity
x 1.0
x 1.5
x 1.5
x 2.0
Applicable
Conductor
ACSR
TACSR
Hi-TACSR
STACIR
110
Density
(g/cm3)
Conductivity
(%IACS)
90
Tensile Strength
(kgf/mm2)
80
Allowable
Temp. (oC)
Residual strength, %
100
70
60
STAL
HAL
50
0
100
200
300
400
500
(River-crossing)
OHM TEKMIN
Telf. 51 1 260 8616 Fax 51 1 260 8616
[email protected]
2. HTLS Conductor
INVAR Core
Thermal Expansion
Cable Sag - mm
m
20
n
lva
a
G
10
i
lw
e
e
t
dS
e
z
i
:
re
0
x1
5
.
11
800
50
100
150
200
250
300
x1/3
100
-6
.7x10 /
3
:
e
ir
W
r
a
v
In
Al-clad
0
-100
1,200
400
200
300
Temperature, C
Tension vs Temperature *
3,000
400
Cable Tension - kg
Dimension Change,
-6
30
1,600
40
Sag vs Temperature *
2,000
1,000
50
100
150
200
250
300
x2 Capacity
Upgrading
2. HTLS Conductor
Type of Fittings
Compression type
with larger volume
Remark
Armor grip or wedge type
are not recommendable.
Joint sleeve
Armor grip type is
not recommendable.
Suspension clamp
Bundle spacer
the same as
those used for ACSR
Diameter (D)
ACSR
590
48
STACIR
675
52
Vibration damper
insulator
(Unit: mm)
OHM TEKMIN
Telf. 51 1 260 8616 Fax 51 1 260 8616
[email protected]
2. HTLS Conductor
Installation
2. HTLS Conductor
Installation
2circuit
/ 2conductor,
30 r.km
Second
Second Circuit
Circuit Replacement
Replacement
Enough time for shut down
Enough time for shut down
1. Determine shut-off period
1. Determine shut-off period
not considering electric load
not considering electric load
( One HTLS circuit has double ampacity)
( One HTLS circuit has double ampacity)
2. One HTLS circuit : Increasing capacity
2. One HTLS circuit : Increasing capacity
Other circuit : Shut down
Other circuit : Shut down
3. Start replacement work
3. Start replacement work
2. HTLS Conductor
Economic Evaluation
Capacity Upgrading
Comparative Cost Analysis
(Operation Period : 30 Years)
Build
New Line
Replacement
by HTLSC
100%
Build
Period
Construction
Cost
Based on 30 route.km
18 Months
6 Months
(Short Period)
Preliminary work
Required
Not Required
High Cost
No Cost
Tower Foundation
Required
Not Required
High price
Required
Not Required
Not Required
Line Accessories
Required
Partially Required
Grounding
Required
Not Required
Operation
Cost
kWh Loss
Low
High
Opportunity
Cost
High
Low
Small
Small Cost
47% Down
53%
Low price
Required
Required
Required
Maintenance
Cost
PPR
REELLI
IM
MIIN
NA
AR
RYY
Operation
(kWh Loss)
Construction
of New Line
Maintenance
Construction
Material
(same as ACSR)
Replacement
By HTLSC
3. Experience
KEPCO
KEPCO // Korea
Korea
Korea
Korea Electric
Electric Power
Power Corporation
Corporation
KEPCO / Korea
Customer Problems
Existing
LGC Proposal
ACSR
480x2B
STACIR
410x2B
918
1,707
Sag [m]
10.21
9.79
Tension[kgf]
4,140
4,140
Ampacity
[A/cond.]
Voltage
grade
High Capacity.
Conductor
345kV
383
154kV
1,360
Total
1,743
3. Experience
KEPCO / Korea
3. Experience
TNB
TNB // Malaysia
Malaysia
Tenaga
Tenaga Nasional
Nasional Berhad
Berhad
TNB / Malaysia
ACSR
STACIR
400 (Zebra)
410
719Amp/cond.
1,584Amp/cond.
ENEL / Italy
ENDESA / Spain
3. Experience
ENEL
ENEL // Italy
Italy
Enel
Enel Distribuzione
Distribuzione SpA
SpA
Customer Problems
LGs Proposal
STACIR
ENDESA
ENDESA // Spain
Spain
Empresa
Empresa Nacional
Nacional de
de Electricidad
Electricidad S.A,
S.A,
Customer Problems
Rapid increase
in the demand for electric power
240
1,207Amp/cond.
* Condition : wind pressure 88kg/
safety factor 2.0
Operating Temp.: ACSR 90
STACIR 210
LGs Proposal
ACSR/AW
STACIR
477MCM(Hawk)
240
606Amp/cond.
1,207Amp/cond.
3. Experience
Power
Power Grid
Grid // India
India
Customer Problems
Existing
ACSR
Moose x 2B
LSC Proposal
STACIR/AW
Moose x 2B
Technical Proposal
: December 2002
Scope: Conductor & Fittings
Ampacity
[A/cond.]
614
1,700
3. Experience
LILO of one circuit of 400kV D/C
Dadri-Ballabhgarh New Transmission Line
at New Delhi (Maharani-Bagh) Sub Station
OHM TEKMIN
Telf. 51 1 260 8616 Fax 51 1 260 8616
[email protected]
3. Experience
China
China
Capacity upgrading
by replacement of
the existing ACSR
with Invar conductor
3. Experience
PGCB
PGCB // Bangladesh
Bangladesh (SIEMENS)
(SIEMENS)
Power
Power Grid
Grid Company
Company of
of Bangladesh
Bangladesh
PGCB / Bangladesh
ACSR
400mm2 Zebra
737A
STACIR
400mm2 Zebra
1,645A
QPPL
QPPL // Philippines
Philippines
Quezon
Quezon Power
Power Philippines
Philippines Co.
Co. Ltd.
Ltd. (IPP)
(IPP)
QPPL / Philippines
Mauban Plant
A. Existing Power Plant Generation (Unit 1)
1. Plant Capacity : 600MW
2. Transmission Line:
a) Line Voltage: 230kV
b) Line Length: 31 km
c) Structure Type:
Lattice Steel Towers, Double Circuit
e) Line Conductors:
2 x 795 kCM ACSR "Condor"
Capacity Upgrading
by replacement
of the existing ACSR conductor
with STACIR 410mm2 !
Line Capacity > 1,200MW !
Tech.
4. Summary
Double ampacity uprating with STACIR Conductor
on the existing towers
STACIR Conductor has more than double ampacity of conventional ACSR
STACIR Conductor has equivalent sag-tension properties to conventional ACSR
Conventional fittings and accessories for ACSR can be used
for STACIR Conductor except compression fittings
Same installation method as conventional ACSR is applied for Invar Conductor
STACIR Conductor has high long-term reliability with strong track record
Most power utilities do use STACIR Conductor for their uprating project !
Thank You !