0% found this document useful (0 votes)
37 views4 pages

List of Routine Tasks-3 Monthly, 6 Monthly and SBS: Maintenance Planning Division

This maintenance document lists 4 routine tasks for aircraft 9N-ABX, including a 3 monthly inspection, 6 monthly inspection, inspection of the wing front spar adapter assembly for cracks per SB V6/540, and a compass swing to be completed. It provides the job description and space to record the date and technicians who performed each task.

Uploaded by

Dipendra Sen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views4 pages

List of Routine Tasks-3 Monthly, 6 Monthly and SBS: Maintenance Planning Division

This maintenance document lists 4 routine tasks for aircraft 9N-ABX, including a 3 monthly inspection, 6 monthly inspection, inspection of the wing front spar adapter assembly for cracks per SB V6/540, and a compass swing to be completed. It provides the job description and space to record the date and technicians who performed each task.

Uploaded by

Dipendra Sen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Maintenance Planning Division

List of Routine Tasks- 3 Monthly, 6 Monthly and SBs


AIRCRAFT: 9N-ABX
S/N

JOB DESCRIPTION

3 MONTHLY INSPECTION

6 MONTHLY INSPECTION

SB V6/540 Wing - Front spar adapter assembly Inspection for cracks

Compass Swing

DATE

TECH

ENGINEER

You might also like