HSE Monthly Statisctical Report February 2016

The SSH HSE Monthly Statistical Report summarizes safety statistics for the Bid Pack 5A,B construction project at Sabah Al-Salem University City in Kuwait for February 2016. The average number of employees on site was 547, with 230,315 total man-hours worked. There were 4 medical treatment cases but no lost time injuries, fatalities, or environmental incidents. The contractor submitted 2 risk assessments for review but did not respond to 12 safety violation notices within the required time. A total of 15 training hours were conducted along with 3 HSE meetings and inspections attended by SSH representatives.

Uploaded by

naveed566
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
1K views2 pages

HSE Monthly Statisctical Report February 2016

The SSH HSE Monthly Statistical Report summarizes safety statistics for the Bid Pack 5A,B construction project at Sabah Al-Salem University City in Kuwait for February 2016. The average number of employees on site was 547, with 230,315 total man-hours worked. There were 4 medical treatment cases but no lost time injuries, fatalities, or environmental incidents. The contractor submitted 2 risk assessments for review but did not respond to 12 safety violation notices within the required time. A total of 15 training hours were conducted along with 3 HSE meetings and inspections attended by SSH representatives.

Uploaded by

naveed566
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SSH HSE Monthly Statistical Report for RE Supervision Sites

Project :

Bid Pack 5A,B -Roads, Site Utilities, Substations, Surface Parking ,Land Scaping and Oasis works

Main Contractor:

Sinohydro Corporation Limited (China) JV. M/s. Copri Co

Location:

SABAH AL- SALEM UNIVERSITY CITY - KUWAIT UNIVERSITY

Month/Year:

February 2016

By:

Naveed

Description

Quantity Surveyor

Position:

Cumulative

Previous

Current Month

from start of

Month

year

General Project HSE Information


Average Number of Employees on Site per Day (SSHI + Contractor)

(47+397) = 444

(47+500) = 547

547

Total Man-hours Worked ( 10 hours per employee x days worked)

102,120

128,195

230,315

Number Environmental Impact Assessments submitted by contractor for

Number of Risk Assessments Submitted by contractor for review

Number of dedicated HSE Staff for Project

Fatalities (FAT)

Lost-time Injuries (LTI)

Number of Lost Workdays

Medical Treatment Cases (MTC) visits to Offsite Clinic or Hospital

First Aid Cases (FAC) seen on site work related

Number of Near Miss Incidents

Number of Property Damage Incidents

Number of Fire Incidents

Number of Environmental incidents

Regulatory Notifications/Prohibition/Penalties (number issued)

Safety Violation Notices (SVN) / relevant to HSE Issued by RE

12

Safety Violation Notices (SVN) / relevant Overdue for Closure (Contractor

review

Lagging Key Performance Indicator (KPI) Monthly Metrics

0
0
0
0
0

12

11
12

12

12

10

19

Number of HSE Induction Training Programs Held

Number of Attendees to HSE Induction

N/A

0
N/A
3
0
5
0
NA
NA

0
0
0
0
15

Does Not Respond in Prescribed Time (i.e. 48 Hours))


Safety Violation Notices (SVN) Closed in prescribed time (closed without
time constrain)
Leading Key Performance Indicator (KPI) Monthly Metrics (Internal)
Number of HSE Meetings Held (not tool box talks) which SSH Attend

Number of HSE Inspections which SSH attend

rd

Number of HSE Audits by either SSH or 3 party

Total HSE Training Hours conducted during the month

Number of Emergency Drills &/or Exercises conducted

Total amount of waste produced and removed from site ( in cubic metres)

NA

Total amount of recycled waste (in cubic metres)

NA

Signature:
April, 2015

N/A
6
0
9
NA
NA

Date: 06 March 2016


Doc Number: QSE01_FRM_009_v2.0_CD

Page 1 of 2

SSH HSE Monthly Statistical Report for RE Supervision Sites

April, 2015

Doc Number: QSE01_FRM_009_v2.0_CD

Page 2 of 2