Lab Report #1: Operation of Power Systems ELEC
Lab Report #1: Operation of Power Systems ELEC
Lab Report #1
Instructor: Dr. Khaled Ellithy
TA: Eng. Mazen Faiter
Done By:
Abdel-Rahman Mahmoud
201103553
201102740
Danilo Cristos
201107684
Matlab Code:
clear
cost = [0
0
limits=[
10
0.008
8
0.009];
100 600
400 1000];
Pdt = 500;
dispatch
gencost
Results:
PD [MW]
P1 [MW]
P2 [MW]
[$/MW.h]
500
205.8824
294.1176
13.294118
5529.41
600
258.8235
341.1765
14.141176
6901.18
900
417.6471
482.3529
16.682353
11524.71
1400
682.3529
717.6471
20.917647
20924.71
Rejected
Since the limits for two generators are as following:
100 P1 600 MW
400 P2 1000 MW
So when PD = 1400 MW, P1 exceeds the limits of first generator. That is why we have to set
it to the limit so it becomes P1 = 600 MW. See the results in the following table:
1400
Comments:
600.0000
800.0000
20924.71
21040.00
Accepted
Basically, the concept of economic dispatch is to minimize the cost of generators while keep
providing the required amount of power Demand. By using MATLAB code which is
mentioned above, we have tried several loads starting from 500 MW till 1400 MW. By
considering generators limits, then output power of loads from 500 MW to 900 MW are within
the specified limits. However, output power of 1400 MW load exceeds the limits. So, we have
to change the output to be within the specified limits which is 600 MW. After doing this
modifications, we ran the MATLAB code again to get the optimized results.