0% found this document useful (0 votes)
209 views1 page

Test Report Form

The test report summarizes the results of a piping system test conducted on a project. It lists the job reference, date, project title, client, contractors, test location, pipe specification, and piping system tested. The report indicates the period of testing, type of inspection, test results at the start and completion of testing, and the final test result, which was approved.

Uploaded by

imteyazhmd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
209 views1 page

Test Report Form

The test report summarizes the results of a piping system test conducted on a project. It lists the job reference, date, project title, client, contractors, test location, pipe specification, and piping system tested. The report indicates the period of testing, type of inspection, test results at the start and completion of testing, and the final test result, which was approved.

Uploaded by

imteyazhmd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TEST REPORT

Job Ref.

Date:

PROJECT TITLE
CLIENT
CONSULTANT
MAIN CONTRACTOR
MEP CONTRACTOR

TYPE OF TEST
TEST LOCATION
PIPE SPECIFICATION

Report Ref No.

PIPING SYSTEM TESTED

INSPECTION/TEST SHEET :
PERIOD OF TESTING

TYPE OF INSPECTION
Result on start of Test

Result on Completion of Test

Final Result

DATE/TIME

TEST RESULTS:

APPROVED

APPROVED WITH COMMENTS

COMMENTS : -

Witnesses:-

TEST PERFORMED BY:

TEST WITNESSED BY:

for Gulf Engineering LLC, Dubai.

P.O.Box : 235069, Dubai U.A.E, Tel: +9714 2513677, Fax: +9714 2513678
[email protected]

NOT APPROVED