Prerequisites: PLM220 SAP Project System - Logistics

This document provides information about the PLM220 certification exam for SAP's Project System module. The exam covers topics like project structures, scheduling, capacities, external and internal activities, materials, and progress tracking in projects. The exam is a 5 day online proctored exam available in English. Prerequisites include passing the PLM200 or PLM210 exam. The document lists detailed content areas and sub-topics that will be covered on the exam.

Uploaded by

AVINASH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
767 views2 pages

Prerequisites: PLM220 SAP Project System - Logistics

This document provides information about the PLM220 certification exam for SAP's Project System module. The exam covers topics like project structures, scheduling, capacities, external and internal activities, materials, and progress tracking in projects. The exam is a 5 day online proctored exam available in English. Prerequisites include passing the PLM200 or PLM210 exam. The document lists detailed content areas and sub-topics that will be covered on the exam.

Uploaded by

AVINASH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PLM220

SAP Project System - Logistics


Product Group
Solution
Sub-solution
Component
Delivery Methods
Level
Exam
Sample Questions
Cut Score
Duration
Languages

:
: SAP ERP
:
:
: Certification
: Details, Configuration & Transaction
:
: PDF Link
:
: 5 days
: English

Prerequisites
Essential

PLM200 or PLM210

Recommended

None

SAP ERP 6.0 with Enhancement Package 7; MRS 9.0

Project Structures
o Creating Project Structures
Functions and Types of Scheduling
o Scheduling Dates for WBS Elements
o Performing Scheduling of Network and Activities
o Customizing in Time Scheduling
o Scheduling Activities
o Scheduling Constraints and Dependencies in Networks
o Setting Actual Dates for WBS Elements and Activities
Project Capacities
o Processing Internal Activities
o Analyzing Internal Activities and Capacity Requirements
o Generating Capacity Requirements
o Executing Capacity Analyses for Projects and Work Centers
o Performing Capacity Leveling
o Performing Capacity Leveling with MRS
o Processing Confirmations and Triggering a Workflow for Variances
o Confirming Network Activities using the Cross Application Time Sheet (CATS)
External Activities
o Executing Services for Externally-Processed Activities
o Using Workflows in the Project System
o Integrating Service Activities
Project Materials
o Assigning Material Components to Network Manually

Course based on software release


Content

Assigning Material Components to Activities Automatically


Maintaining the Field Selection for Material Components
o Searching for Materials using Enhanced Features and Functions
o Processing Material Procurement
o Creating a Third-Party Requisition for Non-Stock Items
o Executing an In-House Production Process
o Processing Preliminary Requirements in Projects
o Grouping Material Requirements
o Using Material Assemblies
o Performing a Material Availability Check
o Generating Deliveries for the Shipping of Assemblies
Progress Tracking
o Monitoring Deadlines using Progress Tracking
Project Analysis and Procurement Processes with ProMan
o Monitoring Logistical Data and Procurement Processes using ProMan