Kalisindh Thermal Power Plant
Kalisindh Thermal Power Plant
Kalisindh Thermal Power Plant
ON
GENERATION OF ELECTRICITY
KALISINDH THERMAL POWER PLANT
Under Guidance of
MR. S.P. MEENA
1
ACKNOWLOWEDGMENT
I am gratefully indebted to my management for the many opportunities given to me for
doing this project work. I am profoundly grateful to Mr. MANOJ MITTAL (HOD, ME) in Gecj
College.
I am come out of impression and knowledge, which has been given to me by the
supervision, guidance and valuable suggestion from all the faculty members during the
completely academic session.
I also want to thanks Mr. S.P. MEENA assistant personnel officer katpp, RVUNL,
JHALAWAR for allowing me for the practical training in the plant.
I would also like to pay thanks to all the staff of electrical section for their kind support.
RAKESH KUMAR
B. TECH, 4TH YEAR
7TH SEM, ME
CERTIFICATE
This is to certify that Industrial Training report presented by RAKESH KUMAR student of
4th year B.TECH. in "MECHANICAL ENGINEERING" is the bonfire presentation of his work
done by him under my supervision and guidance. They have submitted this project report
towards partial fulfillment for the award of degree of Bachelor of technology of GECJ during
the academic year (2014-2015). Its further certified that this work has not been submitted
elsewhere for the award of any other degree or diploma.
CHAPTER-1
Chapter name:-
page no:-
1.1
1.2
WORKING PRINCIPLE..................................................10
1.3
1.4
PLANT LAYOUT..............................................................12
CHAPTER-2
2.1
DESCRIPTION OF COMPONENTS..............................13
CHAPTER-3
3.1 GENERATOR................................................................21-23
3.2 TRANSFORMER...........................................................24-26
CHAPTER-4
4.1 SWITCHYARD..............................................................27-29
4.1(a) CIRCUIT BREAKER...................................................27
4.1(b) ISOLATOR....................................................................28
4.1(c) LIGHTNING ARRESTER...........................................28
4.1(d) EARTHING ISOLATOR.............................................29
4.2
SWITCHSER.29-30
CHAPTER-5
CHAPTER-6
CHAPTER-7
CHAPTER-8
COOLING TOWER.............................................................40
CHAPTER-9
EFFICIENCY.......................................................................41
CHAPTER-10
CONCLUSION....................................................................42
REFERENCE.......................................................................43
LIST OF FIGURE:-
PAGE NO
1.
2.
Rankine cycle................................................................
10
3.
Plant layout.....................................................................
12
4.
General Boiler................................................................
13
5.
Boiler in kalisindh.........................................................
14
6.
Turbine stages...............................................................
20
7.
Turbine in kalisindh.......................................................
20
8.
Generator in kalisindh....................................................
21
9.
Transformer in kalisindh...............................................
26
10.
Circuit breaker...............................................................
27
11.
28
12.
35
13.
40
LIST OF TABLES:TABLE NO
NAME OF TOPIC
PAGE NO
1.
2.
3.
4.
Wagon trippler................................................... 37
5.
Chrusher Machine 37
CHAPTER-1
1.1 INTRODUCTION TO KALISINDH THERMAL POWER PLANT
The site of kalisindh thermal power plant is located in Nimoda, Undal, Motipura, Singharia and
Devri villages of tehsil Jhalarapatan, dist-jhalawar, Rajasthan. The proposed capacity of coal
based thermal power project is 2x600=1200 MW. The project site is about 12km from Jhalawar
and NH-12.it is 2km from state highway no 19 and 8km from Ramganj Mandi-Bhopal broad
gauge rail line.
This power plant is included by the govt. Of Rajasthan in 11th five year plan.
The cost for this power plant is 7723 crores proposed by govt and this power plant is constructed
with the help of BGR Company Chennai
10
Boiler
Super heater
Turbine
Condenser
Alternator
Cooling tower
Economiser
Air preheater
Chimney
Transformer
Exciter
11
12
13
combustion. So boiler is also called steam generator. It is one of the major components of
thermal power plant. The transfer of heat from boiler to raise the temperature of steam is done by
three methods i.e.by conduction, convection and radiation.
The process of heating a liquid until reaches its gaseous state is
called evaporation. Boiler are tangentially fired, balance draft ,natural circulation, radiant type,
dry bottom with high ash content.oil burners are located between coal burners for flame
stabilisation. Pulverized coal is directly fed from coal mills
14
15
In simple way, boiler is a device used for producing steam. There are two types of boiler
(depending upon tube content):
Here, boiler used is of water type. In the boiler, heat energy transfer takes place through tube
walls and drum. The gases lose their heat to water in the boiler or superheated. The escape heat is
used to heat the water through economizer.
ID and FD fans are used to produce artificial draught. The fuel oil is used to ignite the boiler and
pulverized coal is lifted from the coal mills by PA fans.
WATER TUBE BOILER USED IN KaTPP WITH 97M HIGHT
Various motors use in boiler are different rating and parameters 32KW ,15KW ,11KW ,& 3.3KW
Parameter in 15KW motor
Motor rating
15 KW
Speed
970 r.p.m
Rated voltage
416 V
Rated current
28.4 A
Impedance voltage
80.0 %
Oil weight
20 Kg
224 Kg
Total weight
600 Kg
Temp rise
16
HOW IT WORKThe concept of burning coal that has been pulverized into a fine powder so that if the coal is
made fine enough, it will burn almost and efficiently as gas. The feeding rate of coal according to
boiler demand and amount of air available for drying and transporting the pulverized coal is
controlled by control room. Pieces of coal are crushed between balls or cylindrical rollers that
move between two tracks or races. The raw coal is then fed into the pulveriser along with air
heated to about 650-degree fareheight from the boiler. As the coal is crushed by the rolling
action, the hot air dries it and blows the usable fine coal powder out to be used as fuel. The
powder coal from the pulveriser is directly blown to a burner in the boiler.
The boiler system comprises of
Steam system
Fuel system
17
Superheated steam being dry, turbine blades remain dry so the mechanical
resistance to the flow of steam over them is small resulting in high efficiency.
REHEATER: It is used for heat addition and increase the temperature of steam
coming from high pressure turbine to 540 deg . Reheater are provided to raise the
temperature of the steam from which part of energy has already been extracted by
HP turbine. this is done so that the steam remains dry as far as possible through
the last stage of the turbine. A reheater can also be convection, radiation or
combination of both.
FANS: They handle the supply of air and the pressure of furnace.
18
2.1(c) BOILER MOUNTINGS-These are used for the safe operation of boiler. Some
example of mountings used are water level indicator in drum, furnace temperature probe, reheat
release valve, pressure gauges indicating steam pressure etc.
PRINCIPLE Working of the steam turbine depends wholly upon the dynamic action of steam.
The steam is caused to fall with pressure in a passage of nozzle, due to this fall in pressure, a
whole amount of heat energy is converted into mechanical energy & steam is set moving with
the reactor velocity. The rapidly moving particle of steam enter the moving part of turbine and
here suffers a change in the direction of motion which gives rise to change of momentum and
therefore to a force. This constitutes a driving force to a turbine.
The passage of them/through the moving part of the turbine commonly called the blade,
may take place in such a manner that the pressure at the outlet sides of the blade is equal to that
of the inlet side. Such a turbine is broadly termed as outlet turbine or Impulse type.
On the other hand, the pressure of the steam at outlet from the moving blade may be less
than that at type inlet side of the blade. The drop of pressure suffered by the steam during its
flow through the moving blades causes a further generation of kinetic energy within the blades
and adds to the propelling force, which is applied to the turbine rotor, such a turbine is broadly
termed as Reaction Turbine. Here in Kalisindh Thermal Power Project N600-16.7/587/537,ReHet,Three Casing, Four Exhaust, Tandem Compound Condenser Type Turbine Used.
The turbine is of tandem compound design with separate High Pressure (HP), Intermediate
Pressure (IP) and Low Pressure (LP) cylinders. The HP turbine is of Single Flow type while IP
and LP turbines are of Double Flow type .The turbine is condensing type with single reheat. It is
engineered on reaction principle with throttle governing. The stages are arranged in HP, IP AND
LP turbines driving alternating current full capacity turbo generator.
The readily designed HP, IP and LP turbines are combined and sized to required power
output, steam parameters and cycle configuration to give most economical turbine set. The
19
design and constructional feature have proved their reliability in service and ensure trouble free
operation over long operating periods and at the same time ensuring high thermal efficiencies.
HP TURBINE:The hp casing is a barrel type casing without axial joint. Because of its rotation symmetry the
barrel type casing remain constant in shape and leak proof during quick change in temperature.
The inner casing tool is cylinder in shape as horizontal joint flange are relieved by higher
pressure arising outside and this can kept small. Due to this reasion barrel type casing are
speially suitable for quick start up and loading. The hp turbine consists of 25 reactions stages.
The moving and stationary blades are inserted int appropriately shapes into inner casing and the
shaft to redue leakage losses at blade tips.
IP TURBINE:the IP part of turbine is of double flow construction. The double flow inner casing is supported
kinematically in the outer casing. The steam from HP turbine after reheating enters the inner
casing from above and below through two inlet nozzles.The centre flows compensate the axial
thrust and prevent steam inlet temperature affecting brackets, bearing etc. the arrangement of
inner casing confines high steam inlet condition admission branch of casing, while the joints of
outer casing is subjeted only to lower pressure and temperature at the exhaust of inner casing.
The pressure in outer casing relieves the joint of inner casing so that this joint is to be sealed only
against resulting differential pressure.
The IP turbine consists of 20 reactions stages per flow the moving and
stationary blades are inserted in appropriately shaped grooves in shaft and inner casing.
LP TURBINE:The casing of double flow type LP turbine is of three shell design. The shells are axially split and
have rigidly welded construction. The outer casing consist of the front and rear walls, the lateral
longitudinal support bearing and upper part.
The outer casing is supported by the ends of longitudinal beams on the base
plates of foundation. The double flow inner casing consist of outer shell and inner shell the inner
shell is attached to outer shell with provision of free thermal movement. Steam admitted to LP
turbine from IP turbine flows into the inner casing from both sides through steam inlet nozzles.
20
21
CHAPTER-3
3.1 GENERATOR:Generator is the important part of thermal power plant. It is a device, which
convert the mechanical energy into electrical energy. Generator is driven by coupled steam
turbine at a speed of 3000 r.p.m. Due to rotation at high speed it get heat. Therefore, there is
cooling construction enclosing the winding core of the generator so that during the operation is
being in normal temperature.
In KaTPP , Each of the 2 units have been provided with 3-phase turbo generator rated
output 706MVA, 18.525KA, 22KV, 0.85 lagging p. f. , 984 rpm and 50 cycles/sec .The generator
has closed loop of hydrogen gas system for cooling of the stator and rotor at a pressure of
4.5kg/sq-cm(g)
Each generator has terminal led out of its casing and a star point is formed by
sorting the neutral side terminals by a sorting bar. The neutral is grounded by a 1-phase
11000/220v, neutral grounding transformer, whose secondary coil is laminated by laminated strip
with mechanical ventilating holes, is connected across a 650v, class 0.4 ohm, 50 kw neutral
grounding resistors and relays for protection of generator against stator earth faults and stator in
turns fault.
22
CQ GEARBOX China
Type
QFSN
Apparent output
706 MVA
Active output
600 MW
Power factor
0.85 lagging
Rated voltage
22 KV
Rated current
18525 Amp
Rated speed
3000 r.p.m
Frequency
50 Hz
Phase connections
Double gen.star
Cooling mode
H20-H2-H2
Rated H2 pressure
4.5 Kg/sq-cm
Terminal in generator
TABLE -3 DIESEL GENERATOR SET:It is used to emergency purpose to supply auxiliary system of power plant.3 Set Diesel generator
are use in which one is standby. Parameters of generator are as
Make BY
Rating
1900 KVA
Speed
1500 R.P.M
Rated Current
2643.37 A
Rated Temp
40 Deg cell
AMPS
3.6 A
23
STATOR BODY:Armature of a generator formed of laminations having slots on its inner periphery to
accommodate armature conductor and is known as stator. The stator body is totally enclosed gas
tight fabricated structure suitably internally to rigidity. The function of stator frame is to contain
and support the stator core winding, hydrogen coolers and path for distribution of cooling
hydrogen through the generator.
STATOR CORE:The rotating magnetic field flow with the core in order to reduce the magnetizing current
(eddy current) losses in the active portion of the stator core due to rotation of field structure
in between the stator the entire core is built up of thin laminations.
STATOR WINDING:The stator has 3-phase double layer, short pitched and bar type of winding having two
parallel paths. Each slot accommodates two bars. The upper and lower bars are displaced
from each other by one winding pitch and connected at their ends to form coil groups. Each
bar consists of solid as well as hollow conductor with cooling water passing through the later
alternator.
ROTOR:The field structure is the largest and heaviest component of generator and is called the rotor.
The rotor houses the static excitation winding and the exciting current is supplied to the rotor
through the slip rings and brushes. The rotor shaft is a single piece forging the longitudinal
slot for inserting the field winding. The slots are distributed over the circumference so that
two field solid poles are obtained.
Negative sequence relay is used for the protection of generator.
3.2 TRANSFORMER
24
Transformer is a static device which is used to change the voltage level keeping the power and
frequency same. In the power plant transformer is one of the most important equipment. The
transformer works on the principle of Faradays laws of Electromagnetic induction. This process
is completed in two process first the A.C applied is converted into magnetic flux then this flux
linked with secondary winding giving as of desired value depending on the no. Of turns in
primary and secondary winding.
Whenever we apply alternating current to an electric coil, there will be an alternating
flux surrounding that coil. Now if we bring another coil near the first one, there will be an
alternating flux linkage with that second coil. As the flux is alternating, there will be obviously a
rate of change in flux linkage with respect to time in the second coil. Naturally, emf will be
induced in it as per Faraday's law of electromagnetic induction. This is the most basic concept of
the theory of transformer.
The winding, which takes electrical HYPERLINK "http://www.electrical4u.com/electric-powersingle-and-three-phase/" HYPERLINK "http://www.electrical4u.com/electric-power-single-andthree-phase/"power from the source, is generally known as primary winding of transformer. Here
in our above example it is first winding.
Transformer is made of following components:
Core
Winding
Tank
Bushing
Auxiliary equipment
Insulating oil
Cooling system
The winding, which gives the desired output voltage due to mutual induction in the
transformer, is commonly known as secondary winding of transformer. Here in our
example it is second winding.
The above mentioned form of transformer is theoretically possible but not practically, because in
open air very tiny portion of the flux of the first winding will link with second; so the current that
25
flows through the closed circuit of later, will be so small in amount that it will be difficult to
measure.
The rate of change of flux linkage depends upon the amount of linked flux with the second
winding. So, it is desired to be linked to almost all flux of primary winding to the secondary
winding. This is effectively and efficiently done by placing one low reluctance path common to
both of the winding. This low reluctance path is core of transformer, through which maximum
number of flux produced by the primary is passed through and linked with the secondary
winding. This is the most basic theory of transformer.
Magnetic Core of transformer - the magnetic flux produced by the primary winding,
that will pass through this low reluctance path linked with secondary winding and create
a closed magnetic circuit.
In kalisindh, there are various transformers for various purposes. They are:
Generating transformer(GT)
Unit transformer(UT)
Current transformer
Potential transformer
GENERATING TRANSFORMER(GT):In kalisindh thermal power plant 3 single phase generating transformer
installed for each phase in single unit. Output of generator has step up to 400KV by
generating
transformer.
In
kalisindh
power
plant
150/200/250MVA,
22.98/22KV,generating transformers are used.
UNIT TRANSFORMER(UT):-
26
UNIT AUXILIARY TRANSFORMER(UAT):Each unit has two unit auxiliary transformers. When the unit starts generating
electricity these transformer are energized and then supplies power to the auxiliaries.
Before starting of the, UAT bus is connected to the station bus. Auxiliaries of one unit
take about 20MW of power. UATis connected between the generator and the GT. A
tapping is taken from the power coming from the generator to the GT. UAT relieves GT
from extra load of about 20MW which is to be supplied to the auxiliaries via GT and ST
thus increasing the efficiency. It is step down transformer,which steps down the voltage
from 16.5 KV to 6.9 KV . The rating of UAT is 20 MVA. UAT bus supplies only those
auxiliaries, which are not necessary to be energized in case of sudden tripping of
generator.
UNIT SERVICE TRANSFORMER:It is also a 66 KV /415 V transformers which is used to supply the auxiliaries connected
to the the unit secondary switchgear bus.
UNIT STATION TRANSFORMER:It is a step down transformer ,which is connected to the station bus. It steps down the
voltage from 6.6 KV to .433 KV . it is used to supply the voltage au
27
CHAPTER-4
4.1 SWITCHYARD:The 400KV and 220KV switchyard have conventional two buses arrangement with a buscoupled breaker. Both the generator transformer and line feeder taking off from switchyard can
be taken to any of the two buses, similarly two station transformer can be fed from any two
buses. Each of these line feeders has been provided with bypass isolators connected across line
isolator and breaker isolator to facilitate the maintenance of line breaker. Each 400KV and
220KV lines have provision of local break up protection. All the breaker of the connected zone
and bus coupler, breaker will trip in event of fault in that zone.
Each of the two bus bars has one P.T. one for each phase connected to it. Potential transformer
are make in CROMPTON LTD. Each time line feeders has three no. cores for each phase
capacitor voltage transformer. For metering and protection are multicored single line phase, oil
filled, nitrogen sealed and are provided at rate of one per phase. Electrical equipment at 400KV
and 220KV system is as follows:
Circuit breaker
Isolator
Current transformer
Potential transformer
Lightning arrester
Earthing arrester
4.1(a) CIRCUIT BREAKER:A circuit breaker is a piece of equipment, which can make or break a circuit manually or by
remote control under normal condition. Break a circuit automatically under fault condition.
28
FIG-10 CIRCUIT BREAKER:4.1(b) ISOLATERS:It is essentially a knife switch and is designed to open a circuit under no loads. Its main purpose
is to isolate one portion of the circuit from the other and is not intended to be opened while
current is flowing in the line. Such switches are generally used on both sides of the circuit
breakers in order that repairs and replacement of circuit breakers can be made without any
danger. They should never be opened until the circuit breaker in the same circuit has been opened
and should always be closed before the circuit breaker is closed. It is also called no load breaker
4.1(c) LIGHTNING ARRESTER:An electrical discharge between cloud and earth is known as lightning.
29
A lightning arrester or a surge diverter is a protective device, which conducts the high voltage
surge on the power system to the ground.
4.1(d) EARTHING ISOLATORS:The term Earthlings means connecting of the non-current carrying parts equipment or the
neutral point of the supply system to the general mass of earth in such a manner that all times an
immediate discharge of electrical energy takes place without danger. An earthlings isolator is a
value of capacitance. This can be charged up to the voltage. Earthlings isolator is used to
discharge the line capacitance and work on it.
4.2 SWITCHGEAR:The apparatus used for switching, controlling and protecting the electrical circuits and
equipments are as known SWITCHGEAR.
Switchgear is one, which makes or breaks electric circuit.
The main components of switchgear are as follows:-
Bus-bars
Isolating switches
Current transformer
Potential transformer
Circuit breaker
Relays
BUS-BARS:Bus bars are defined as the conductor to which several incoming and outgoing lines are
connected. They are essentially component of switchgear. They are made up of cu and al.
the bus bars are enclosed in bus chamber. In kalisindh, thermal power plant two types of
indoor switchgear are used.
11KV and 3.3KV or high tension
3.415 Or low tension
CIRCUIT BREAKER:-
30
EARTHED SWITCHES:Earthed switches are connected between line conductor and earth. Normally
it is open when line is disconnected. The earthing switched is closed to discharge the
voltage trapped on line for high voltage and so the capacitor between line and earth is
charged to high voltage.
RELAYS:A relay is a device that detects the fault and initiates the operation of the circuit breaker
to isolate the defective element from the rest of the system.
31
CHAPTER-5
CONTROL ROOM PANEL:Various measurements can be taken at the control room simultaneously. The relays used in
kalisindh thermal power plant are as follows:FAN CONTROL DESK:Induced draft fan at full load.
Forced draft fan at full load.
Primary air fan at full load.
PRESSURE CONTROL DESK:Furnace pressure (5-10 mm hg)
Primary air header pressure (750-800 mm hg)
FUEL CONTROL DESK:Coal oil flow
Oil pressure
Temperature of mill
Flow of air
Drum level control, flow of steam water
Pressure of steam and water
Temperature of steam and water
TURBINE DESK:Pressure control, load mode control
Speed control
Ejector, control valves, stops valves and deviators.
GENERATOR CONTROL PANEL:Voltage, current, MVAR
Stator, rotor temperature
32
Stator cooling
CHAPTER-6
WATER TREATMENT PLANT:To protect boiler from corrosion water treatment is necessary.
WATER:
The purest available from water vapor in atmosphere as rain ,show or produced by melting or
ice.
This H2O reaching ground different type of gases from atmosphere like N2, and lesser extent
carbon dioxide.
Apart this H2o travels to various place and catches various organic matter suspended solid
(macro size sand, rite, slit etc.).
Colloidal micro size particles (0-100nm).
Dissolved forms alkaline salts, neutral salts and organic matter
Alkaline salts are mainly bicarbonates rarely carbonates and hydrates of Ca, Mg and Na
Neutral salts are sulphate chlorides, Nitrates of Ca, Mg and Na.
WATER CONDITIONING IN THERMAL POWER PLANTS FOR PROCESS AND BOILER
USE
Various water qualities inside thermal power plant
Cooling Water (BCW, ACW)
Boiler water
Consumptive water
H2O TREATMENT:
Pre-treatment of raw H2O
Filter H2O for softening and DM Plant
DM H2O for Boiler
H2O TREATMENT WHY?:
To avoid formation
33
To avoid corrosion
To control microbiological growth
The purpose of H2O treatment programmed is to provide real exchanger surface that are intact
and free of deposits, so that designed specification are met at KSTPS. Suspended and soluble
H2O impurities are removed with the help of PAC (Poly Aluminum Chloride) while treatment of
organic impurities are removed with the help of raw H2O and circulating cooling H2O is being
carried out with the help of liquid chlorine
CLARIFICATION:
Remove all types of solid and large particle sediments oil, natural organic matter, color etc.
Consist of four steps:
Coagulation-Flocculation
Screening
Sedimentation
Filtration
Medium screening (Spacing 10 40 mm)
Coarse screening (Spacing > 40 mm)
Coagulation Flocculation removes suspended solids and colloidal particles
Screening protect downstream units form, easily separable objects
ION EXCHANGE:
Resins-acidic/basic radicals with ions fixed on them, exchanged with ions present in H2O.
Theoretically removes 100% of salts, organics, viruses or bacteria.
2 types of resinsGel type (micro porous) micro porous or loosely cross-linked type
3 system of resign beds:
Strong acid cation + strong base anion.
Strong acid cation + weak base anion + strong base anion.
Mixed bed Deionization.
Ion exchange plant softens, removes heavy metals, and produces demineralised H2O.
Various cooling water system: WA
34
WBA:
When the functional group attached with a weak base it is called WBA resins. WBA performs
better at low pH and increased pH decreased its performance. When pH is more than 11, actually
regeneration takes place.
Operational capacity and regeneration efficiency of WBA is higher than SBA. WBA can only
react with strong acids.
PRINCIPLE OF DEIONISATION:
All impurities expect dissolved solids are removed in pre-treatment plant.
Only dissolved solids are removed in D.M. Plant.
Dissolved solids in water dissociates into ions (as water is polar solvent and it is dissolved in
electro-valet compound.
Positive charged ions are called cations and Negative charged ions are termed as anions.
In normal river water most common salts presented are calcium, magnesium and sodium salts,
associated with corresponding equivalent ions like Cl-, SO4- etc.
If above water passes through a cation exchanger, all cations are exchanged with H+ of cation
exchanger resins.
Similarly all cations are exchanged and retained by resins and ultimate product will be
corresponding acids. PH drops around 3.5 and it becomes soft.
The above water when passed through an anion exchanger, all anions exchanged with OH- of
SBA resins and equivalent of water is produced.
Similarly all acids are convertible to H2O. It appears that by passing water-containing salts
through a cation and anion exchange resins all-isolable salts can be removed.
36
CHAPTER-7
7.1 COAL HANDLING PLANT:Thermal power plant is based on steam produced on the expanse of heat energy produced on
combustion of fuel. Coal is categorized as follows depending upon fixed carbon, volatile matter
and moisture content:
Anthracite having 86% fixed carbon
Bituminous having 46 to 86% fixed carbon
Lignite having 30% fixed carbon and
Peat having 5 to 10% fixed carbon
Coal from mines is transported to CHP in railway wagons. It is unloaded in track hoppers.
Each project requires transportation of large quantity of coal mines to the power station site.
Each project is established near coal mine which meets the coal requirements for the span of its
entire operational life. For the purpose each plant has Merry Go-Round (MGR) rail
transportation system. The loading operation of the coal rake takes place while it is moving
under the silo at a present speed of 0.8 Km/hr. the loading time for each wagon is one minute.
For unloading of coal from the wagons, an underground track hopper is provided at the power
station.
The term coal handling plant means to store and to handle the coal, which is transported by
the train, and convey to the bunkers with the help of belt conveyers. Through the bunkers, coal is
transferred to the coal mill and drifted to the furnace. The coal handling plant includes wagon
tippler, conveyer belt, crusher house, and stacker & reclaimed, bunkers & coal mill.
COAL SUPPLY IN KaTPP-Ministry of coal, Govt. of India has allotted Paras east and Kanta
basin coal blocks to RVUN in Chhattisgarh state.
2.2 STAGES OF COAL HANDLING PLANT
WAGON TIPPLER-The term Wagon Tippler contains two words WAGON & TIPPLER
.Wagon means the compartment of train which is just like a container which is used to
carry the coal from mines to generating stations & the word Tippler means a machine,
which is used to unload the wagon into the hopper. Hopper is just like a vessel, which is
made of concrete, & it is covered with a thick iron net on its top. Here big size coal
pieces are hammered by the labors to dispose it into the hopper.
37
90 tonnes
Types of Tipplers
Angle of Tip
30 to35
Wire Ropes
Drive unit
Motor 37.3 KW
Operating Cycle
6 minutes
FEEDER- It is used to control the supply of crushed coal to the mill depending upon
load condition. It is installed under wagon tippler and hopper. In KaTPP there are 4
unbalanced Motor Vibrating Feeder installed in unit 1st.
Capacity
500 Tonnes/hr
Machine Weight
30 Tonnes(approx.)
500 Tonnes/hr
Rotor Speed
720 r.p.m
Motor
550 H.P
Volts
606 Kv
Phase
3 Phase motor
38
CONVEYORS-Conveyor belt is used to send the coal from coal storage yard and used to
send crushed coal from store to mill bunkers. The carrying capacity of conveyors belt is
750 tonnes/hrs that are installed in KaTPP.
Conveyor belt used in coal handling plant (CHP) are of 2 types
5 ply x1000 mm width with 5 mm rubber top side and 5 mm rubber bottom side.
Total thickness of belt:-17 to 18 mm
Power:-1000KN/m2
4 Ply x1000 mm width with 5mm rubber top side and 5 mm rubber bottom side.
Total thickness of belt:-17mm
Power:-800KN/m2
Cold joint are used in joining the conveyor, conveyor belts run with the help of electric
motor, gearbox, fluid coupling geared coupling are installed at head of all conveyors.
PARTS OF CONVEYORS:
under
coal
transfer
chutes
for
replacements
of
Skirt board and Skirt rubber-These are provided on tail end chutes to avoid
spillages of coal from Conveyors.
Stone picker-Stone picker pick the stones from the running belt manually.
R.T.I (Return Training Idler)-These idlers are provided on return side to guide the
conveyors.
39
Impact Idler-These Rubber idlers are provided under chutes through which coal falls
on conveyors.
BUNKERS-Bunkers are fabricated to store the coal before sending to coal mills. Coal is
fed in the bunkers with the help of tripper trolleys installed at 37 m height for unit 1 st and
2nd.These are 20 bunkers for unit 1st and 2nd.
Capacity of a bunker=500 tonne/bunker.
ASH HANDLING PLANT:The ash produced on the combustion of coal is collected by ESP. This ash is now required to
dispose off. This purpose of ash disposal is solved by Ash Handling Plant (AHP). There are
two types of ash handling process undertaken by AHP.
DRY ASH SYSTEM- Dry ash is required in cement factories as it can be directly added to
cement. Hence, the dry ash collected in the ESP hopper is directly disposed to silos using
pressure pumps. The dry ash from these silos is transported to the required destination.
ASH SLURRY SYSTEM- Ash from boiler is transported to ash dump areas by means of
sluicing type hydraulic system, which consists of two types of system
BOTTOM ASH SYSTEM- In this system, the ash slag discharged from the furnace is collected
in water-impounded scraper installed below bottom ash hopper. The ash collected is transported
to clinkers by chain conveyors. The clinker grinders churn ash, which is then mixed with water
to form slurry.
ASH WATER SYSTEM-In this system, the ash collected in ESP hopper is passed to flushing
system. Here low pressure water is applied through nozzle directing tangentially to the section of
pipe to create turbulence and proper mixing of ash with water to form slurry. Slurry formed in
above processes is transported to ash slurry sump. Here extra water is added to slurry if required
and then is pumped to the dump area.
FLY ASH SYSTEM-Even, though ESP is very efficient, there is still some ash, about 0.2%, left
in flue gases. It is disposed to the atmosphere along with flue gases through chimney.
40
CHAPTER-8
COOLING TOWER:It is a structure of height 202 m (tallest in the world) designed to cool the water (coming
from condenser) by natural draught. The cross sectional area is less at the centre just to create
low pressure so that ate air can lift up due to natural draught and can carry heat from spherical
drops. The upper portion is also diverging for increasing the efficiency of cooling tower. Hence,
it is named as natural draught cooling tower.
In KaTPP two natural draught cooling towers (2 NDCT) is present with height 202 m each
for each unit.
41
CHAPTER-9
EFFICIENCY:Efficiency is defined as the ratio of output to input. Efficiency of any thermal power plant can be
divided into four parts
Cycle Efficiency
Boiler Efficiency
Generator Efficiency
Turbine Efficiency
GENERATOR EFFICIENCY- Efficiency of generator is about 98% also its efficiency depends
upon:
Windage losses
TURBINE EFFICIENCY-It means the efficiency of steam turbine in converting the heat
energy made available in the cycle into actual mechanical work.
42
CHAPTER-10
CONCLUSION:This is my first practical training in which I learned lot of things and seen lot of huge machine
like Turbine, Boiler, Generator, cooling tower and many other things.
The architecture of the power plant, the way various units are linked and the way working
of whole plant is controlled make the student realize that engineering is not just learning the
structure description and working of various machine but the great part is of planning proper and
management.
I think training has essential for any student. It has allowed an opportunity to get an
exposure of the practical implementation to theoretical fundamentals.
43
REFERENCE
www.rvunl.com
www.googleindia.com
IEEE site
44