0% found this document useful (0 votes)
42 views1 page

Prometheus Engineering: Time Sheet

Khan worked on examining an article related to Appendix A of the RIDEM Surface Water Control Requirements Memo for 2 hours on October 19, 2015. He also spent 45 minutes discussing with other team members how to start work on Appendix A. The time sheet was signed by Khan and the project manager.

Uploaded by

Juan Villa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

Prometheus Engineering: Time Sheet

Khan worked on examining an article related to Appendix A of the RIDEM Surface Water Control Requirements Memo for 2 hours on October 19, 2015. He also spent 45 minutes discussing with other team members how to start work on Appendix A. The time sheet was signed by Khan and the project manager.

Uploaded by

Juan Villa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TIME SHEET

Prometheus Engineering
Name:
KhanSurface Water Control
Worked
on Zar-lusht
the RIDEM
Date: 10/19/2015
Requirements Memo
Task Description

Examined the article related to Appendix A.


Discussed with Soccer Field Site members, on how we will
start the Appendix A.

_________________________
Signature of Team Member

_________________________
Signature of Project Manager

2
hours
Time

45
minutes

You might also like