0% found this document useful (0 votes)
46 views1 page

Prometheus Engineering: Time Sheet

Juan Villa spent 1.5 hours meeting with a group to take professional pictures in front of Kirk Auditorium. He then spent 1 hour changing the layout of a posterboard to black and presented it to Dr. Thiem for suggestions, and is now waiting for Dr. Thiem's approval.

Uploaded by

Juan Villa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

Prometheus Engineering: Time Sheet

Juan Villa spent 1.5 hours meeting with a group to take professional pictures in front of Kirk Auditorium. He then spent 1 hour changing the layout of a posterboard to black and presented it to Dr. Thiem for suggestions, and is now waiting for Dr. Thiem's approval.

Uploaded by

Juan Villa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TIME SHEET

Prometheus Engineering
Juan Villa
Meet Name:
with group
to take professional pictures in front of
Date:
kirk auditorium

1.5 hours

Task Description

Changed the layout of the posterboard to black and


presented it to Dr. Thiem for suggestions. Waiting for
approval from Dr. Thiem

_________________________
Signature of Team Member

_________________________
Signature of Project Manager

Time

1 hour

You might also like