Bill of Engineering Measurement and Evaluation

The document outlines a bill of engineering measurement and evaluation for the conversion, upgrade, and reconciliation of critical engineering documents. It involves converting 203 PEFS documents, 6 CAUSE & EFFECT documents, and 7 DGMS documents to native formats, upgrading documents to comply with best practices, and technically splitting generic documents to individual train and system levels. The total estimated man-hours is 77,100 hours over 1 year at a rate of N1,788 per hour, for a total projected cost of N55,000 million or $367,000.

Uploaded by

adesloop
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
67% found this document useful (9 votes)
16K views1 page

Bill of Engineering Measurement and Evaluation

The document outlines a bill of engineering measurement and evaluation for the conversion, upgrade, and reconciliation of critical engineering documents. It involves converting 203 PEFS documents, 6 CAUSE & EFFECT documents, and 7 DGMS documents to native formats, upgrading documents to comply with best practices, and technically splitting generic documents to individual train and system levels. The total estimated man-hours is 77,100 hours over 1 year at a rate of N1,788 per hour, for a total projected cost of N55,000 million or $367,000.

Uploaded by

adesloop
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

BILL OF ENGINEERING MEASUREMENT AND EVALUATION

1.0

Descriptio
n of work
Conversion of
critical
documents to
native format
(AutoCAD, MS
Office
application, etc)

Work Scope
Document Type
PEFS
CAUSE & EFFECT
DGMS
PSFS
PSMR

No of
Document
203
6
7

Project Cost
Man-hrs
6,208

2.0

364
0
75

te

Upgrade
documents in
accordance with
best practices
(DEPs, BS, etc)
Reconcile
revisions, update
As-Built, ESP
PSSR etc.
Technically split
generic
documents to
individual LNG
trains and
systems

Rate/hr
Estima

N1,788 per
hour.
As per HR
MPC rate for
CAD Operatormax
(allowances,
overhead +
profit
inclusive)

3.0

Total man-hrs to go
Cost
N55,000m
($367,000)

77,100Man
hours

Total Cost for the


project

Duration=1
year

N1,788 x 30,840 hr
(40% of 77,100) =
N55,000 Million
($367,000)/yr