PM Induction Motor 444-Pm-01A (H) Chech & Rectify VRU-B PM Induction Motor 444-Pm-02A (H)

The work order daily report summarizes maintenance tasks for various crafts on 16-Nov-10. A total of 16 tasks were completed for UPELEC craft, 18 for UPINST, 10 for UPMECH, and 8 for other crafts. The report provides details of each task, including description, status (open or closed), and number of workers assigned. It notes tasks continued from the previous day in red font and new tasks for the day in black font.

Uploaded by

Wigig Wihandhita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

PM Induction Motor 444-Pm-01A (H) Chech & Rectify VRU-B PM Induction Motor 444-Pm-02A (H)

The work order daily report summarizes maintenance tasks for various crafts on 16-Nov-10. A total of 16 tasks were completed for UPELEC craft, 18 for UPINST, 10 for UPMECH, and 8 for other crafts. The report provides details of each task, including description, status (open or closed), and number of workers assigned. It notes tasks continued from the previous day in red font and new tasks for the day in black font.

Uploaded by

Wigig Wihandhita
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Work Order Daily Report

Date

16-Nov-10
Total WON

Craft

UPELEC

PM03

Description

Status

PM INDUCTION MOTOR 444-PM-01A (H)

PM02
Description

Clos

Rel

Clos

Rel

Status
Y

PM01
T

Description

Chech & rectify VRU-B

Termination cable for LPG Tie In

Clos

Rel

Clos Rel

Status

Y
Clos

T
Rel

Clos

Rel
1

PM INDUCTION MOTOR 444-PM-02A (H)

UPINST

UPMECH

PRESSURE TRANSMITTER CHECK (2Y)

TEMPERATURE TRANSMITTER CHECK (2Y)/381-TT-103

Chech & rectify VRU-B (check & reinstall intrumentation)

TEMPERATURE TRANSMITTER CHECK (2Y)/381-TT-113

482-FT-430A Deethanizer Reflux Flow

TEMPERATURE TRANSMITTER CHECK (2Y)/381-TT-123

445-FI-261 Fuel Gas to Hot Oil Heater

OVERHEAD CRANE MAINTENANCE (H)

SD Block Valve 137-PV-101A Gas/gas Excha

Install vacuum breaker at HiPo pckg MoC

CRUDE OIL METERING SKID (H)

Chech & rectify VRU-B (rotor repair : days,and compressor assembly :2days)
Fire Water LPGF Plant leaks, 451-SVP-019
151-P-02B leak in three point.#

SUM

16

18

10

Ket :
Red font Job yesterday and continued by today
Black fontJob by today

10

10