Work Order Daily Report
Date
16-Nov-10
Total WON
Craft
UPELEC
PM03
Description
Status
PM INDUCTION MOTOR 444-PM-01A (H)
PM02
Description
Clos
Rel
Clos
Rel
Status
Y
PM01
T
Description
Chech & rectify VRU-B
Termination cable for LPG Tie In
Clos
Rel
Clos Rel
Status
Y
Clos
T
Rel
Clos
Rel
1
PM INDUCTION MOTOR 444-PM-02A (H)
UPINST
UPMECH
PRESSURE TRANSMITTER CHECK (2Y)
TEMPERATURE TRANSMITTER CHECK (2Y)/381-TT-103
Chech & rectify VRU-B (check & reinstall intrumentation)
TEMPERATURE TRANSMITTER CHECK (2Y)/381-TT-113
482-FT-430A Deethanizer Reflux Flow
TEMPERATURE TRANSMITTER CHECK (2Y)/381-TT-123
445-FI-261 Fuel Gas to Hot Oil Heater
OVERHEAD CRANE MAINTENANCE (H)
SD Block Valve 137-PV-101A Gas/gas Excha
Install vacuum breaker at HiPo pckg MoC
CRUDE OIL METERING SKID (H)
Chech & rectify VRU-B (rotor repair : days,and compressor assembly :2days)
Fire Water LPGF Plant leaks, 451-SVP-019
151-P-02B leak in three point.#
SUM
16
18
10
Ket :
Red font Job yesterday and continued by today
Black fontJob by today
10
10