Bar Charts

The document provides a bar chart schedule for converting an infirmary to two rooms located at Ateneo in Quezon City. The schedule outlines 15 items of work to be completed over 15 days in July 2015. Item 1 involves fabricating and installing cabinets and sliding doors. Item 2 covers electrical works and lighting installation. Item 3 involves demolition and construction works for lavatories on the 2nd and 4th floors, including plumbing and restoration tasks. The schedule tracks the planned and actual completion dates for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views4 pages

Bar Charts

The document provides a bar chart schedule for converting an infirmary to two rooms located at Ateneo in Quezon City. The schedule outlines 15 items of work to be completed over 15 days in July 2015. Item 1 involves fabricating and installing cabinets and sliding doors. Item 2 covers electrical works and lighting installation. Item 3 involves demolition and construction works for lavatories on the 2nd and 4th floors, including plumbing and restoration tasks. The schedule tracks the planned and actual completion dates for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project:

Location:
Subject:

Item
1

CONVERSION TO INFIRMARY TO 2 ROOM


Ateneo, Quezon City
Bar Chart Schedule

PARTICULARS

Plan/ Actual1

Fabrication og Cabinet (2 units) (reuse materials f


2
3

Installation of sliding door (2 units) Complete w/ pai


Electrical works; Installation of Switches and lightin

P
A
P
A
P
A

4th Floor
Plastering of Pedestal
Painting of pedestal and above splashboard
Installation of faucet
Plumbing Works
Cleaning and Houling

Item
3

PARTICULARS
2nd Floor
Removal/ demolition of existing lavatory
Construction of pedestal and countertop
Installation of jet black granite

P
A
P
A
P
A
P
A
P
A

Plan/ Actual1
P
A
P
A
P
A

Installation of plumbing fittings and accesories


Restoration and painting works
Cleaning and Houling

P
A
P
A
P
A

NFIRMARY TO 2 ROOMS
ity
e

July 2015
7
8
9

10

11

12

13

14

15

July 2015
7
8
9

10

11

12

13

14

15

S
U
N
D
A
Y