Consulting Civil & Structural Engineers Thane - Mumbai: Design Peer Review Report (Structural) (Preliminary Report)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 32

ConsultingCivil&StructuralEngineers

ThaneMumbai

DESIGNPEERREVIEWREPORT(Structural)
(PreliminaryReport)

Project: Proposedresidential building No. 18, at VartakNagar,Thane(W)

Client: M/s.PURANIKBUILDERS

Rev.No.

Date

DetailsofRevision

Status

R1

02/02/2016

InterimReport

PreliminaryReport

R0

17/12/2015


CONTENTS

1.

Methodology

2.

ReferenceDrawings/Documents

3.

DesignData

4.

Observationsandfindings

5.

Conclusion

1. Methodology
Structural Analysis & design will be checked on the basis of Etabs model,
drawingsanddesigndatareceivedfromclientandrelevantIScodes.
The results will be compared with the supplied structural drawings. Design
adequacyforfoundation,columns,beams,slabswillbechecked.Also,design
willbereviewedfromoptimizationpointofview.

WereceivedtenderdrawingsalongwithDesignBasisReportandEtabsmodel
from Client. We submitted our preliminary report on 18/12/2015 with our
observations/comments marked for DBR & ETABS model which indicates
parameters considered for Earthquake & Wind were improper, thus design
submitted was inadequate. Based on our comments Structural Consultant
corrected the design and submitted the revised Etabs model along with
revisedstructuraldesignanddrawingon11/01/16.Thereviewofthesameis
follows:

2. ReferenceDrawings/Documents(Receivedfromclient)
i. ArchitecturalDrawingsbyM/s.DesignConsortiumArchitects(I).Pvt.Ltd.
ii. RevisedStructuraldrawingsissuedbyM/s.AjayMahale&Associates.
iii. RevisedStructuralDesignBasisreportbyM/s.AjayMahale&Associates.
Dated:08/01/2016
iv. RevisedEtabsmodelbyM/s.AjayMahale&Associates.
v. SafemodelbyM/s.AjayMahale&Associates.
vi. SoilInvestigationreportbyM/s.PareshConstructions&foundationsPvt.
Ltd.Chembur,Mumbai

(Listofstructuraldrawings)
Sr.
no.

Title

LatestDwg/ Rev.
no./Date

StructuralLayoutAtRaftFoundation&LiftShaftDetails

RC01/RA/08.01.16

ColumnSchedule&LinkArrangementDrawing

SH01/RA/08.01.16

ColumnSchedule&LinkArrangementDrawing

SH02/RA/08.01.16

StructurallayoutAtplinthlevel&RCCdetails

RC02/RA/08.01.16

StructurallayoutatTieBeamLevel&rccdetails(Below
GroundLevel)

RC02a/RA/08.01.16

StructurallayoutatTypicalfloor&rccdetails

RC03/RA/08.01.16

StructurallayoutatServicefloor&rccdetails

RC04/RA/08.01.16


3. DesignData:
DesignDataisconsideredaspertheStructuralDesignBasisReport(Dated:
08/01/2016)submittedbyM/s.AjayMahale&Associates.

i)TheStructureisaresidentialbuilding
TheBasicconfigurationisStilt+Amenityfloor+Servicefloor+26storied
building
BaseDimensionoftheBuilding:L(x)= 33.88 m
L(y)= 9.73 m
HeightoftheBuilding:H= 85.3 m
AspectRatio=85.3/9.73=8.766

ii)Thefloorht.forvariousfloorsisasfollows
Groundfloor(partarea)=3.95m
Groundfloor(partarea)=6.85m
Amenityfloor=2.9m
Servicefloor=2.9m
st
th
1 to26 Typicalfloor=2.9m

iii)TheStructuralsystemforthisbldg.isRCCBeamSlabconstructionwith
columnsandshearwalls.

iv)Material
GradeofConcreteforRCCworkisasfollows:
M30ForRaftFoundation
M40ForColumns&LiftWallsupto12thfloor
M40ForColumns&LiftWallsabove12thfloor
M30forBeams&slabs
GradeofReinforcementsteel=Fe500

v)DesignLoads:
DeadLoads(DL)
Material
Density
2500 kg /cu.m.
Concrete
2000 kg/ cu.m.
BrickWalls

Material
Loadintensity
FloorFinish(Amenity&servicefloor) 200 kg/ Sq.m.
FloorFinish(Typicalfloor)
100 kg/Sq.m
BrickbatW/PinToilets(200thk) 400 kg/ Sq.m.
4

BrickbatW/PonTerrace(250 thk) 500 kg/ Sq.m.

Walls:
ExternalWalls
150Thk.(Brickwalls)
InternalWalls
150Thk.(Brickwalls)

LiveLoads(LL)
300 kg/ sq.m.
Amenity&servicefloor
200 kg/ sq.m.
Typicalfloor
300 kg/ sq.m.
Staircase,passage,balconies
200 kg/ sq.m.
Terracefloor
1000 kg/ sq.m.
LMRBottomslab

SeismicDesignParameters
SeismiczonerecommendedforThaneZoneIII.
SeismicZonefactor(Z)=0.16
ImportanceFactor(I)=1
ResponseReductionFactor(R)=4
FrameType=Withinfillpanels
LateralloadresistingsystemDuctileshearwalls

WindDesignParameters
BasicWindSpeed=44Sm/sec(ForThane)
K1:ProbabilityFactor1.0
K2:TerrainFactor(Category3/ClassC)
K3:TopographyFactor1.0
WindanalysiswithGustFactoriscarriedout

vi)LoadCases&LoadCombinations
Abbreviationusedforloadcases:
DL=DeadLoad
LL=LiveLoad
EQx=SeismicLoadintheXdirection
EQy=SeismicLoadintheYdirection
Spec=Responsespectrumcase
WLx=WindLoadintheXdirection
WLy=WindLoadintheYdirection

Thestructurehasbeencheckedforthefollowingloadcombinations:
1.
1.5DL+1.5LL
2.
1.5DL+1.5EQx
3.
1.5DL1.5EQx
4.
1.5DL+1.5EQy
5.
1.5DL1.5EQy
6.
1.2DL+1.2LL+1.2EQx
7.
1.2DL+1.2LL1.2EQx
8.
1.2DL+1.2LL+1.2EQy
9.
1.2DL+1.2LL1.2EQy
10.
0.9DL+1.5EQx
11.
0.9DL1.5EQx
12.
0.9DL+1.5EQy
13.
0.9DL1.5EQy
14.
1.5DL+1.5WLx
15.
1.5DL1.5WLx
16.
1.5DL+1.5WLy
17.
1.5DL1.5WLy
18.
1.2DL+1.2LL+1.2WLx
19.
1.2DL+1.2LL1.2WLx
20.
1.2DL+1.2LL+1.2WLy
21.
1.2DL+1.2LL1.2WLy
22.
0.9DL+1.5WLx
23.
0.9DL1.5WLx
24.
0.9DL+1.5WLy
25.
0.9DL1.5WLy
26.
1.5DL+1.5SPEC(xdir)
27.
1.2DL+1.2LL+1.2SPEC(xdir)
28.
0.9DL+1.5SPEC(xdir)
29.
1.5DL+1.5SPEC(ydir)
30.
1.2DL+1.2LL+1.2SPEC(ydir)
31.
0.9DL+1.5SPEC(ydir)


DesignCodesofPracticeandStandards
The following is the list of IS codes that will be referred while designing
thestructure:
CodeNo.
Description
IS875Part1:1987
Code of practice for design loads(Otherthan
Buildings and Structures

IS875Part2:1987

Part 1: Dead Loads


Code of practice for design loads(Otherthan
) Structures
Buildings and

IS875Part3:1987

Part 2: Imposed Loads


Code of practice for design loads(Otherthan
) Structures
Buildings and

Part 3: Wind Loads


Plain and Reinforced Concrete CodeofPractice
Criteria for Earthquake ResistantDesignofStructures
Earthquake Resistant Design and construction of
Code of Practice
Ductile detailing of Reinforced Concrete Structures
to seismic forces Code of Practice

IS456:2000
IS1893:2002
IS4326:1993

IS13920:1993
(Edition1.2)
IS3370:1967

Code of practice for concrete structuresfor the


liquids
ExplanatoryHandbook onCodesforEarthquake
Engineering

SP:22

4. Observations&Findings&replyfromM/sAjayMahale&Associatesonthe
reportsubmittedon18/12/15:
i. DesignBasisReport
1)Totalheightofbuildingismentionedas39m&sameshallbecorrectedas
85.3m.
Compliance:ItismentionedinrevisedDBRas(85.3mt).StatusClosed

2)TheMaximumAspectratioisinYdirectioni.e8.61&tobementionedin
DBR.
Compliance:ItismentioninrevisedDBRas(aspectratioinydirection
thatis8.766).StatusClosed

3)ThelateralloadresistingsystemisconsideredasSpecial(Ductile)RC
Frameswithductileshearwalls.But,thereareveryfewcontinuousRC
FramesinXdirection.Hencethelateralloadresistingsystemwillbeductile
shearwallsonly.UndersuchcasetheRvalueshallbeconsideredas4.
Compliance:ItismentioninrevisedDBRasRvalue=4andappliedin
7

ETABmodel.StatusClosed

4)DLforfloorfinishhasbeenconsideredas1.25KN/Sq.m&thesamecan
beloweredas1KN/Sq.m.
Compliance:ItiscorrectedinrevisedDBRaswellasETABmodel.DLfor
floorfinishas1KN/m2.StatusClosed

5)LiveloadforStaircases,commonareapassages,balconies&Refugearea
needstobementionedinDBR.
Compliance:ItiswritteninDBRaswellasusedinETABmodel.Status
Closed

6)Location&capacityofwatertankneedstobementionedinDBR.
Compliance:ItismentioninrevisedDBR.StatusClosed

7)UnderWindloadparameterstheTerraincategoryismentionedas4&
whichistobeconsideredas3asperthelocationofbuilding.
Compliance:ItiscorrectedinrevisedDBRasterraincategoryisconsidered
as3asperthelocationofbuilding.StatusClosed

8)UnderWindloadparameterstheStructuralclassismentionedasB&
whichistobeconsideredasCasbuildingheightismorethan50m.
Compliance:ItiscorrectedinrevisedDBR,structuralclassconsideredas
C.StatusClosed

9)Forcecoefficientisrequiredtobespecified.Gustanalysisisrequired.
Compliance:Gustanalysisisdone.AnditisappliedinETabsmodel
(revised).GustcalculationisattachedwithDBR.StatusClosed

10)LoadcasesforspectraanalysisneedstobementionedinDBR.
Compliance:ItismentionedinrevisedDBR.StatusClosed

11)Lateraldeflectionvalues(underwind&Quakeloads)mentionedinDBR
appearstobeverylow.Pleasecheckthesame&correctinDBR.
Compliance:ItismentionedandcorrectedinrevisedDBRStatus
Closed

12)UnderListofIScodes,forDuctiledetailingIS13920:1995ismentioned
&sameshallbecorrectedasIS13920:1993Edition1.2
Compliance:ItiscorrectedinandmentionedASI3920:1993Edition1.2.
StatusClosed
8

13)Durabilitycriteriaisrequiredtobespecified.
Compliance:ItisspecifiedinrevisedDBR6(H).StatusClosed

14)NominalcoverforvariousRCCelementsneedtobespecified
consideringdurabilityandfireratingcriteria.
Compliance:ItisspecifiedinrevisedDBR6(I),6(J).StatusClosed

15)ConcreteGradeforcolumns/shearwallsismentionedasM40forallthe
floors&sameshallbereducedatupperlevelasperthedesignrequirement.
Compliance:ItismentioninrevisedDBR6(L).

New Comment: 16) Considering the 8m excavation depth, proper shoring


system such as shore piles shall be provided to avoid the collapse of
excavatedsoil&alsototakecareofadjoiningstructuresifany.Alternatively
optionofpilefoundationshallbeexplored.

ii. StructuralAnalysis(Etabsmodel)
1)RCCwallsLW2,LW5&LW6(asshowninstructurallayout)arenotmodeled
inEtabs.
Compliance:RCCwallsLw2,Lw5,Lw6.Aremodeledinrevisedanalysis.
StatusClosed

2)Typicalfloorlevelpergolas(asshowninstructurallayout)arenotmodeled
inEtabs.
Compliance:pergolabeamsisaddedinetabsmodel(revised).Status
Closed

3)Belowgroundcolumnsizesassignedinmodelarenotmatchingwith
columnschedule.
Compliance:Revisedcolumnsschedulesaresubmitted.StatusClosed

4)ConcretegradeisassignedasM40forSlabs,Beams&Columnsforallthe
floors&sameshallbereducedatupperlevel&tobeassignedaccordingly.
Compliance:concretegradeisassignedinrevisedmodel.Baseto12th
floorM:40columnsandliftwall13thfloortoterrace=M:3013thfloorto
terrace=M:30.StatusClosed

5)Liveloadinstaircase&commonareapassagesisassignedas2KN/Sq.m&
sameshallbecorrectedas3KN/Sq.m.
Compliance:Liveloadinstaircaseandcommonareaisassigned3KN/m2
9

inrevisedmodel.StatusClosed

6)UnderEarthquakeloadparametersthesoiltypeisassignedas2&sameto
beconsideredas1(referIS1893Fig2)asthefoundingstrataisRockasper
theGeotechreport.
Compliance:Soiltype=1itiscorrectedinrevisedmodel&revisedDBR.
StatusClosed

7)TheEarthquake&Windloadparametersneedstobecorrectedasperthe
commentsprovidedonDBR.
Compliance:ItiscorrectedinDBR.StatusClosed

8)Slabdiaphragmconsideredassemirigidinsteadofrigidwhichisnot
correct.
Compliance:Slabdiaphragmconsiderasrigidinrevisedmodel.
StatusClosed

9)Softstoryformationneedstobecheckedatstiltfloor&structuralelements
tobeanalyzed&designedaccordingly.
Compliance:Itisfoundthatstiltfloorisnotasoftstory.Asitsstiffnessis
greaterthan70%ofstiffnessofaboveoneflooralso.Itsstiffnessis
greaterthan80%ofaveragestiffnessabovethreelevels.StatusClosed

NewComment:FormationofsoftstoreyatStiltfloorisconfirmed.Stilt
floorcolumnstobedesignedforsoftstoreyeffect.

10)Panalysisneedstobecarriedoutforassessmentofsecondarystresses.
Compliance:PappliedinrevisedEtabsmodel.StatusClosed

11)Asthebuildingheightis90m&aspectratiois8.61(i.emorethan5)the
structureshallbeanalyzedconsideringtheGustFactors(ReferIS875/part
3/clause7.0/page47)
Compliance:gustfactorisappliedtothestructureandnecessaryload
calculationsareprepared.StatusClosed

12)AsperGeotechreportthefoundingstrataisat8.0mbelowexisting
groundlevel.Undersuchcaseintermediatetiebeamstobeprovidedfor
belowgroundcolumnstoreducetheslendernesseffect&sameshallbe
modeledinEtabs.
Compliance:IntermediatetiebeamprovidedbelowGLat3mtfrombase
rafttopanditismodeledinEtabs.StatusClosed
10

13)SafeanalysisfileofRaftfoundationisnotsubmitted.Itisrequiredto
checkthedesignofsame.
Compliance:Safeanalysisfileforraftfoundationissubmittedwithrevised
Etabsmodel.StatusClosed

NewComments:

5. StructuralAdequacyCheck:
a.Foundation:Safeanalysisfileforraftfoundationissubmitted&designischecked
accordingly.Itisobservedthatatfewlocationsreinforcementprovidedis
inadequate.(ReferAnnexure1&2)
b.Columns,Shearwalls&Liftwalls:
i.

Columndesignforstiltfloorneedstobecheckedforsoftstoreyeffectand
revisedaccordingly.

ii.

Columnlinkarrangementisnotshownindrawing&needstobeprovided.

iii.

Columnlinksspecialconfiningreinforcementrequiredforfullheightof
columnsforstiltfloor.

iv.

Reinforcementprovidedforfewcolumnsat1stTypicalfloor&topflooris
foundinadequate.(ReferAnnexure3)Thesametobeincreased.

v.

Forfewcolumnsthereinforcementprovidedforcolumnsismorethan
required(ReferAnnexure3).Thesametobereduced.

vi.

Liftwallreinforcementisprovidedsameforallfloors.Thesameshallbe
reducedasperdesignrequirement.

c.TieBeams(BelowGroundFloor)
i.

BeamsizementionedinlayoutforTB23,24,31,32&33isnotmatchingwith
schedule.

ii.

TopsteelprovidedoverEndSupportisinadequateforTB19,25,26,30,33&
sameshallbeincreased.

iii.

Forrestofthebeamsreinforcementprovidedisadequate.

11


d.PlinthBeams
i.

Reinforcementprovidedforplinthbeamisadequate.

ii.

BeamsizementionedinlayoutforPB15isnotmatchingwithschedule.

iii.

DetailofPB15ismissing.

e.Servicefloorlevelbeams
i.

TopsteelprovidedoverEndSupportisinadequateforB6&8&sametobe
increased.

ii.

Bottom&TopsteelprovidedisinadequateforB24&sametobeincreased.

iii.

DetailsofBeamsB10,14&15ismissing.

iv.

Forrestofthebeamsreinforcementprovidedisadequate.

f.Typicalfloorlevelbeams
i.

TopbarsprovidedforallNonframingbeamismorethanrequired&tobe
reduced.

ii.

Stirrups2(i.einthemiddlezoneofbeam)providedformostofthebeams
ismorethanrequired&sametobereduced.

iii.

ForB10,topsteelovermidsupportismissing&sametobeprovided.

iv.

TopsteelprovidedoverEndSupportisinadequateforB26,27,30,49&
sametobeincreased.

v.

BottomsteelforB40&50canberestrictedto2Y16instead(2Y16+2Y12)
provided.

vi.

Top&BottomsteelprovidedforB59canberestrictedto(2+2Y25)
insteadof(3+3Y25)provided.

g.Floorslabs
i.

Slabdesign(thicknessandsteel)foundtobeadequate.

12

6. Conclusion:
a. StructuralConsultantshallreviewabovementionedcommentsandrevert.
b. Design inadequacy indicated in this report including for the soft storey shall
becorrected.
c. Reductioninreinforcementsteelforcolumnsandbeamsispossiblethrough
designoptimization(ReferAnnexure3forcomparativestatement)

7. Remark:
The scope of this assignment is limited only to overview structural design &
drawings submitted to us. It does not absolve the Principal Structural
Consultantfromhisroleandresponsibility.

Preparedby

ManishWadikar
(Asst.ManagerDesign)

13

ANNEXURE - 1

ANNEXURE - 2

ANNEXURE 3
SIZE

SW1
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

500 1800

16

32

14

25

GROUND FLOOR

500 1800

16

32

14

SERVICE FLOOR

500 1800

16

32

AMENITY FLOOR

500 1800

16

1ST

380 1800

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

19736

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

2.19

25

19724
CHECK
FOR SOFT
19736 STOREY

2.19 Ok
CHECK
FOR SOFT
2.19 STOREY

14

25

19736

18900

2.19

2.10 Ok

32

14

25

19736

18900

2.19

2.10 Ok

18

32

25

17417

16861

2.55

2.47 Ok

350 1530

18

32

25

17417

16600

3.25

3.10 Ok

3RD

350 1530

32

18

25

13660

13923

2.55

2.60 Inadequate

4TH

350 1530

18

25

20

10720

11781

2.00

2.20 Inadequate

5TH

350 1530

25

20

20

8243

9639

1.54

1.80 Inadequate

6TH

350 1530

10

20

14

16

5954

7497

1.11

1.40 Inadequate

7TH

350 1530

14

16

10

12

3944

5355

0.74

1.00 Inadequate

8TH

350 1530

14

16

10

12

3944

3213

0.74

0.60 Ok

9TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

10TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

11TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

12TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

13TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

14TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

15TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

16TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

17TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

18TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

19TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

20TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

21ST

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

22ND

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

23RD

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

24TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

25TH

350 1530

14

16

10

12

3944

1339

0.74

0.25 Excess

26TH

350 1530

14

16

10

12

3944

2678

0.74

0.50 Ok

ANNEXURE 3
SW2,3

SIZE
B

TOTAL
REINF.
PROV

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

400 1800

28

20

GROUND FLOOR

400 1800

28

20

SERVICE FLOOR

400 1800

28

20

AMENITY FLOOR

400 1800

28

1ST

300 1800

2ND

TOTAL
REINF.
REQ.

8792

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.22

6000
CHECK FOR
SOFT
8792 STOREY

0.83 Ok
CHECK
FOR SOFT
1.22 STOREY

8792

8640

1.22

1.20 Ok

20

8792

8640

1.22

1.20 Ok

26

20

8164

8100

1.51

1.50 Ok

300 1800

26

20

8164

6480

1.51

1.20 Ok

3RD

300 1800

26

20

8164

5400

1.51

1.00 Ok

4TH

300 1800

26

20

8164

3780

1.51

0.70 Ok

5TH

300 1800

26

20

8164

2160

1.51

0.40 Excess

6TH

300 1800

26

20

8164

1350

1.51

0.25 Excess

7TH

300 1800

26

20

8164

1350

1.51

0.25 Excess

8TH

300 1800

26

20

8164

1350

1.51

0.25 Excess

9TH

300 1800

26

20

8164

1350

1.51

0.25 Excess

10TH

300 1800

26

16

5226

1350

0.97

0.25 Excess

11TH

300 1800

26

16

5226

1350

0.97

0.25 Excess

12TH

300 1800

26

16

5226

1350

0.97

0.25 Excess

13TH

300 1800

26

16

5226

1350

0.97

0.25 Excess

14TH

300 1800

26

16

5226

1350

0.97

0.25 Excess

15TH

300 1800

26

16

5226

1350

0.97

0.25 Excess

16TH

300 1800

26

16

5226

1350

0.97

0.25 Excess

17TH

300 1800

14

16

12

16

5226

1350

0.97

0.25 Excess

18TH

300 1800

14

16

12

16

5226

1350

0.97

0.25 Excess

19TH

300 1800

14

16

12

16

5226

1350

0.97

0.25 Excess

20TH

300 1800

14

16

12

16

5226

1350

0.97

0.25 Excess

21ST

300 1800

14

16

12

16

5226

1350

0.97

0.25 Excess

22ND

300 1800

14

16

12

16

5226

1350

0.97

0.25 Excess

23RD

300 1800

14

16

12

16

5226

1350

0.97

0.25 Excess

24TH

300 1800

14

16

12

16

5226

1350

0.97

0.25 Excess

25TH

300 1800

14

16

12

16

5226

1350

0.97

0.25 Excess

26TH

300 1800

14

16

12

16

5226

2160

0.97

0.40 Excess

ANNEXURE 3

SW4

SIZE
B

TOTAL
REINF.
PROV

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

400 3650

28

20

26

16

GROUND FLOOR

400 3650

28

20

26

SERVICE FLOOR

400 3650

28

20

AMENITY FLOOR

400 3650

28

1ST

250 3650

2ND

TOTAL
REINF.
REQ.

14018

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

0.96

16

8172
CHECK
FOR SOFT
14018 STOREY

0.56 Excess
CHECK
FOR SOFT
0.96 STOREY

26

16

14018

8172

0.96

0.56 Excess

20

26

16

14018

8172

0.96

0.56 Excess

24

20

26

16

12762

16425

1.40

1.80 Inadequate

250 3650

24

20

26

16

12762

13688

1.40

1.50 Inadequate

3RD

250 3650

20

20

30

16

12310

10950

1.35

1.20 Ok

4TH

250 3650

12

20

38

16

11406

8212

1.25

0.90 Ok

5TH

250 3650

20

46

16

10502

6388

1.15

0.70 Excess

6TH

250 3650

50

16

10050

3650

1.10

0.40 Excess

7TH

250 3650

24

16

26

12

7762

2738

0.85

0.30 Excess

8TH

250 3650

24

16

26

12

7762

2282

0.85

0.25 Excess

9TH

250 3650

24

16

26

12

7762

2282

0.85

0.25 Excess

10TH

250 3650

24

16

26

12

7762

2282

0.85

0.25 Excess

11TH

250 3650

24

16

26

12

7762

2282

0.85

0.25 Excess

12TH

250 3650

24

16

26

12

7762

2282

0.85

0.25 Excess

13TH

250 3650

24

16

26

12

7762

2282

0.85

0.25 Excess

14TH

250 3650

24

16

26

12

7762

3650

0.85

0.40 Excess

15TH

250 3650

24

16

26

12

7762

4562

0.85

0.50 Excess

16TH

250 3650

24

16

26

12

7762

5475

0.85

0.60 Ok

17TH

250 3650

24

16

26

12

7762

5475

0.85

0.60 Ok

18TH

250 3650

24

16

26

12

7762

5475

0.85

0.60 Ok

19TH

250 3650

24

16

26

12

7762

6388

0.85

0.70 Ok

20TH

250 3650

24

16

26

12

7762

6388

0.85

0.70 Ok

21ST

250 3650

24

16

26

12

7762

7300

0.85

0.80 Ok

22ND

250 3650

24

16

26

12

7762

8212

0.85

0.90 Inadequate

23RD

250 3650

24

16

26

12

7762

9125

0.85

1.00 Inadequate

24TH

250 3650

24

16

26

12

7762

10038

0.85

1.10 Inadequate

25TH

250 3650

24

16

26

12

7762

10038

0.85

1.10 Inadequate

26TH

250 3650

24

16

26

12

7762

11862

0.85

1.30 Inadequate

ANNEXURE 3

SW5

SIZE
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

400 3750

56

25

16

GROUND FLOOR

400 3750

56

25

SERVICE FLOOR

400 3750

56

25

AMENITY FLOOR

400 3750

56

1ST

250 3750

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

27489

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.83

16

12000
CHECK
FOR SOFT
27489 STOREY

0.80 Excess
CHECK
FOR SOFT
1.83 STOREY

16

27489

15000

1.83

1.00 Excess

25

16

27489

15000

1.83

1.00 Excess

52

25

16

25525

24375

2.72

2.60 Ok

250 3750

52

25

16

25525

20625

2.72

2.20 Ok

3RD

250 3750

32

25

20

20

21988

16875

2.35

1.80 Ok

4TH

250 3750

12

25

40

20

18450

14062

1.97

1.50 Ok

5TH

250 3750

12

25

40

20

18450

11250

1.97

1.20 Excess

6TH

250 3750

40

20

12

16

14972

7500

1.60

0.80 Excess

7TH

250 3750

20

44

16

11356

4688

1.21

0.50 Excess

8TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

9TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

10TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

11TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

12TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

13TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

14TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

15TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

16TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

17TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

18TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

19TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

20TH

250 3750

24

16

28

12

7988

2344

0.85

0.25 Excess

21ST

250 3750

24

16

28

12

7988

3750

0.85

0.40 Excess

22ND

250 3750

24

16

28

12

7988

3750

0.85

0.40 Excess

23RD

250 3750

24

16

28

12

7988

3750

0.85

0.40 Excess

24TH

250 3750

24

16

28

12

7988

4688

0.85

0.50 Excess

25TH

250 3750

24

16

28

12

7988

5625

0.85

0.60 Excess

26TH

250 3750

24

16

28

12

7988

8438

0.85

0.90 Inadequate

ANNEXURE 3

SW6

SIZE
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

450 2550

32

32

25

GROUND FLOOR

450 2550

32

32

SERVICE FLOOR

450 2550

32

AMENITY FLOOR

450 2550

1ST

300 2550

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

22140

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.93

25

17212
CHECK
FOR SOFT
22140 STOREY

1.50 Excess
CHECK
FOR SOFT
1.93 STOREY

32

25

22140

17212

1.93

1.50 Excess

32

32

25

22140

17212

1.93

1.50 Excess

32

32

25

22140

23715

2.89

3.10 Inadequate

300 2550

38

25

16

18653

21420

2.44

2.80 Inadequate

3RD

300 2550

14

25

24

20

14408

18360

1.88

2.40 Inadequate

4TH

300 2550

38

20

20

11932

16065

1.56

2.10 Inadequate

5TH

300 2550

38

20

20

11932

13005

1.56

1.70 Inadequate

6TH

300 2550

38

20

16

11932

10710

1.56

1.40 Ok

7TH

300 2550

38

20

16

11932

7650

1.56

1.00 Excess

8TH

300 2550

14

20

24

16

9220

5355

1.21

0.70 Excess

9TH

300 2550

26

16

12

12

6582

2295

0.86

0.30 Excess

10TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

11TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

12TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

13TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

14TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

15TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

16TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

17TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

18TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

19TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

20TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

21ST

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

22ND

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

23RD

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

24TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

25TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

26TH

300 2550

26

16

12

12

6582

1915

0.86

0.25 Excess

ANNEXURE 3
SW7

SIZE
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

450 4130

48

25

12

20

GROUND FLOOR

450 4130

48

25

12

SERVICE FLOOR

450 4130

48

25

AMENITY FLOOR

450 4130

48

1ST

250 4130

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

27330

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.47

20

4650
CHECK
FOR SOFT
27330 STOREY

0.25 Excess
CHECK
FOR SOFT
1.47 STOREY

12

20

27330

4650

1.47

0.25 Excess

25

12

20

27330

4650

1.47

0.25 Excess

44

25

12

20

25366

23123

2.46

2.24 Ok

250 4130

20

25

36

20

21121

15488

2.05

1.50 Excess

3RD

250 4130

56

20

20

17584

12390

1.70

1.20 Excess

4TH

250 4130

24

20

32

16

13968

9292

1.35

0.90 Excess

5TH

250 4130

44

16

12

12

10200

6195

0.99

0.60 Excess

6TH

250 4130

44

16

12

12

10200

3098

0.99

0.30 Excess

7TH

250 4130

32

16

24

12

9144

2582

0.89

0.25 Excess

8TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

9TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

10TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

11TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

12TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

13TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

14TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

15TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

16TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

17TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

18TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

19TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

20TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

21ST

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

22ND

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

23RD

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

24TH

250 4130

28

16

24

12

8340

2582

0.81

0.25 Excess

25TH

250 4130

28

16

24

12

8340

4130

0.81

0.40 Excess

26TH

250 4130

28

16

24

12

8340

6195

0.81

0.60 Excess

ANNEXURE 3
SIZE

SW8
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

450 3000

28

25

18

20

GROUND FLOOR

450 3000

28

25

18

SERVICE FLOOR

450 3000

28

25

AMENITY FLOOR

450 3000

28

1ST

300 2800

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

19396

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.44

20

10800
CHECK
FOR SOFT
19396 STOREY

0.80 Excess
CHECK
FOR SOFT
1.44 STOREY

18

20

19396

5400

1.44

0.40 Excess

25

18

20

19396

5400

1.44

0.40 Excess

26

25

14

20

17159

21000

2.04

2.50 Inadequate

300 2800

10

25

30

20

14329

17640

1.71

2.10 Inadequate

3RD

300 2800

30

20

10

16

11430

15120

1.36

1.80 Inadequate

4TH

300 2800

10

20

30

16

9170

12600

1.09

1.50 Inadequate

5TH

300 2800

22

16

18

12

6456

10080

0.77

1.20 Inadequate

6TH

300 2800

22

16

18

12

6456

7560

0.77

0.90 Inadequate

7TH

300 2800

22

16

18

12

6456

5040

0.77

0.60 Ok

8TH

300 2800

22

16

18

12

6456

2520

0.77

0.30 Excess

9TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

10TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

11TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

12TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

13TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

14TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

15TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

16TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

17TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

18TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

19TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

20TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

21ST

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

22ND

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

23RD

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

24TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

25TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

26TH

300 2800

22

16

18

12

6456

2520

0.77

0.30 Excess

ANNEXURE 3

SIZE

SW9
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

400 4500

16

20

52

16

GROUND FLOOR

400 4500

16

20

52

SERVICE FLOOR

400 4500

16

20

AMENITY FLOOR

400 4500

16

1ST

300 4500

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

15476

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

0.86

16

4500
CHECK
FOR SOFT
15476 STOREY

0.25 Excess
CHECK
FOR SOFT
0.86 STOREY

52

16

15476

4500

0.86

0.25 Excess

20

52

16

15476

4500

0.86

0.25 Excess

30

16

34

12

9872

3375

0.25 Excess

300 4500

30

16

34

12

9872

3375

0.25 Excess

3RD

300 4500

30

16

34

12

9872

3375

0.25 Excess

4TH

300 4500

30

16

34

12

9872

3375

0.25 Excess

5TH

300 4500

30

16

34

12

9872

3375

0.25 Excess

6TH

300 4500

30

16

34

12

9872

3375

0.25 Excess

7TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

8TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

9TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

10TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

11TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

12TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

13TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

14TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

15TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

16TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

17TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

18TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

19TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

20TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

21ST

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

22ND

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

23RD

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

24TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

25TH

300 4500

30

16

34

12

9872

3375

0.73

0.25 Excess

26TH

300 4500

30

16

34

12

9872

4050

0.73

0.30 Excess

ANNEXURE 3
SIZE

SW10
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

450 3200

40

20

16

16

GROUND FLOOR

450 3200

40

20

16

SERVICE FLOOR

450 3200

40

20

AMENITY FLOOR

450 3200

40

1ST

250 3200

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

15776

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.10

16

3600
CHECK
FOR SOFT
15776 STOREY

0.25 Excess
CHECK
FOR SOFT
1.10 STOREY

16

16

15776

3600

1.10

0.25 Excess

20

16

16

15776

3600

1.10

0.25 Excess

36

20

16

16

14520

15200

1.82

1.90 Inadequate

250 3200

20

48

16

10904

10400

1.36

1.30 Ok

3RD

250 3200

52

16

12

10452

8000

1.31

1.00 Ok

4TH

250 3200

24

16

28

12

7988

4800

1.00

0.60 Excess

5TH

250 3200

24

16

28

12

7988

2400

1.00

0.30 Excess

6TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

7TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

8TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

9TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

10TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

11TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

12TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

13TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

14TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

15TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

16TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

17TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

18TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

19TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

20TH

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

21ST

250 3200

24

16

28

12

7988

2000

1.00

0.25 Excess

22ND

250 3200

24

16

28

12

7988

3200

1.00

0.40 Excess

23RD

250 3200

24

16

28

12

7988

3200

1.00

0.40 Excess

24TH

250 3200

24

16

28

12

7988

4000

1.00

0.50 Excess

25TH

250 3200

24

16

28

12

7988

4800

1.00

0.60 Excess

26TH

250 3200

24

16

28

12

7988

6400

1.00

0.80 Excess

ANNEXURE 3
SIZE

SW11
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

450 2850

20

25

24

20

GROUND FLOOR

450 2850

20

25

24

SERVICE FLOOR

450 2850

20

25

AMENITY FLOOR

450 2850

20

1ST

250 2850

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

17353

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.35

20

3200
CHECK
FOR SOFT
17353 STOREY

0.25 Excess
CHECK
FOR SOFT
1.35 STOREY

24

20

17353

3200

1.35

0.25 Excess

25

24

20

17353

3200

1.35

0.25 Excess

16

25

24

20

15390

14250

2.16

2.00 Ok

250 2850

25

36

20

13267

11400

1.86

1.60 Ok

3RD

250 2850

24

20

16

16

10752

9262

1.51

1.30 Ok

4TH

250 2850

20

32

16

8944

7125

1.26

1.00 Ok

5TH

250 2850

24

16

16

12

6632

4988

0.93

0.70 Ok

6TH

250 2850

40

16

12

8040

3562

1.13

0.50 Excess

7TH

250 2850

40

16

12

8040

1782

1.13

0.25 Excess

8TH

250 2850

40

16

12

8040

1782

1.13

0.25 Excess

9TH

250 2850

40

16

12

8040

1782

1.13

0.25 Excess

10TH

250 2850

40

16

12

8040

1782

1.13

0.25 Excess

11TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

12TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

13TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

14TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

15TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

16TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

17TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

18TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

19TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

20TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

21ST

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

22ND

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

23RD

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

24TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

25TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

26TH

250 2850

24

16

16

12

6632

1782

0.93

0.25 Excess

ANNEXURE 3
SIZE

SW12
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

300 3880

18

20

48

16

GROUND FLOOR

300 3880

18

20

48

SERVICE FLOOR

300 3880

18

20

AMENITY FLOOR

300 3880

18

1ST

230 3880

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

15300

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.31

16

6984
CHECK
FOR SOFT
15300 STOREY

0.60 Excess
CHECK
FOR SOFT
1.31 STOREY

48

16

15300

2910

1.31

0.25 Excess

20

48

16

15300

2910

1.31

0.25 Excess

16

20

48

16

14672

2231

1.64

0.25 Excess

230 3880

64

16

20

12864

2231

1.44

0.25 Excess

3RD

230 3880

64

16

16

12864

2231

1.44

0.25 Excess

4TH

230 3880

64

16

16

12864

2231

1.44

0.25 Excess

5TH

230 3880

64

16

12

12864

2231

1.44

0.25 Excess

6TH

230 3880

64

16

12

12864

2231

1.44

0.25 Excess

7TH

230 3880

64

16

12

12864

2231

1.44

0.25 Excess

8TH

230 3880

32

16

32

12

10048

2231

1.13

0.25 Excess

9TH

230 3880

32

16

32

12

10048

2231

1.13

0.25 Excess

10TH

230 3880

32

16

32

12

10048

2231

1.13

0.25 Excess

11TH

230 3880

20

16

44

12

8992

2231

1.01

0.25 Excess

12TH

230 3880

16

16

48

12

8640

2231

0.97

0.25 Excess

13TH

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

14TH

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

15TH

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

16TH

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

17TH

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

18TH

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

19TH

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

20TH

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

21ST

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

22ND

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

23RD

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

24TH

230 3880

24

16

16

12

6632

2231

0.74

0.25 Excess

25TH

230 3880

24

16

16

12

6632

3570

0.74

0.40 Excess

26TH

230 3880

24

16

16

12

6632

5354

0.74

0.60 Excess

ANNEXURE 3
SIZE

SW13
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

400 3880

25

50

20

GROUND FLOOR

400 3880

25

50

SERVICE FLOOR

400 3880

25

AMENITY FLOOR

400 3880

1ST

250 3880

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

18645

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.20

20

3880
CHECK
FOR SOFT
18645 STOREY

50

20

18645

3880

1.20

0.25 Excess

25

50

20

18645

3880

1.20

0.25 Excess

25

50

20

17663

10670

1.82

1.10 Excess

250 3880

32

20

22

16

14470

7760

1.49

0.80 Excess

3RD

250 3880

20

16

34

12

7862

4850

0.81

0.50 Excess

4TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

5TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

6TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

7TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

8TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

9TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

10TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

11TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

12TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

13TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

14TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

15TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

16TH

250 3880

16

16

38

12

7510

2425

0.77

0.25 Excess

17TH

250 3880

16

16

38

12

7510

3880

0.77

0.40 Excess

18TH

250 3880

16

16

38

12

7510

3880

0.77

0.40 Excess

19TH

250 3880

16

16

38

12

7510

4850

0.77

0.50 Excess

20TH

250 3880

16

16

38

12

7510

5820

0.77

0.60 Ok

21ST

250 3880

16

16

38

12

7510

6790

0.77

0.70 Ok

22ND

250 3880

16

16

38

12

7510

7760

0.77

0.80 Inadequate

23RD

250 3880

16

16

38

12

7510

7760

0.77

0.80 Inadequate

24TH

250 3880

16

16

38

12

7510

8730

0.77

0.90 Inadequate

25TH

250 3880

16

16

38

12

7510

8730

0.77

0.90 Inadequate

26TH

250 3880

32

16

50

12

12082

11640

1.25

1.20 Inadequate

**Reinforcement Shown for 26th floor is practically not possible to provide at site

0.25 Excess
CHECK
FOR SOFT
1.20 STOREY

ANNEXURE 3

SIZE

SW14
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

450 4260

40

20

22

16

GROUND FLOOR

450 4260

40

20

22

SERVICE FLOOR

450 4260

40

20

AMENITY FLOOR

450 4260

40

1ST

250 4260

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

16982

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

0.89

16

4800
CHECK
FOR SOFT
16982 STOREY

0.25 Excess
CHECK
FOR SOFT
0.89 STOREY

22

16

16982

4800

0.89

0.25 Excess

20

22

16

16982

4800

0.89

0.25 Excess

36

20

22

16

15726

7455

1.48

0.70 Excess

250 4260

20

54

16

12110

4260

1.14

0.40 Excess

3RD

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

4TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

5TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

6TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

7TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

8TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

9TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

10TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

11TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

12TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

13TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

14TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

15TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

16TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

17TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

18TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

19TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

20TH

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

21ST

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

22ND

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

23RD

250 4260

24

16

34

12

8666

2662

0.81

0.25 Excess

24TH

250 4260

24

16

34

12

8666

3195

0.81

0.30 Excess

25TH

250 4260

24

16

34

12

8666

3195

0.81

0.30 Excess

26TH

250 4260

24

16

34

12

8666

5325

0.81

0.50 Excess

ANNEXURE 3
SIZE

SW15
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

450 2680

32

25

10

20

GROUND FLOOR

450 2680

32

25

10

SERVICE FLOOR

450 2680

32

25

AMENITY FLOOR

450 2680

32

1ST

300 2680

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

18848

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.56

20

9648
CHECK
FOR SOFT
18848 STOREY

0.80 Excess
CHECK
FOR SOFT
1.56 STOREY

10

20

18848

3618

1.56

0.30 Excess

25

10

20

18848

3618

1.56

0.30 Excess

30

25

10

20

17866

16884

2.22

2.10 Ok

300 2680

10

25

30

20

14329

14472

1.78

1.80 Ok

3RD

300 2680

26

20

14

16

10978

12060

1.37

1.50 Inadequate

4TH

300 2680

38

16

12

7864

9648

0.98

1.20 Inadequate

5TH

300 2680

26

16

14

12

6808

6432

0.85

0.80 Ok

6TH

300 2680

22

16

18

12

6456

4020

0.80

0.50 Ok

7TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

8TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

9TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

10TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

11TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

12TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

13TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

14TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

15TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

16TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

17TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

18TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

19TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

20TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

21ST

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

22ND

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

23RD

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

24TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

25TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

26TH

300 2680

18

16

22

12

6104

2010

0.76

0.25 Excess

ANNEXURE 3
SIZE

SW16
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

450 3000

25

42

20

GROUND FLOOR

450 3000

25

42

SERVICE FLOOR

450 3000

46

20

AMENITY FLOOR

450 3000

46

1ST

300 2800

2ND

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

15151

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

1.12

20

4050
CHECK
FOR SOFT
15151 STOREY

0.30 Excess
CHECK
FOR SOFT
1.12 STOREY

16

14444

4050

1.07

0.30 Excess

20

16

14444

4050

1.07

0.30 Excess

40

16

12

8040

6720

0.96

0.80 Ok

300 2800

22

16

18

12

6456

4200

0.77

0.50 Excess

3RD

300 2800

22

16

18

12

6456

2520

0.77

0.30 Excess

4TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

5TH

300 2800

22

16

18

12

6456

2100

0.77

0.25 Excess

6TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

7TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

8TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

9TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

10TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

11TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

12TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

13TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

14TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

15TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

16TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

17TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

18TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

19TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

20TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

21ST

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

22ND

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

23RD

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

24TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

25TH

300 2800

18

16

22

12

6104

2100

0.73

0.25 Excess

26TH

300 2800

18

16

22

12

6104

2520

0.73

0.30 Excess

ANNEXURE 3
SIZE

SW17
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

BELOW GROUND

450 2400

28

25

10

20

16884

2700

GROUND FLOOR

450 2400

28

25

10

20

16884

1.56
0.25 Excess
CHECK
CHECK
FOR
FOR SOFT
SOFT
2700 STOREY STOREY

SERVICE FLOOR

450 2400

28

25

10

20

16884

2700

1.56

0.25 Excess

AMENITY FLOOR

450 2400

28

25

10

20

16884

2700

1.56

0.25 Excess

1ST

250 2400

24

25

10

20

14921

13200

2.49

2.20 Ok

2ND

250 2400

25

26

20

12091

10200

2.02

1.70 Ok

3RD

250 2400

16

20

18

16

8642

7200

1.44

1.20 Ok

4TH

250 2400

34

16

12

6834

4800

1.14

0.80 Excess

5TH

250 2400

20

16

14

12

5602

3000

0.93

0.50 Excess

6TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

7TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

8TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

9TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

10TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

11TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

12TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

13TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

14TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

15TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

16TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

17TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

18TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

19TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

20TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

21ST

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

22ND

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

23RD

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

24TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

25TH

250 2400

16

16

18

12

5250

1500

0.88

0.25 Excess

26TH

250 2400

16

16

18

12

5250

1800

0.88

0.30 Excess

ANNEXURE 3
SIZE

C1
B

REINFORCEMENT
NO. OF BAR NO. OF BAR
BARS DIA BARS DIA

BELOW GROUND

450 1200

22

16

20

GROUND FLOOR

450 1200

22

16

SERVICE FLOOR

450 1200

22

16

AMENITY FLOOR

450 1200

22

16

TOTAL
REINF.
PROV

TOTAL
REINF.
REQ.

4422

% OF
STEEL
PROV

% OF
STEEL
REQ.

REMARK

0.82

20

3600
CHECK
FOR SOFT
4422 STOREY

0.67 Ok
CHECK
FOR SOFT
0.82 STOREY

20

4422

3600

0.82

0.67 Ok

20

4422

3600

0.82

0.67 Ok

You might also like