002 Defect Report Hydrant Valve

1. The fire hydrant valve on the main deck starboard side of the MV.SETIA EMAS was damaged due to rust. 2. A work order request was completed to repair the defect because it could not be fixed onboard and required onshore support. 3. The designated person/technical manager was requested to approve the work order for a new fire hydrant valve to be installed since the defect could not be repaired by the crew.

Uploaded by

Jeet Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views2 pages

002 Defect Report Hydrant Valve

1. The fire hydrant valve on the main deck starboard side of the MV.SETIA EMAS was damaged due to rust. 2. A work order request was completed to repair the defect because it could not be fixed onboard and required onshore support. 3. The designated person/technical manager was requested to approve the work order for a new fire hydrant valve to be installed since the defect could not be repaired by the crew.

Uploaded by

Jeet Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

ALLIANZ MIDDLE EAST SHIP MANAGEMENT LLC

Vessel: MV.SETIA EMAS


Location: DMC PORT, Berth #07 of DUBAI

What is wrong? (Defect details)

1 Open valve of Fire hydrant at main deck


stbd side is damage

Send to:

Investigation
(Cause of defect)

Rusted

If the defect could not be repaired onboard, and onshore support


is needed, then please complete this work order request.

Details of work required.

Action taken onboard to repair the defect.

Need for renewed Valve of Hydrant

WORK ORDER

Defect repaired? YES/NO.


If YES, send this report
to office for information.

If NO, complete Work


Order request (below) and
send for further action.

For approval send to:


Designated Person/technical Manager

Repairs carried out


satisfactorily.
(Signed by originator)

To be completed by Supervisor
Repairs carried out and
spare parts used

Form No. SMS/29/Rev. 1

Designated Person/technical Manager

DEFECT REPORT

Repaired by
(Signature)

Date: 06/07/2014

ALLIANZ MIDDLE EAST SHIP MANAGEMENT LLC


Corrective and Preventive Action :

Name of Originator: IDRIS AMRULLAH


Title
: CH.OFFICER
Date
: 08 June 2015
Signature
:

Form No. SMS/29/Rev. 1

Approved By :
Name :.
Date :.
Signature:

Date: 06/07/2014