0% found this document useful (0 votes)
130 views2 pages

38byb 1 Phase

The document provides wiring diagrams and schematic diagrams for air conditioner units. It includes labels for the diagrams explaining the components and wiring. Notes provide installation and safety instructions.

Uploaded by

my name
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
130 views2 pages

38byb 1 Phase

The document provides wiring diagrams and schematic diagrams for air conditioner units. It includes labels for the diagrams explaining the components and wiring. Notes provide installation and safety instructions.

Uploaded by

my name
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

38AYB/38BYB

1 Phase
Series 0,1

Wiring Diagrams

SCHEMATIC DIAGRAM

CONNECTION DIAGRAM
BLK

*CH
RED

RED or BLK
L1
208/230 1
POWER
SUPPLY

21

11

L2

CAP

YEL

YEL

BLK

YEL

BLK

CONT

*CH

5
*SR

23

OFM

DR

23

CAP
OF1

OF2

*HPS

BLU

*SC

1
*SR

RVS

BLU or YEL

BLK
BLU or YEL

YEL
DR

W2
R R

TEST
C
C

LOGIC

DR

O O

90
50
30

OF1

DFT

BRN

DFT
LOGIC

DFT

OF2

Y Y

T1
T2
LOGIC

C Y O W2 R

YEL WHT
BLK ORN RED

BLK
or
ORN

BLK
or
ORN
BLK
or
PNK

*LPS

C Y O W2 R E L

INDOOR THERMOSTAT (NOTE #5)

LOGIC

C
CONT

-LEGEND-

DFT

INDOOR UNIT
TERMINAL BLOCK

*DTS *HPS

T2

BLK
or
PNK

C Y O W2 R E L W3 G

CTD

T1

RVS

DR

YEL

CTD

CB

5
EQUIP
GND

YEL
BRN
*DTS

*LPS

BRN

BRN
YEL

BLK

21

11

*SC

L2

BLU

YEL
OFM

CONT

COMP
R

CONT

COMP BLU
S
BLK C
23 23

EQUIP
GND

(LADDER FORM)

L1

RED

RED or BLK

FACTORY POWER WIRING


FIELD POWER WIRING

FACTORY CONTROL WIRING


FIELD CONTROL WIRING

NOTE

CONDUCTOR ON CIRCUIT BOARD


COMPONENT CONNECTION

THIS DEFROST CONTROL BOARD CONTAINS A FIVE MINUTE SHORT CYCLE PROTECTOR.
A FIVE MINUTE DELAY WILL OCCUR BETWEEN COMPRESSOR OFF/ON CYCLES.

1/4-INCH QUICK CONNECT


TERMINALS

90
50
30
TEST

FIELD SPLICE

FIELD SELECTED TIME PERIOD


BETWEEN DEFROST CYCLES (MINUTES)

JUMPERED TEST PINS (USE METAL OBJECT), FIELD SPEED-UP CYCLE


HEAT CYCLE: 90 MIN. ACCELERATED TO 21 SEC.
50 MIN. ACCELERATED TO 12 SEC.
30 MIN. ACCELERATED TO 7 SEC.
DEFROST CYCLE: 10 MIN. ACCELERATED TO 2 SEC.

NOTES:
1. COMPRESSOR AND FAN MOTOR FURNISHED WITH INHERENT THERMAL
PROTECTION.
2. TO BE WIRED IN ACCORDANCE WITH NATIONAL ELECTRIC CODE (N.E.C.) AND
LOCAL CODES.
3. N.E.C. CLASS 2, 24 V CIRCUIT, MIN. 40 VA REQUIRED.
4. USE COPPER CONDUCTORS ONLY FROM DISCONNECT TO UNIT.
5. MUST USE THERMOSTAT AND SUB-BASE AS STATED IN PRE-SALE LITERATURE.
6. IF INDOOR SECTION HAS A TRANSFORMER WITH A GROUNDED SECONDARY,
CONNECT THE GROUNDED SIDE TO "C" ON THE CIRCUIT BOARD.
7. IF ANY OF THE ORIGINAL WIRE, AS SUPPLIED, MUST BE REPLACED, USE THE
SAME OR EQUIVALENT WIRE.
8. CHECK ALL ELECTRICAL CONNECTIONS INSIDE CONTROL BOX FOR TIGHTNESS.
9. DO NOT ATTEMPT TO OPERATE UNIT UNTIL SERVICE VALVES HAVE BEEN
OPENED.
10. WHEN DTS, LPS AND HPS ARE NOT REQUIRED, A JUMPER WILL BE INSTALLED
BETWEEN Y AND T1 ON THE DEFROST BOARD.

JUNCTION
CAP

CAPACITOR (DUAL RUN)

*CH
COMP
CTD
CONT
CB
DFT
DR
*DTS
*HPS
*LPS
OFM
RVS
*SC
*SR

CRANKCASE HEATER
COMPRESSOR
COMPRESSOR TIME DELAY
CONTACTOR
CIRCUIT BOARD
DEFROST THERMOSTAT
DEFROST RELAY AND CIRCUITRY
DISCHARGE TEMP. SWITCH
HIGH PRESSURE SWITCH
LOW PRESSURE SWITCH
OUTDOOR FAN MOTOR
REVERSING VALVE SOLENOID
START CAPACITOR
START RELAY
* MAY BE FACTORY OR FIELD INSTALLED

322851-101 REV. A

A95017

Fig. 138AYB018-042 (30); 048 (30,31), 38BYB018-042 (30); 048 (30,31)


208-230v, 1 Phase, 60 Hertz
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 101
Catalog No. 533-809
Printed in U.S.A.
Form 38AYB-2W
Pg 1
8-95
Replaces: 38AYB-1W
Tab 5a 5a

CONNECTION DIAGRAM

*CHS

*CH

BLK
or
RED

BLK

RED or BLK

CONT

L1
208/230 1
POWER
SUPPLY

-LEGENDBLK

BLK

BLK

21

11

L2

BLK

+t

YEL

*ST
BLU

YEL
*SC

YEL
OFM

EQUIP
GND

CAP

YEL

13 23

BLU

BLU

COMP BLU
S
H
C

BRN

BLK
YEL
*LPS

YEL

BRN
BLK

*HPS

BLU

BLU or YEL

BLK

YEL

BLU or YEL

YEL
DR

90
50
30

OF1
TEST

C
C

LOGIC

BRN

DFT

OF2

T1
T2

YEL

CTD

LOGIC

RVS

C Y O W2 R

CB

BLK
or
ORN

BLK
or
ORN

YEL WHT
BLK ORN RED

BLK
or
PNK

BLK
or
PNK

NOTES:

INDOOR UNIT
TERMINAL BLOCK

C Y O W2 R E L

INDOOR THERMOSTAT (NOTE #5)

SCHEMATIC DIAGRAM

*CH
*CHS

L1

L2

(LADDER FORM)

CONT

11 21

R
COMP
S

OF1

CONT

OFM

DR

EQUIP
GND

*ST
+t

*SC

1
*SR

C
F

OF2

23

13

CAP
RVS

DR

O O
W2
R

R
DFT

DFT
LOGIC

Y
DR
T1

*LPS

90
50
30
TEST

*DTS

*HPS

CTD

T2

LOGIC

* MAY BE FACTORY OR FIELD


INSTALLED.

DFT

C Y O W2 R E L W3 G
G

2
5
*SR

BLK

*DTS

FACTORY POWER WIRING


FIELD POWER WIRING
FACTORY CONTROL
WIRING
FIELD CONTROL WIRING
CONDUCTOR ON CIRCUIT
BOARD
COMPONENT CONNECTION
1/4-INCH QUICK CONNECT
TERMINALS
FIELD SPLICE
JUNCTION
CAP
CAPACITOR (DUAL RUN)
*CH
CRANKCASE HEATER
*CHS CRANKCASE HEATER
SWITCH
COMP COMPRESSOR
CTD
COMPRESSOR TIME DELAY
CONT CONTACTOR
CB
CIRCUIT BOARD
DFT
DEFROST THERMOSTAT
DR
DEFROST RELAY AND
CIRCUITRY
*DTS DISCHARGE TEMP. SWITCH
*HPS HIGH PRESSURE SWITCH
*LPS
LOW PRESSURE SWITCH
OFM
OUTDOOR FAN MOTOR
RVS
REVERSING VALVE
SOLENOID
*SC
START CAPACITOR
*SR
START RELAY
*ST
START THERMISTOR

1. COMPRESSOR AND FAN MOTOR


FURNISHED WITH INHERENT THERMAL
PROTECTION.
2. TO BE WIRED IN ACCORDANCE WITH
NATIONAL ELECTRIC CODE (N.E.C.)
AND LOCAL CODES.
3. N.E.C. CLASS 2, 24 V CIRCUIT,
MIN. 40 VA REQUIRED.
4. USE COPPER CONDUCTORS ONLY
FROM DISCONNECT TO UNIT.
5. MUST USE THERMOSTAT AND SUBBASE AS STATED IN PRE-SALE
LITERATURE.
6. IF INDOOR SECTION HAS A
TRANSFORMER WITH A GROUNDED
SECONDARY, CONNECT THE
GROUNDED SIDE TO "C" ON THE
CIRCUIT BOARD.
7. IF ANY OF THE ORIGINAL WIRE, AS
SUPPLIED, MUST BE REPLACED, USE
THE SAME OR EQUIVALENT WIRE.
8. CHECK ALL ELECTRICAL CONNECTIONS
INSIDE CONTROL BOX FOR TIGHTNESS.
9. DO NOT ATTEMPT TO OPERATE UNIT
UNTIL SERVICE VALVES HAVE BEEN
OPENED.
10. WHEN DTS, LPS AND HPS ARE NOT
REQUIRED, A JUMPER WILL BE
INSTALLED BETWEEN Y AND T1 ON
THE DEFROST BOARD.

NOTE

CONT

FIELD SELECTED TIME PERIOD


BETWEEN DEFROST CYCLES (MINUTES)
JUMPERED TEST PINS (USE METAL OBJECT), FIELD SPEED-UP CYCLE
HEAT CYCLE: 90 MIN. ACCELERATED TO 21 SEC.
50 MIN. ACCELERATED TO 12 SEC.
30 MIN. ACCELERATED TO 7 SEC.
DEFROST CYCLE: 10 MIN. ACCELERATED TO 2 SEC.

This defrost control board contains a


five minute short cycle protector. A five
minute delay will occur between
compressor OFF/ON cycles.
320822-401 REV. D
A95016

Fig. 238AYB060 (30,31), 38BYB060 (30,31)


208-230v, 1 Phase, 60 Hertz

Copyright 1995 CARRIER Corp. 7310 W. Morris St. Indianapolis, IN 46231

38ayb2w

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 1 4
PC 101
Catalog No. 533-809
Printed in U.S.A.
Form 38AYB-2W
Pg 2
8-95
Replaces: 38AYB-1W
Tab 5a 5a

You might also like