0% found this document useful (0 votes)
422 views1 page

Release For Grouting

Release for grouting works

Uploaded by

Umair Awan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
422 views1 page

Release For Grouting

Release for grouting works

Uploaded by

Umair Awan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Customer

Logo

RELEASE FOR GROUTING

Project:

Certificate No.:

Foundation No.:

System:

Area:

Reference Drawings:

The following items have been checked:


1.1

Location and Orientation

Yes

As per Drawing

N _______ E _________

1.1.2

Actual

N _______ E _________

Top of Elevation

1.2.1
1.3

As per Drawing

Not Req.

Correct

1.1.1

1.2

No

Correct
_______ Actual _______

Embendent Parts

Correct

1.3.1 Top of Shims ___________ Top of Anchor Bolts _____________


1.4

Anchor Bolt Size & Type

Correct

1.5

Equipments/Column Aligned and Leveled

1.6

Type of Grout ______________ Grout Stage _________________________

Remarks

PREPARED BY

ETIMAAD QA&QC

CUSTOMER

NAME:

NAME:

NAME:

DATE:

DATE:

DATE:

SIGNATURE:

SIGNATURE:

SIGNATURE:

Date: May 22, 2007


Page: 1 of 1

Doc. No. QA&QC/FRM-93


Rev.: 00
This document is the intellectual property of ETIMAAD. Any unauthorized use, including modification
and reproduction of the content is strictly prohibited. Copyrights Ordinance 2006, All rights reserved.

You might also like