PMF 19 - Evaluation of Contractors

This document provides a rating form to evaluate contractors on ongoing projects or after project completion. It rates contractors on safety, quality, progress, and general performance on a scale of 1 to 5. The safety section rates approaches to safety, understanding of environment health and safety procedures, implementation of project-specific safety procedures, housekeeping, and response time for corrective action. The quality section rates quality plans, technical manpower, quality checklists, method statements, quality checks at stages of execution, and quality control laboratories. The progress section rates site mobilization, manpower mobilization, plant/machinery mobilization, foresight, response to corrective action, and cash flow versus progress. The general section rates support from the

Uploaded by

Anoop Sankar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views2 pages

PMF 19 - Evaluation of Contractors

This document provides a rating form to evaluate contractors on ongoing projects or after project completion. It rates contractors on safety, quality, progress, and general performance on a scale of 1 to 5. The safety section rates approaches to safety, understanding of environment health and safety procedures, implementation of project-specific safety procedures, housekeeping, and response time for corrective action. The quality section rates quality plans, technical manpower, quality checklists, method statements, quality checks at stages of execution, and quality control laboratories. The progress section rates site mobilization, manpower mobilization, plant/machinery mobilization, foresight, response to corrective action, and cash flow versus progress. The general section rates support from the

Uploaded by

Anoop Sankar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

MHIVPL / PMF / xxx

Issue Date: 01 Jan 2014


Rev 0

EVALUATION FOR CONTRACTORS (ONGOING/ POST


COMPLETION)
Project Name
Package
Package No
Package Contractor

:
:
:
:

RATING FROM 1 TO 5 (1 for Poor and 5 for Best)


SAFETY
S.n
Activity
o
1
Approach towards safety
2
Understanding of EH & S
3
Implementation of Project Specific Safety
4
5
6

Rating

Procedures (SWMS, work permits etc.)


Housekeeping
Response time for Corrective Action
Corporate Safety Plan

QUALITY
S.n
o
1
2
3
4
5
6

Activity

Rating

Quality Plan
Technical Manpower Deployed
Project Specific Quality checklist
Method statement to achieve quality
Quality checks at every stage of execution
Quality Control Laboratory at site

MPG Hotels & Infrastructure Ventures Pvt. Ltd.

Page 1 of

MHIVPL / PMF / xxx

Issue Date: 01 Jan 2014


Rev 0

PROGRESS
S.n
o
1
2
3
4
5
6

Activity

Rating

Site Mobilisation / Logistics


Mobilisation of Manpower
Mobilisation of Plant / Machinery
Pro active approach / Fore sight
Response time for Corrective Action
Cash flow vs progress

GENERAL
S.n
Activity
o
1
Support from Head Office
2
Availability of Material

MPG Hotels & Infrastructure Ventures Pvt. Ltd.

Rating

Page 2 of

You might also like