Air Compressor Daily Checklist

This document is a daily air compressor checklist used at the SADARA polyethylene plant. It lists 15 items that are checked on the air compressor including the frame, hoses, safety cables, control panel, electrical wiring, batteries, fluid levels, gauges, and fire extinguisher. The operator and inspector initial by each date to confirm the checks were completed.

Uploaded by

Eric
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
54% found this document useful (13 votes)
20K views4 pages

Air Compressor Daily Checklist

This document is a daily air compressor checklist used at the SADARA polyethylene plant. It lists 15 items that are checked on the air compressor including the frame, hoses, safety cables, control panel, electrical wiring, batteries, fluid levels, gauges, and fire extinguisher. The operator and inspector initial by each date to confirm the checks were completed.

Uploaded by

Eric
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

CCE

SADARA - Polyethylene COB-Project


DAILY AIR COMPRESSOR CHECKLIST
Year :
Month: ____________________
Equipment/Serial #: _______________
S/N
1
2

DESCRIPTION
Frame/casing is free of damaged
Discharge air hose & coupler ok
Whiplash safety cable/hose restraint ok

3
4
5
6
7
8
9
10
11
12
13
14
15

Control panel checked


Electrical wirings checked
Checked battery terminal/electrolyte
Fuel level ok
No engine oil leaking
No compressor oil leaking
Radiator tank coolant level/no leaking
Engine oil level ok
Compressor oil level ok
Gauges working properly
Drip tray/catch basin
Earth cable

Brand: __________________________
1

10

11

Model #: _______________
12

13

14

15

16

17

18

19

20

21

16 Fire extnguisher ok
OPERATORS INITIAL
INSPECTORS INITIAL

CCE
Polyethylene COB-Project

MPRESSOR CHECKLIST