Bond Calculation
Bond Calculation
Spesifikasi
WI Batu kapur
P 80 (Produck Mill)
F80 (Umpan Mill)
D (Diameter efektif Mill)
Wm
FAKTOR KOREKSI :
1. EF1 Drying Grinding
EF1=
6.1930317535
2. EF3
(8/Dft)^0.2
3. EF4 =
[Rr + ( Wi - 7 )*((F80-F0)/F0)]/Rr
Fo =
Rr =
EF4 =
(P80 + 10.3)/(1.145*P80)
4. EF5 =
Wm =
Penambahan Crushing
5.627893054
Pc =
Fc =
Wc =
20000
80000
0.0015
W = Wm + Wc
F80 (m)
80000
70000
60000
50000
40000
30000
Kondisi Operasi
Feed (Wet)
Product drY
Ampere Table
5.629393054
Power (Kwh)
6.7875
6.777
6.7623
6.7435
6.7179
6.681
KW Table
Kwh/ton
Koreksi untuk forrmula Bond
0.823
Maka
WI Batu kapur
P 80
F80
Wm
Produksi
Pembatasan Ampere Motor
Kw
6.3503010358
566.902258604
X EFF VM
6 kwh/short ton
55
1000
5.9 m
kwh/ton
=(2.44/D)^0.2
0.8381226
4000*(13/Wi)^0.5 = 5887.84
F80/P80 =
18.1818
1.0456587
1.03692
7.688
Perbedaan %
0
0.15493581
0.37265427
0.65248017
1.03603805
1.59407274
723.0 ton/jam
656.0 ton/jam
83.6 %
1.1022222
3343.8 Kw
5.1
6 kwh/short ton
55
25555
kwh/ton
90 %
3600 Kw
Granulometri Reject RM
Size
< 10 mm
10-50 mm
50-90 mm
> 90 mm
Total
kg
0.7
3.4
2.4
0.9
7.3
%
9.3
45.8
32.7
12.2
100.0
9.3
55.0
87.8
100.0