Time Schedule

This document outlines the target schedule requirements and process for Minex training on 30 November 2011. It details collecting requirement information like target type, period, and number from the detailed schedule. Then it describes generating the target schedule sequentially from the detailed schedule, target sequence queue (TSQ), and sequence generator. Finally, it mentions creating a final production plan and merging schedules from movement files and branch schedules.

Uploaded by

andimercury42
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
903 views46 pages

Time Schedule

This document outlines the target schedule requirements and process for Minex training on 30 November 2011. It details collecting requirement information like target type, period, and number from the detailed schedule. Then it describes generating the target schedule sequentially from the detailed schedule, target sequence queue (TSQ), and sequence generator. Finally, it mentions creating a final production plan and merging schedules from movement files and branch schedules.

Uploaded by

andimercury42
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 46

MINEX TRAINING

30 NOVEMBER 2011

TARGET SCHEDULE
REQUIREMENT :
- TARGET TYPE (WASTE or COAL or TOTAL)
- TARGET PERIOD & NO OF PERIOD
- TARGET NUMBER
- SEQUENCE
- TSQ
- DSQ

- FROM DETAILED SCHEDULE


- SEQUENCE GENERATOR

TARGET SCHEDULE FROM


DETAILED SCHEDULE

CREATE FP

TARGET SCHEDULE FROM


TSQ

TARGET SCHEDULE FROM SEQ


GENERATOR

??????????????????
?

MOVEMENT FILE

BRANCH SCHEDULE

MERGE SCHEDULE

?????????????????????????????
????