0% found this document useful (0 votes)
550 views

Major Project Report Format

This document appears to be a zeroth review report for a major project submitted by a group of students. It includes sections on introduction and purpose, system analysis of existing and proposed systems, tools and languages to be used, and conclusions. The abstract is blank and most subsections are not filled in, suggesting this is an outline or template for the group to complete their report. It will provide details on their project topic, the existing system and its disadvantages, advantages of their proposed system, and the programming tools and languages they plan to utilize.

Uploaded by

durvasikiran
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
550 views

Major Project Report Format

This document appears to be a zeroth review report for a major project submitted by a group of students. It includes sections on introduction and purpose, system analysis of existing and proposed systems, tools and languages to be used, and conclusions. The abstract is blank and most subsections are not filled in, suggesting this is an outline or template for the group to complete their report. It will provide details on their project topic, the existing system and its disadvantages, advantages of their proposed system, and the programming tools and languages they plan to utilize.

Uploaded by

durvasikiran
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

MAJOR PROJECT

ZEROTH REVIEW REPORT

On
<TOPIC NAME>
Submitted by
<GROUP LEADER NAME (ROLL NO)>
<GROUP MEMBER NAME (ROLL NO)>
<GROUP MEMBER NAME (ROLL NO)>
<GROUP MEMBER NAME (ROLL NO)>

BATCH:
Remarks of HOD:

DATE OF SUBMISSION : 02nd January 2016


Department Of Information Technology
Andhra Loyola Engineering & Technology,Vijayawada-8
www.aliet.ac.in

ABSTRACT

BATCH NO: 1
MAJOR PROJECT 2015- 16

Project title

BATCH NO: 1
MAJOR PROJECT 2015- 16

1. INTRODUCTION
1.1 PURPOSE

1.2 SCOPE

2.
Project title

BATCH NO: 1
MAJOR PROJECT 2015- 16

SYSTEM ANALYSIS
1.3 EXISTING SYSTEM
1.4 DISADVANTAGES OF EXISTING SYSTEM
1.5 PROPOSED SYSTEM
1.6 ADVANTAGES OF PROPOSED SYSTEM

1.7 APPLICATION OF PROPOSED SYSTEM

Project title

BATCH NO: 1
MAJOR PROJECT 2015- 16

3. TOOLS OR LANGUAGES USED

Project title

BATCH NO: 1
MAJOR PROJECT 2015- 16

4. CONCLUSION

Project title

BATCH NO: 1
MAJOR PROJECT 2015- 16

5. REFERENCE
<Should be in IEEE format>
WEBSITES:
[1] http://leto.net/writing/nasm.php Accessed on 12/10/2014
[2] http://asm.sourceforge.net/ Accessed on 12/10/2014
[3] http://asm.sourceforge.net/articles/linasm.html Accessed on 12/10/2014
[4] http://www.int80h.org/bsdasm Accessed on 12/10/2014

TEXTBOOKS:
[5] Compilers - Principles, Techniques and Tools by Alfred Aho, Monica Lam, Ravi
[6] Guide to Assembly Language Programming in Linux- Sivarama P Dandamudi

Project title

You might also like