Design of Scissor Stair - U Type: Loadings
Design of Scissor Stair - U Type: Loadings
MARK
p2
p1
L1 (m) =
L2 (m) =
h (m)
b
c
t2
t1
2.8
2.7
1.5
1.4
0.1
0.14
0.1
m
m
m
m
m
m
m >1/30*L1
0.3
0.15
0.00
0.21
0.51
m
m
m
m
rad.
B
t2 > L2/20=
t1>L1/30=
C
0.09
0.135
h
a
thread
Riser
Max. thickness of finishes
=
Ave thickness of slab incl finishes =
a
Loadings
A'
=
=
=
1.2
Live Loads
5.18
0.00
1.65
6.83
2.00
KN/m2
5.92
0.00
1.89
7.81
2.00
kN/m
8.29
0.00
2.64
10.93
2.80
p2
17.04
1.4
Ulimate Loads
L1/2
29.05 deg
flight
L2
12.17
landing
KN/m2
2.50
0.00
1.23
3.73
2.00
kN/m
3.63
0.00
1.78
5.41
2.90
p1
10.55
7.28
`
Analysis
I1 = 1/12(b+c/2)t1^3 =
I2 = 1/12(b)t2^3 =
u1
u2
=
=
=
0.000121 m4
0.00032 m4
0.5*I1*L2/(0.5*I1*L2+I2*L1cos a)
0.172
0.828
0.5I1*L2= 0.000163
I2*L1cos a = 0.000784
p1
H1
R1
B
B
-28.49 kN
-17.53 kN
0
h
a
A'
MB1
MB1 (dl)
=
=
=
Nb1=Nc1 =
NB1(dl) =
VB1
=
flight
MB1
MB1 (dl)
=
=
NB1
=
=
=
=
=
=
NB1 (dl)
VB1
MA1
-u2*P1*L1^2/12
-5.71 kN.m
-3.51 kN.m
-28.49 kN
-17.53 kN
-14.77028
-5.71 kN.m
-3.51 kN.m
-(p1*L1/2sin a + H1*Cos a )
-32.08 kN
-19.73 kN
0.9235
u2*p1*L2/24
2.85 kN.m
H1
C
L2
L1/2
MA1 (dl)
1.75 kN.m
NA1=NB1 =
NA1(dl) =
VA1
=
-32.08 kN
-19.73 kN
0.9235
p2
Flight
MB2
MB2 (dl)
NB2
NB2 (dl)
VB2
MA2
MA2 (dl)
1
2
3
4
p1
dl
p2
dl
B
B
H1
C
h
a
kN.m
kN.m
A'
L2
L1/2
-u2*p2L2^2/12
-8.57
-6.60
=
=
=
=
=
=
=
-H2sin a
-14.79
-11.39
-14.79358
-(2+u2)/24*p2*L2^2
-14.64
-11.27
-(R2sin a + H2cos a)
-48.97
-38.34
-25.426
=
=
LANDING
C
M
4.63
2.85
-1.78
-1.37
N
-28.49
-17.53
-30.46
-23.45
V
0.00
0.00
0.00
0.00
M
-5.71
-3.51
-1.78
-1.37
N
-28.49
-17.53
-30.46
-23.45
V
-14.77
-9.09
0.00
0.00
M
-5.71
-3.51
-8.57
-6.60
N
-32.08
-19.73
-14.79
-11.39
V
0.92
0.57
-14.79
-11.39
M
2.85
1.75
-14.64
-11.27
N
-32.08
-19.73
-48.97
-38.34
V
0.92
0.57
-25.43
-19.91
2.85
3.26
1.07
-58.95
-51.94
-47.99
0.00
0.00
0.00
-7.49
-7.08
-5.29
-58.95
-51.94
-47.99
-14.77
-14.77
-9.09
-14.27
-12.30
-12.08
-46.87
-43.47
-34.53
-13.87
-10.47
-14.23
-11.78
-8.42
-12.88
-81.05
-70.42
-68.71
-24.50
-18.98
-24.86
1+3
1+4
2+3
DESIGN
1. Landing
R1
kN
kN
=
=
=
NA2=NB2 =
NA2(dl)
VA2
-30.46
-23.45
0
-1.78
-1.37
H1
Mmax at B
N
rebar dia
Check M/N
e=
t1/2-dia/2-cov
Mt +eN
fcu
fy
cover
t1
d
FLIGHT
B
-7.49
-58.95
0.016
0.127
0.017
-8.491
kN.m
kN
m
m>e
m
kN.m
0.025 m
0.1 m
0.075
-7488877
-58950.06
16
127.0377
N.mm
N
mm
mm
-8491028 N.m
20
210
25
100
75
N/mm2
mm
mm
mm
width
k
z
As
As prov
For b+c/2 As
=
=
=
=
=
=
1.45
0.052
0.94
71
652
832
1206
1450 mm
m
* ds
mm
mm2/m
mm2/m
mm2
per m width
OK
6
16
@
2. Flight
Mmax at A
N
-12.88
-81.05
0.02
0.159
-0.02
-11.261
Ecc=
Check M/N
e=
t1/2-ecc
Mt +eN
fcu
fy
cover
t1
d
width
k
z
For b
As
As prov
As
=
=
=
=
=
=
0.025
0.14
0.115
1.4
0.030
0.95
109
564
718
1005
kN.m
kN
m
m>e
m
kN.m
240
-1E+007
-81048.92
20
158.9352
N.mm
N
mm
mm
-1E+007 N.m
20
210
25
140
115
1400
m
m
N/mm2
mm
mm
mm
mm
per m width
* ds
mm
mm2/m
mm2/m
mm2
OK
5
T
@
16
300
PROJECT
MARK
p2
p1
L1 (m) =
L2 (m) =
h (m)
b
c
t2
t1
0.9
2.52
1.75
1.5
0.2
0.15
0.15
m
m
m
m
m
m
m >1/30*L1
0.28
0.16
0.12
0.34
0.61
m
m
m
m
rad.
B
t2 > L2/20=
Loadings
A'
=
=
=
1.4
Live Loads
8.49
7.80
16.29
5.00
KN/m2
10.33
7.80
0.00
18.13
5.00
kN/m
15.50
11.70
0.00
27.20
7.50
p2
50.08
1.6
Ulimate Loads
L2
33.38
landing
KN/m2
3.75
7.80
11.55
5.00
24.17
`
Analysis
Ix1 = 1/12(b+c/2)t1^3
Ix2 = 1/12(b)t2^3
It2 = Xbt2^3
1 =Eix2/EIx1)
2 =Eix2/GIt2)
(b+c)/2
=
=
=
=
=
=
0.00045 m4
0.000421875 m4
0.0015811884 m4
0.9375
0.635
0.85
11
22
33
44
0.333*h^2*L2+2*(b+C)/2^2sin^2a L2
3.015213742
2L2 Cos^2 a
1.080013195
L2 + 0.51L1cos a
2.866515454
0.252L1L2sin(a)^2
0.295316108
where G = 0.42E
0.82137
0.570396
12 = 21 =
-0.5*2*L1L2sin(a)cos(a)
-0.337504123
1p1
-1/48*p1*L1L^2*(3L1+8L2)tan(a)
-73.09921626
0
2p1 = 4p1 =
3p1
1p2
L1/2
34.78 deg
flight
0.03
0.126
a
thread
Riser
Max. thickness of finishes
=
Ave thickness of slab incl finishes =
a
t1>L1/30=
C
1/48*1p1L1^3cos(a)+1/8*p1L1L2(2L2+L1)
65.57552632
-1/8*p2L2^4*tan(a)
-175.3039724
kN/m
6.00
12.48
0.00
18.48
8.00
p1
38.67
2p2 = 4p2 =
3p2
=
0
1/6*p2L2^3
133.5649314
3.015214 -0.637508
-2.205 0.199221184
-0.637508 1.080013
0 -0.337504123
-2.205
0 2.866515
0
0.199221 -0.337504
0 0.295316108
X1
X2
X3
X4
248.4032
0
-199.1405
0
MA
NA
Mc
= -
-73.09922
0
65.57553
0
+
+
+
+
-175.304
0
133.5649
0
X1
X2
X3
X4
=
=
=
=
101.0001
59.61809
8.220663
-2E-014
X1*h-X3-p1*L1/8(L1+4L2)-1/2*p2L2^2)
-38.2 kN.m
-x1cos(a)-(p1L1/2+p2L2)sin(a)
-164.9 kN
in tension
-X3
-8.2 kN.m
VA
fcu
fy
cover
=
=
=
e0
x1sin(a)-(p1L1/2+p2L2)cos(a)
175.6 kN
35
460
30
1. Flight
>
in tension
t2/2-cover-dia/2
rebar
=
MA+Ne
width
d
k
z
For b
As
As prov
As
=
=
=
M/N
0.231982747 m
0.037
0.016 m
-38.24603074 +
-44.34606688
1.5
112
0.06733793
0.92
102.8770616
1077
1206
1810
=
=
=
231.9827 mm
37 mm
16 mm
-6.100036
m
mm
d
mm
mm2/m
mm2/m
mm2
OK
9
16
@
Shear stress
2. Landing
v
100As/b/d
400/d
vc
=
=
=
=
0.78025204 N/mm2
1.0771174812
3.571428571
0.996302365 N/mm2
Mc
-8.220662596 kN.m
=
=
=
1.7
114
0.0106311478
0.95
108.3
190
399
679
width
d
k
z
As
As prov
For b+c/2 As
128
m
mm
d
mm
mm2/m
mm2/m
mm2
OK
6
12
kN
kN.m
kN
kN.m
2b+c
As
1357 mm2
12
T
@
12
280
from reynolds
X=
1/3-3.36/16*t/b*(1-(t/b)^4/12)
from 6-6
b/t
1
1.5
1.75
2
2.5
3
4
6
8
10 ###
X 0.141 0.196 0.214 0.229 0.249 0.263 0.281 0.299 0.307 0.313 0.333
1.4072 1.0123 0.9272 0.8664 0.7968 0.7544 0.7061 0.6636 0.6463 0.6339 0.5958
1 0.4444 0.3265
0.25
0.16 0.1111 0.0625 0.0278 0.0156
0.01
0
1
0
0
0
0
0
0
0
0
0
0 0.333
2
0
0
0
0
0
0
0
0
0 0.313
0
b1
t1
1.6 b1/t1
0.15
b
t2
1.5 b/t2
0.15
u1
=
=
u2
10.667
10
X 0.3136
0.6326 1/5.04x
X 0.3123
-25.32 kN
-16.94 kN
0
=
=
MB1 (dl) =
Nb1=Nc =
NB1(dl) =
VB1
=
-u2*P1*L1^2/12
-0.93 kN.m
-0.62 kN.m
-25.32 kN
-16.94 kN
-17.4
B
B
H1
C
h
a
A'
MB1
p1
L2
L1/2
flight
MB1
=
MB1 (dl) =
-0.93 kN.m
-0.62 kN.m
NB1
=
=
NB1 (dl) =
VB1
=
MA1
=
=
MA1 (dl) =
-(p1*L1/2sin a + H1*Cos a )
-30.73 kN
-20.56 kN
0.1510
u2*p1*L2/24
0.46 kN.m
0.31 kN.m
NA1=NB=
NA1(dl) =
VA1
=
-30.73 kN
-20.56 kN
0.1510
p2
Flight
NB2
=
=
NB2 (dl) =
VB2
=
MA2
=
=
MA2 (dl) =
-H2sin a
-36.08
-27.44
-36.08
-(2+u2)/24*p2*L2^2
-31.20
-23.73
NA2=NB=
-(R2sin a + H2cos a)
###
-59.06
1+3
1+4
2+3
p1
dl
p2
dl
LANDING
C
M
N
2.99 -25.32
2.00 -16.94
-17.10 -63.26
-13.00 -48.10
-14.11 -88.58
-10.01 -73.43
-15.10 -80.20
H1
C
A'
L2
L1/2
-u2*p2L2^2/12
-9.40
-7.15
B
B
a
kN.m
kN.m
=
=
MB2 (dl) =
VA2
R1
kN
kN
MB2
NA2(dl) =
1
2
3
4
-63.26
-48.10
0
-17.10
-13.00
H1
-67.57
B
V
M
N
V
0.00 -0.93 -25.32 -17.40
0.00 -0.62 -16.94 -11.64
0.00 -17.10 -63.26
0.00
0.00 -13.00 -48.10
0.00
FLIGHT
B
M
-0.93
-0.62
-9.40
-7.15
A
N
V
-30.73
0.15
-20.56
0.10
-36.08 -36.08
-27.44 -27.44
M
0.46
0.31
-31.20
-23.73
N
-30.73
-20.56
-123.94
-59.06
V
0.15
0.10
-67.57
-32.20
-30.74
-23.26
-30.89
-154.67
-89.78
-144.50
-67.42
-32.04
-67.47
DESIGN
1. Landing
Mmax at B
N
Ecc=
Check M/N
e=
t1/2-ecc
Mt +eN
fcu
fy
cover
t1
d
width
k
z
=
=
=
As
=
As prov =
For b+c/ As
=
2. Flight
Mmax at A
N
Ecc=
Check M/N
e=
t1/2-ecc
Mt +eN
fcu
fy
cover
t1
d
width
k
z
For b
=
=
=
As
=
As prov =
As
=
-18.02
-88.58
0.02
0.203
0.055
###
kN.m
kN
m
m>e
m
kN.m
0.03
0.15
0.12
1.6
0.028
0.95
114
502
495
792
m
m
-30.89
###
0.02
0.200
###
###
kN.m
kN
m
m>e
m
kN.m
0.03
0.15
0.12
1.5
###
###
114
###
377
565
###
-88585
20
203.46
N.mm
N
mm
mm
### N.m
35
460
30
150
120
1600
m
per m width
* ds
mm
mm2/m
mm2/m CHECK
mm2
7
T
###
###
20
199.74
N/mm2
mm
mm
mm
mm
12
N.mm
N
mm
mm
### N.m
m
m
35
460
30
150
120
1500
N/mm2
12
mm
mm
mm
mm
per m width
* ds
mm
mm2/m
mm2/m
mm2
###
5