Office of the,
Assistant Engineer (P&I)
P&I Sub-Division Sahiwal
Memo No.5
Dated: -
/1/2013
Executive Engineer
P&I Division Sahiwal
Subject: -
Ref: -
It is intimated that undersigned & A.E (T) chicihawatni along with SSO-in
charge calculated 215000 units due to slowness of KWH Meter of city-1 feeder. By
keeping in view, the 11 Kv bus bar losses of I/C-2, reverse polarity of yellow phase C.T
& switching off the P.T during trouble shooting of city-1 outgoing feeder. Before
calculation, the KWH meter was declared 66% slow.KWH unit of city-1 feeder become
223847.7 due to 66% slowness and %age loss of I/C-2 bus bar is within permissible limit . But
after calculation & keeping in view the routine percentage of 11 kv bus bar of incoming
no.2, the 215000 unit was posted and meter was 59.44% slow. The 40% slowness of
KWH meter as mentioned in the letter under reference is a typing mistake.
The calculation of unit is following.
Recorded KWH units of City-1 feeder = 134848
KWH units due to Slowness =1.66 x 134848= 223847.7 (66%)
Now total KWH units of city-1 feeder = 134848+223847= 358695.7
%age loss of I/C-2 bus bar will be = [1648302 (1423756+223847.7)/1648302] x 100 = 0.042%
(Percentage is within permissible limit)
Before fire incident, the %age loss of 11 Kv incoming-2 bus bar was + 1.00%. After
installation of new incoming & their related outgoing feeders, the %age loss of 11 Kv incoming-2
bus bar increased up to 14.17%. After rectify the fault of city-1outgoing feeder, the %age loss of
11 Kv incoming-2 bus bar decrease up to 0.5% which is correct percentage. So,by keeping in
view the percentage of 11 kv incoming-2 bus bar
KWH units due to slowness = 134848 x 1.5944 = 215001.65 = 215000 (59.44%)
Now total KWH units of city-1 feeder = 134848 + 215000 = 349848
%age loss of I/C-2 bus bar will be = [1648302 (1423756+215000)/1648302] x 100 = 0.579%
(By keeping in view the %age of 11 kv i/c-2 bus bar, this % is also within permissible limit)