0% found this document useful (0 votes)
176 views4 pages

Assignment Urban Traffic Impact المصحح

This document discusses a proposed development near the Putrajaya-Kajang highway that consists of an office building and condominium tower. It provides calculations to determine: (1) The production and attraction of trips for the development, which is 3960 person-trips/hour for attraction and 573 person-trips/hour for production. (2) The number of persons entering and exiting is 92 persons/hour. (3) The number of vehicles for each transport mode entering and exiting based on trip distributions of 55% car, 36% bus, and 9% motorcycle. (4) Given 80% of attraction is from Kajang, the minimum bridge width is estimated to be one

Uploaded by

Ameer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
176 views4 pages

Assignment Urban Traffic Impact المصحح

This document discusses a proposed development near the Putrajaya-Kajang highway that consists of an office building and condominium tower. It provides calculations to determine: (1) The production and attraction of trips for the development, which is 3960 person-trips/hour for attraction and 573 person-trips/hour for production. (2) The number of persons entering and exiting is 92 persons/hour. (3) The number of vehicles for each transport mode entering and exiting based on trip distributions of 55% car, 36% bus, and 9% motorcycle. (4) Given 80% of attraction is from Kajang, the minimum bridge width is estimated to be one

Uploaded by

Ameer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Urban Transport Planning

Traffic Impact

Ameer Abdul Adheem Hussein


P81466

PROF. DATO' IR. DR RIZA ATIQ ABDULLAH BIN


O.K. RAHMAT

KA 6563 Assignment 1

A proposed development will be constructed near the Putrajaya-Kajang highway as


shown in Figure 1.
Proposed Development

To Putrajaya

To Kajang

Figure 1
The development consists of an office building with 120,000 square meter floor area
and a 395 units condominium tower.
It is expected will attract 3.3 person-trips per 100 square meter floor area per hour in
the morning, whereas the condominium will produce 1.45 person-trips per unit per
hour. It is estimated that only 16% of the generated trip by the condominium destine
to the office building in the development area.

Mode

Split

Car
Motorcycle
Bus

55%
9%
36%

Average
Capacity
1.9
1.15
50

You are required to:


(a) Compute production and attraction.
(b) Compute the number of persons entering and exiting the development area per
hour in the morning.
(c) Compute the number of each transport mode entering and exiting the
development in the morning.
(d) If 80% of the attraction is from Kajang, determine the minimum width of the
bridge.

Solution \\

(a)
2
The expected = 3.3 persontrip per 100 m

Attraction = (3.3 / 100) * 120000


Attraction =3960 person-trip / hr

The condominium production = 1.45 persontrip per unit / hr


Production =395 * 1.45 person-trip / hr
= 573 person-trip / hr

(b)
The number of person entering & exiting the development area per hour in the
morning is
=573 * (16 / 100) =92 person

Number of person exiting:


Production = 573 92 =481 person-trip / hr
Attraction =3960 92 =3868 person-trip / hr

(c)
Total
3868
481

person-trip * model split


M/c 9%
Bus 36%
Car 55%
348
1392
2128
43
173
265

Person
3868
481

Land use
Attraction
Production

Number of vehicle exiting:


Person-trip = (Attraction * model split), No. of vehicle = person-trip / Average capacity
Person-trip = (Production * model split), No. of vehicle = person-trip / Average capacity
No. of
vehicle
28
1120
303
No. of
vehicle
4
140
38

Pers-trip
1392.5
2127.5
348

Pers-trip
173.16
264.55
43.29

Average
capacity
50
1.9
1.15
Average
capacity
50
1.9
1.15

(d)
For attraction:
(80/100) * 3868 = 3094.4 person-trip / hr

Split

Model

Attraction

36 %
55 %
9%

Bus
Car
M/c

3868

Split

Model

Production

36 %
55 %
9%

Bus
Car
M/c

481

No. of car = 1120 * 0.8 * 1 = 896 cars


No. of bus = 28 * 0.8 * 2.75 = 62 bus
No. of m/c = 303 * 0.8 * 0.33 = 80 M/c
Total = 1038
No. of lane = 1038 / 1800 = 0.576
1 lane width 3.5 m

For production:
No. of car = 140 * 1 = 140 cars
No. of bus = 4 * 2.75 = 11 bus
No. of m/c = 38 * 0.33 = 13 M/c
Total = 164
No. of lane = 164 / 1800 = 0.091
1 lane width 3.5 m
----------------------------------------------------------------------------------------------------------