0% found this document useful (0 votes)
44 views1 page

How To Switch Between Two Projects in Quality Center

To switch between two projects in Quality Center 9.0 or above, select Tools>Change Projects>Select Project to change projects without logging out. In older versions of Quality Center, you need to log off the current project and log back in to the other project to switch between them.

Uploaded by

pavan.kanti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views1 page

How To Switch Between Two Projects in Quality Center

To switch between two projects in Quality Center 9.0 or above, select Tools>Change Projects>Select Project to change projects without logging out. In older versions of Quality Center, you need to log off the current project and log back in to the other project to switch between them.

Uploaded by

pavan.kanti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

How to switch between two projects in Quality Center ?

In QC 9.0 and above you can switch between two projects by select
Tools>Change Projects>Select Project.
In other version , you will need to log-off and log-in again.