Building Structures

Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

Individual component

LING YUAN MING

4A

4B

5A

10

7C
19700

2000

600 1200 1300 500 1200 900

1500

3600

600

1800

1500

3000

1800

I6
H3

H5

H/3-5

H
1700

G-H/3
G2

700

1800

Ff

F-H / 4B

G/2-4B
G-F / 2

1650

3200

1300

17200

550

Ee

Void

F/ 2-5

2500

2000

B
A

Structural First Floor Plan


I had assigned to
a. To analysis minimum 6 beams (each beam must subject to different types of load, i.e. UDL from one or more than one slabs, beam with
point load(s) or combination of UDL and PL )
1) G-F / 2 is UDL type
G

3) F-H / 4B is combination type


F

5) H / 3-5 is combination type

2) G-H / 3 is UDL type


G

4) G / 2-4B is combination type


2

4.4
4B

6) F / 2-5 combination type

4B

b. To analysis minimum 4 columns by using tributary method (from roof to foundation level)
1) G2
2) H3
3) H5

4A 4B

4) I6

57

Roof Floor

Roof Floor

Roof Floor

Roof Floor

First Floor

First Floor

First Floor

First Floor

Ground Floor

Ground Floor

Ground Floor

Ground Floor

LING YUAN MING

0318758

Beam Analysis Calculation


First Floor Beam, F-G / 2
1) Carry Self Weight- Dead Load
2) Slab Dead Load & Live Load
> F-G / 2-4B
3) Brick Wall - Dead Load

-Total Dead Load Diagram


F

G
2.5m

3.0kN/m

DL from Slab F-G / 2-4B

-Dead load on Slab F-G / 2-4B (two way slab)


Load is transferred to beam F-G / 2 in a triangular form. Convert the trianglular
load into UDL.
Dead Load from Slab F-G / 2-4B = Dead load on slab x (Lx/2) x (2/3)
= 3.6
x (2.5m/2) x (2/3)
= 3.0kN/m

8.55kN/m
-Dead load on Brick Wall
Brick Wall Weight = Wall height x thickness x density
Brick Wall Load

= 8.55kN/m

1.08kN/m
-Dead load on Concrete Beam
Beam Self Weight = Beam size x concrete density
Beam Self Weight
= 1.08kN/m
12.63kN/m

Total Dead load

-Total Dead load


Total for dead load for beam F-G / 2 = 3.0kN/m +8.55kN/m + 2.4kN/m + 1.08kN/m
= 12.63kN/m

LING YUAN MING

0318758

-Total Live Load Diagram

G
2.5m

1.5kN/m
-Live load on Slab F-G / 2-4B (two way slab)
Load is transferred to beam F-G / 2 in a triangular form. Convert the triangular
load into UDL.
Live Load from Slab F-G / 2-4B = Live load on slab x (Lx/2) x 2/3
x (2.5m/2) x 2/3
= 1.25kN/m

LL from Slab F-G / 2-4B

1.25kN/m
-Total Live load
Total for beam F-G / 2 = 1.25kN/m

-Total Ultimate Load Diagram


F

G
2.5m

9.912kN/m

Total Ultimate Dead Load

-Total Ultimate Dead load


Apply factor of 1.4 to dead load
Ultimate Dead load for beam F-G / 2 = 12.63kN/m x 1.4
= 17.682kN/m

4kN/m
-Total Ultimate Live load
Apply factor of 1.6 to live load
Total Ultimate Live Load

Ultimate Live load for beam F-G / 2 = 1.25kN/m x 1.6


= 2kN/m

13.912kN/m

Total Ultimate Load

-Total Ultimate load


Combining the ultimate dead load and ultimate live load
Ultimate load for beam beam F-G / 2 = 17.682kN/m + 2kN/m
= 19.682kN/m

LING YUAN MING

0318758

-Ultimate Load Diagram

19.682kN/m

2.5m

Load Diagram
= 2.5(RGy) - 19.682(2.5)(2.5/2)
= 2.5 RGy - 61.506
RGy = 24.6kN

19.682kN/m

G
2.5m

RGy =
24.6kN

RFy =
24.6kN

RFy

= RFy + RGy - 19.682(2.5)


= RFy + 24.6 - 13.912(2.5)
= 24.6kN

24.6kN

Shear Force Diagram


(+)
0kN

0kN

0kN
(-)

24.6kN - (19.682kN/m x 2.5) = -24.6kN

-24.6kN
2.5m

15.375kN-m

Bending Diagram
Positive area:
24.6kN x 1.25m x 1/2 = 15.375kN-m
Negative area:
24.6kN x 1.25m x 1/2 = 15.375kN-m
0kN-m

0kN
E

F
2.5m

Positive Area - Negative Area


= 15.375kN-m - 15.375kN-m
= 0 kN-m

LING YUAN MING

0318758

Beam Analysis Calculation


First Floor Beam, G-H / 3
1) Carry Self Weight- Dead Load
2) Slab Dead Load & Live Load
> G-H/3-4B
3) Brick Wall - Dead Load

-Total Dead Load Diagram


G

H
1.70m

8.55kN/m
-Dead load on Brick Wall
Brick Wall Weight = Wall height x thickness x density
Brick Wall Load

= 8.55kN/m

2.04kN/m
-Dead load on Slab G-H/3-4B (two way slab)
Load is transferred to beam G-H / 3 in a triangular form. Convert the triangle load into
UDL.
Dead Load from Slab G-H/3-4B = Dead load on slab x (Lx/2) x 2/3

DL from Slab G-H/3-4B

= 2.04kN/m
1.08kN/m
-Dead load on Concrete Beam
Beam Self Weight = Beam size x concrete density

Beam Self Weight

= 1.08kN/m
11.67kN/m

Total Dead load

-Total Dead load


Total dead load for beam G-H / 3 = 8.55kN/m + 2.04kN/m + 1.08kN/m
= 11.67kN/m

LING YUAN MING

0318758

-Total Live Load Diagram


H

G
1.70m

1.6kN/m

-Live load on Slab G-H/3-4B (two way slab)


Load is transferred to beam G-H / 3 in a triangular form. Convert the triangle load
into UDL.
Live Load from Slab G-H/3-4B = Live load on slab x (Lx/2) x 2/3

LL from Slab G-H/3-4B

= 0.85kN/m
1.6kN/m

Total Live load

-Total Live load


Total for beam G-H / 3 = 0.85BkN/m

-Total Ultimate Load Diagram


H

G
1.70m

16.338kN/m
-Total Ultimate Dead load
Apply factor of 1.4 to dead load
Total Ultimate Dead Load
Ultimate Dead load for beam G-H / 3 = 11.67kN/m x 1.4
= 16.338kN/m
1.36kN/m

Total Ultimate Live Load

-Total Ultimate Live load


Apply factor of 1.6 to live load
Ultimate Live load for beam G-H / 3 = 0.85kN/m x 1.6
= 1.36kN/m

17.698kN/m
-Total Ultimate load
Combining the ultimate dead load and ultimate live load
Total Ultimate Load
Ultimate load for beam G-H / 3 = 16.338kN/m + 1.36kN/m
= 17.698kN/m

LING YUAN MING

0318758

-Ultimate Load Diagram

17.698kN/m

1.7m

Load Diagram
17.698kN/m

0 = RHy(1.7) - 17.698(1.7)(1.7/2)
RHy = 15.04kN

H
1.7m

RGy
RHy =
15.04kN

RGy =
15.04kN

15.04kN

Shear Force Diagram


15.04kN - (17.698kN/m x 1.7m) = 15.04kN

(+)
0kN

0 = RGy + RHy - 17.698(1.7)


=15.04kN

0kN

0kN
(-)

15.04kN
1.7m

Bending Diagram
6.392kN-m

Positive area:
15.04kN x 0.85m x 1/2 = 6.392kN-m
Negative area:
15.04kN x 0.85m x 1/2 = 6.392kN-m

0kN-m

0kN
G

Positive Area - Negative Area


= 6.392kN-m - 6.392kN-m
= 0 kN-m

H
1.7m

LING YUAN MING

0318758

Beam Analysis Calculation


First Floor Beam, G/2-4B
1) Carry Self Weight- Dead Load
2) Slab Dead Load & Live Load
>Slab F-G / 2-4B
>Slab G-H / 3-4B
3) Brick Wall - Dead Load

-Total Dead Load Diagram


3

2
0.6m

4B
3.0m

8.55kN/m
-Dead load on Brick Wall
Brick Wall Weight = Wall height x thickness x density
Brick Wall Load

= 8.55kN/m

4.5kN/m
-Dead load on Slab F-G / 2-4B (two way slab)
Load is transferred to beam G/2-4B in a trapezoid form. Convert the trapezoid load
into UDL.
Dead Load from Slab F-G / 2-4B = Dead load on slab x (Lx/2)

DL from Slab F-G / 2-4B

= 4.5kN/m
3.06kN/m
-Dead load on Slab G-H / 3-4B (two way slab)
Load is transferred to beam G / 3-4B in a trapezoid form. Convert the trapezoid
load into UDL.
Dead Load from G-H / 3-4B = Dead load on slab x (Lx/2)
x (1.7m/2)
= 3.06kN/m

DL from Slab G-H / 3-4B

1.08kN/m
-Dead load on Concrete Beam
Beam Self Weight = Beam size x concrete density
Beam Self Weight

= 1.08kN/m

14.13kN/m

Total Dead load

17.19kN/m
-Total Dead load
Total for G / 2-3 = 8.55kN/m + 4.5kN/m + 3.96kN/m + 1.08kN/m
= 17.19kN/m
Total for G / 3-4B = 8.55kN/m + 4.5kN/m + 1.08kN/m
= 14.13kN/m

LING YUAN MING

0318758

-Total Live Load Diagram


3

2
0.6m

4B
3.0m

1.875kN/m
Live load on Slab F-G / 2-4B (two way slab)
Load is transferred to beam G / 2-4B in a trapezoid form. Convert the trapezoid load
into UDL.
Live Load from Slab F-G / 2-4B = Live load on slab x (Lx/2)

LL from Slab F-G / 2-4B

= 1.875kN/m
1.275kN/m
-Live load on Slab G-H / 3-4B (two way slab)
Load is transferred to beam G / 3-4B in a trapezoid form. Convert the trapezoid load
into UDL.
Live Load from Slab G-H / 3-4B = Live load on slab x (Lx/2)
x (1.7m/2)
= 1.275kN/m

LL from Slab G-H / 3-4B

1.875kN/m

3.15kN/m

-Total live load


Total for G / 2-3 = 1.875kN/m
Total for G / 3-4B = 1.875kN/m + 1.275kN/m
= 3.15kN/m

Total Live load

-Total Ultimate Load Diagram


3

2
0.6m

19.782kN/m

4B
3.0m

24.066kN/m

Total Ultimate Dead Load

3.00kN/m

5.04kN/m

Ultimate Dead load for G / 2-3 = 14.13kN/m x 1.4


= 19.782kN/m
Ultimate Dead load for G / 3-4B = 17.19kN/m x 1.4
= 24.066kN/m

-Total Ultimate Live load


Apply factor of 1.6 to live load
Ultimate Live load for G / 2-3 = 1.875kN/m x 1.6
= 3.00kN/m
Ultimate Live load for G / 3-4B = 3.15kN/m x 1.6
= 5.04kN/m

Total Ultimate Live Load

22.782kN/m

Total Ultimate Load

-Total Ultimate Dead load


Apply factor of 1.4 to dead load

29.106kN/m

-Total Ultimate load


Combining the ultimate dead load and ultimate live load
Ultimate Load for G / 2-3 = 19.782kN/m + 3.00kN/m
= 22.782kN/m
Ultimate Load for G / 3-4B = 24.066kN/m + 5.04kN/m
= 29.106kN/m

LING YUAN MING

0318758

-Ultimate Load Diagram


3

4B

15.04kN
29.106kN/m

22.782kN/m

Point Load = RGy of beam G-H/ 3 = 15.04

0.6m

3.0m

Load Diagram
15.04kN

= R4By(3.6) - 22.782(0.6)(0.3) - 15.04(0.6)


- 29.106(3)(2.1)
R4By = 54.58kN

29.106kN/m

22.782kN/m

4B

0.6m

3.0m

R4By =
54.58kN

R2y =
61.45kN

0 = R2y + R4Ay - 22.782(0.6) - 15.04


- 29.106(3)
0 = R2y + 54.581 - 22.782(0.6) - 15.04
- 29.106(3)
R2y = 61.45kN

61.45kN
47.78kN

Shear Force Diagram

(+)
32.74kN

(+)
0kN 2

0kN
4B

3
1.7248

61.45kN - (22.782kN/m x 0.6m) = 47.78kN


47.78kN - 15.04kN = 32.74kN
32.74kN - (29.106kN/m x 3.0m) = -54.58kN

(-)

Bending Diagram
-54.58kN
0.6m

3.0m

Positive area:
(61.45kN + 47.78kN) x 0.6m x 1/2 = 32.769kN-m
32.74
x

51.17 kN-m

54.58

32.767 kN-m

x/3.0 = 32.74/ (32.74+54.58)


x = 1.1248m

3.0

1.1248m x 32.74kN x 1/2 = 18.39kN-m


0kN-m

0kN
2

3
0.6m

32.769kN-m + 18.39kN-m = 51.17kN-m

4B
3.0m

Negative area:
54.58kN x (3.0m - 1.1248m) x 1/2 = 51.17kN-m
Positive Area - Negative Area
= 51.17kN-m - 51.17kN-m
= 0 kN-m
LING YUAN MING

0318758

Beam Analysis Calculation


First Floor Beam, F-H / 4B
1) Carry Self Weight- Dead Load
2) Slab Dead Load & Live Load
>Slab F-G / 2-4B
>Slab G-H / 3-4B
>Slab F-H/ 4B-6
3) Brick Wall - Dead Load

-Total Dead Load Diagram


G

F
2.5m

H
1.7m

8.55kN/m
-Dead load on Brick Wall
Brick Wall Weight = Wall height x thickness x density

Brick Wall Load

= 8.55kN/m
3.00kN/m

-Dead load on Slab F-G / 2-4B (two way slab)


Load is transferred to beam F-G / 4B in a triangular form. Convert the triangular
load into UDL.
Dead Load from Slab F-G / 2-4B = Dead load on slab x (Lx/2) x 2/3
x (2.5m/2) x 2/3
= 3.00kN/m

DL from Slab F-G / 2-4B

2.04kN/m

DL from Slab G-H / 3-4B

-Dead load on Slab G-H / 3-4B (two way slab)


Load is transferred to beam G-H / 4B in a triangular form. Convert the triangular
load into UDL.
Dead Load from Slab G-H / 3-4B = Dead load on slab x (Lx/2) x 2/3
x (1.7m/2) x 2/3
= 2.04kN/m

6.48kN/m
-Dead load on Slab F-H/ 4B-6 (two way slab)
Load is transferred to beam F-H / 4B in a trapezoid form. Convert the trapezoid
load into UDL
Dead Load from Slab F-H / 4B-6 = Dead load on slab x (Lx/2)
= 3.6kN/m x (3.6m/2)
= 6.48kN/m

DL from Slab F-H/ 4B-6

1.08kN/m
-Dead load on Concrete Beam
Beam Self Weight = Beam size x concrete density

Beam Self Weight

= 1.08kN/m
19.11kN/m

Total Dead load

9.6kN/m

-Total Dead load


Total for F-G / 4B = 8.55kN/m + 3.00kN/m + 6.48kN/m + 1.08kN/m
= 19.11kN/m
Total for G-H / 4B = 2.04kN/m + 6.48kN/m + 1.08kN/m
= 9.6kN/m

LING YUAN MING

0318758

-Total Live Load Diagram


G

2.5m

1.7m

1.25kN/m

-Live load on Slab F-G / 2-4B (two way slab)


Load is transferred to beam F-G / 4B in a triangular form. Convert the triangular
load into UDL.
Live Load from Slab F-G / 2-4B = Live load on slab x (Lx/2) x 2/3
x (2.5m/2) x 2/3
= 1.25kN/m

LL from Slab F-G / 2-4B

0.85kN/m
-Live load on Slab G-H / 3-4B (two way slab)
Load is transferred to beam G-H / 4B in a triangular form. Convert the triangular
load into UDL.
Live Load from Slab G-H / 3-4B = Live load on slab x (Lx/2) x 2/3
= 1.5
x (1.7m/2) x 2/3
= 0.85kN/m

LL from Slab G-H / 3-4B

2.7kN/m
-Live load on Slab F-H/ 4B-6 (two way slab)
Load is transferred to beam F-H / 4B in a trapezoid form. Convert the trapezoid
load into UDL.
Live Load from Slab F-H / 4B-6 = Live load on slab x (Lx/2)
= 1.5kN/m x (3.6m/2)
= 2.7kN/m

LL from Slab F-H/ 4B-6

3.95N/m

3.55kN/m
-Total Live load
Total for F-G / 4B = 1.25kN/m + 2.70kN/m
= 3.95kN/m
Total for G-H / 4B = 0.85kN/m + 2.70kN/m
= 3.55kN/m

Total Live load

-Total Ultimate Load Diagram


G

F
2.5m

26.75kN/m

H
1.7m

13.44kN/m

Ultimate Dead load for F-G / 4B = 19.11kN/m x 1.4


= 26.754kN/m
Ultimate Dead load for G-H / 4B = 9.6kN/m x 1.4
= 13.44kN/m

Total Ultimate Dead Load

6.32N/m

5.68kN/m

-Total Ultimate Live load


Apply factor of 1.6 to live load
Ultimate Live load for F-G / 4B = 3.95kN/m x 1.6
= 6.32kN/m
Ultimate Live load for G-H / 4B = 3.55kN/m x 1.6
= 5.68kN/m

Total Ultimate Live Load

33.074N/m
19.12N/m
Total Ultimate Load

-Total Ultimate Dead load


Apply factor of 1.4 to dead load

-Total Ultimate load


Combining the ultimate dead load and ultimate live load
Ultimate Load for F-G / 4B = 26.75kN/m + 6.32kN/m
= 33.074kN/m
Ultimate Load for G-H / 4B = 13.44kN/m + 5.68kN/m
= 19.12kN/m

LING YUAN MING

0318758

-Ultimate Load Diagram


H

54.58kN
33.074kN/m
19.12kN/m

2.5m

Point Load from beam G / 2-4B = R4By = 54.58kN

1.7m

Load Diagram

54.58kN

0 = RHy(4.2) - 33.074(2.5)(2.5/2) - 54.58(2.5) 19.12(1.7)(3.35)


RHy = 83.023kN

33.074kN/m
19.12kN/m

2.5m

1.7m

RFy =
86.746kN

0 = RFy + 83.023 - 33.074(2.5) - 54.58 - 19.12(1.7)


RFy = 86.746kN

RHy =
83.023kN

86.746kN

Shear Force Diagram


86.746kN - (33.074kN/m x 2.5m) = 4.061kN
4.061kN - 54.58kN = -50.519kN
-50.519kN - (19.12kN/m x 1.7m) = -83.023kN

(+)
4.061kN
0kN F

0kN
H

G
(-)

-50.519kN
-83.023kN
2.5m

1.7m

Bending Diagram
Positive area:
(86.746kN + 4.061kN) x 2.5m x 1/2 = 113.51kN-m

113.51kN-m

Negative area:
(50.519kN + 83.023kN) x1.7m x 1/2 = 113.51kN-m

0kN-m

0kN
F

G
2.5m

Positive Area - Negative Area


= 113.51kN-m - 113.51kN-m
= 0 kN-m

H
1.7m

LING YUAN MING

0318758

Beam Analysis Calculation


First Floor Beam, H / 3-5
1) Carry Self Weight- Dead Load
2) Slab Dead Load & Live Load
>Slab G-H / 3-4B
>Slab F-H/ 4B-6
3) Brick Wall - Dead Load

-Total Dead Load Diagram


3

4B
3.0m

1.2m

8.55kN/m
-Dead load on Brick Wall
Brick Wall Weight = Wall height x thickness x density
Brick Wall Load

= 8.55kN/m

3.06kN/m
-Dead load on Slab G-H / 3-4B (two way slab)
Load is transferred to beam H / 3-4B in a trapezoid form. Convert the trapezoid load
into UDL.
Dead Load from Slab G-H / 3-4B = Dead load on slab x (Lx/2)
x (1.7m/2)
= 3.06kN/m

DL from Slab G-H / 3-4B

4.32kN/m
-Dead load on Slab F-H/ 4B-6 (two way slab)
Load is transferred to beam H / 4B-5 in a triangular form. Convert the triangular load
into UDL.
Dead Load from Slab F-H/ 4B-6 = Dead load on slab x (Lx/2) x 2/3
x (3.6m/2) x 2/3
= 4.32kN/m

DL from Slab F-H/ 4B-6

1.08kN/m

-Dead load on Concrete Beam


Beam Self Weight = Beam size x concrete density
Beam Self Weight
= 1.08kN/m

12.69kN/m

Total Dead load

13.95kN/m
-Total Dead load
Total dead load for beam H / 3-4B = 8.55kN/m + 3.06kN/m + 1.08kN/m
= 12.69kN/m
Total dead load for beam H / 4B-5 = 8.55kN/m + 4.32kN/m + 1.08kN/m
= 13.95kN/m

LING YUAN MING

0318758

-Total Live Load Diagram


3

4B
3.0m

1.2m

1.275kN/m

-Live load on Slab G-H / 3-4B (two way slab)


Load is transferred to beam H / 3-4B in a trapezoid form. Convert the trapezoid load
into UDL.
Live Load from Slab G-H / 3-4B = Live load on slab x (Lx/2)
x (1.7m/2)
= 1.275kN/m

LL from Slab G-H / 3-4B

1.8kN/m

-Live load on Slab F-H/ 4B-6 (two way slab)


Load is transferred to beam H / 4B-5 in a triangular form. Convert the triangular load
into UDL.
Live Load from Slab F-H/ 4B-6 = Live load on slab x (Lx/2) x 2/3
x (3.6m/2) x 2/3
= 1.8kN/m

LL from Slab F-H/ 4B-6

1.275kN/m

1.8kN/m
-Total Live load
Total live load for beam H / 3-4B = 1.275kN/m
Total live load for beam H / 4B-5 = 1.8kN/m

Total Live load

-Total Ultimate Load Diagram


3

4B
3.0m

17.766kN/m

1.2m

19.53kN/m

Ultimate Dead load for H / 3-4B = 12.69kN/m x 1.4


= 17.766kN/m
Ultimate Dead load for H / 4B-5 = 13.95kN/m x 1.4
= 19.53kN/m

Total Ultimate Dead Load

2.04N/m

2.88kN/m
-Total Ultimate Live load
Apply factor of 1.6 to live load

Total Ultimate Live Load

Ultimate Live load for H / 3-4B = 1.275kN/m x 1.6


= 2.04kN/m
Ultimate Live load for H / 4B-5 = 1.8kN/m x 1.6
= 2.88kN/m
19.806kN/m

Total Ultimate Load

-Total Ultimate Dead load


Apply factor of 1.4 to dead load

22.41kN/m

-Total Ultimate load


Combining the ultimate dead load and ultimate live load
Ultimate Load for H / 3-4B = 17.766kN/m + 2.04kN/m
= 19.806kN/m
Ultimate Load for H / 4B-5 = 19.53kN/m + 2.88kN/m
= 22.41kN/m

LING YUAN MING

0318758

-Ultimate Load Diagram


3

4B

83.023kN
22.41kN/m
19.806kN/m

Point Load from beam F-H / 4B = RHy = 83.023kN

3.0m

1.2m

4B

Load Diagram

83.023kN

0 = R5y(4.2) - 19.806(3.0)(1.5) - 83.032(3)


- 22.41(1.2)(3.6)
R5y = 103.573 kN

22.41kN/m
19.806kN/m

4B
3.0m

5
1.2m

0 = R3y + 103.573 -19.806(3.0) - 83.023 -22.41(1.2)


R3y = 65.76 kN

R5y =
103.75kN

R3y =
65.76kN

65.76
kN

Shear Force Diagram


65.76kN - (19.806kN/m x 3.0m) = 6.342kN
6.342kN - 83.023kN = -76.681kN
-76.681kN - (22.41kN/m x 1.2m) = -103.573kN

(+)
6.342kN
0kN
3

0kN

4B

5
(-)

-76.681kN
-103.573kN
3.0m

1.2m

Bending Diagram
108.15kN-m

Positive area:
(65.76kN + 6.342kN) x 3.0m x 1/2 = 108.15kN
Negative area:
(76.681kN + 103.573kN) x 1.2m x 1/2 = 108.15kN
0kN-m

0kN
3

4B
3.0m

5
1.2m

Positive Area - Negative Area


= 84.58kN-m - 84.58kN-m
= 0 kN-m

LING YUAN MING

0318758

Beam Analysis Calculation


First Floor Beam, F / 2-5
1) Carry Self Weight- Dead Load
2) Slab Dead Load & Live Load
>Slab E-F / 2-4A
>Slab D-F / 4A-5A
>Slab F-G / 2-4B
>Slab F-H / 4B-6
3) Brick Wall - Dead Load

-Total Dead Load Diagram


2

4A
3.1m

4B

0.5m

1.2m

8.55kN/m
-Dead load on Brick Wall D / 2-3
Brick Wall Weight = Wall height x thickness x density

Brick Wall Load

= 8.55kN/m
3.96kN/m
-Dead load on Slab E-F / 2-4A (two way slab)
Load is transferred to beam F / 2-4A in a trapezoid form. Convert the trapezoid
load into UDL.
Dead Load from Slab E-F / 2-4A = Dead load on slab x (Lx/2)
= 3.6kN/m x (2.2m/2)
= 3.96kN/m

DL from Slab E-F / 2-4A

3.12kN/m

DL from Slab D-F / 4A-5A

-Dead load on Slab D-F / 4A-5A (two way slab)


Load is transferred to beam F / 4A-5A in a triangular form. Convert the triangle load
into UDL.
Dead Load from Slab D-F / 4A-5A = Dead load on slab x (Lx/2) x 2/3
x (2.6m/2) x 2/3
= 3.12kN/m

4.5kN/m
-Dead load on DL from Slab F-G / 2-4B (two way slab)
Load is transferred to beam F / 2-4B in a trapezoid form. Convert the trapezoid
load into UDL.
Dead Load from DL from Slab F-G / 2-4B = Dead load on slab x (Lx/2)
= 3.6kN/m x (2.5m/2)
= 4.5kN/m

DL from Slab F-G / 2-4B

4.32kN/m
-Dead load on Slab F-H / 4B-6 (two way slab)
Load is transferred to beam F / 4B-6 in a triangular form. Convert the triangle load
into UDL.
Dead Load from Slab F-H / 4B-6 = Dead load on slab x (Lx/2) x 2/3
x (3.6m/2) x 2/3
= 4.32kN/m

DL from Slab F-H / 4B-6

1.08kN/m
-Dead load on Concrete Beam
Beam Self Weight = Beam size x concrete density

Beam Self Weight

= 1.08kN/m
17.25kN/m
18.09kN/m

Total Dead load

17.07kN/m
-Total Dead load
Total dead load for beam F / 2-4A = 8.55kN/m + 3.96kN/m + 4.5kN/m +1.08kN/m
= 18.097kN/m
Total dead load for beam F / 4A-4B = 8.55kN/m + 3.12kN/m + 4.5kN/m + 1.08kN/m
= 17.25kN/m
Total dead load for beam F / 4B-5 = 8.55kN/m + 3.12kN/m + 4.32kN/m + 1.08kN/m
= 17.07kN/m

LING YUAN MING

0318758

-Total Live Load Diagram


2

4A
3.1m

4B
0.5m

1.2m

-Live load on Slab E-F / 2-4A (two way slab)


Load is transferred to beam F / 2-4A in a trapezoid form. Convert the trapezoid load
into UDL.
Live Load from Slab E-F / 2-4A = Live load on slab x (Lx/2)
= 1.5kN/m x (2.2m/2)
= 1.65kN/m

1.65kN/m

LL from Slab E-F / 2-4A

-Live load on Slab D-F / 4A-5A (two way slab)


Load is transferred to beam F / 4A-5A in a triangular form. Convert the triangle load
into UDL.
Live Load from Slab D-F / 4A-5A = Live load on slab x (Lx/2) x 2/3
x (2.6m/2) x 2/3
= 1.3kN/m

1.3kN/m

LL from Slab D-F / 4A-5A

-Live load on DL from Slab F-G / 2-4B (two way slab)


Load is transferred to beam F / 2-4B in a trapezoid form. Convert the trapezoid load
into UDL.
Live Load from DL from Slab F-G / 2-4B = Live load on slab x (Lx/2)
= 1.5kN/m x (2.5m/2)
= 1.875kN/m

1.875kN/m

LL from Slab F-G / 2-4B

-Live load on Slab F-H / 4B-6 (two way slab)


Load is transferred to beam F / 4B-6 in a triangular form. Convert the triangle load
into UDL.
Live Load from Slab F-H / 4B-6 = Live load on slab x (Lx/2) x 2/3
x (3.6m/2) x 2/3
= 1.8kN/m

1.8kN/m

LL from Slab F-H / 4B-6

3.525kN/m

-Total Live load


Total live load for beam F / 2-4A = 1.65kN/m + 1.875kN/m
= 3.525kN/m
Total live load for beam F / 4A-4B = 1.3kN/m + 1.875kN/m
= 3.175kN/m
Total live load for beam F / 4B-5 = 1.3kN/m + 1.8kN/m
= 3.1kN/m

3.1kN/m
3.175kN/m

Total Live
load
-Total
Ultimate
Load Diagram
-Total Ultimate Dead load
Apply factor of 1.4 to dead load

4A
3.1m

25.336kN/m

4B
0.5m

1.2m

24.15kN/m
23.898kN/m

Total Ultimate Dead Load

Ultimate Dead load for 2-4A = 18.097kN/m x 1.4


= 25.336kN/m
Ultimate Dead load for 4A-4B = 17.25kN/m x 1.4
= 24.15kN/m
Ultimate Dead load for 4B-5 = 17.07kN/m x 1.4
= 23.898kN/m
-Total Ultimate Live load
Apply factor of 1.6 to live load
Ultimate Live load for 2-4A

5.64kN/m

5.08kN/m
4.96kN/m

= 3.525kN/m x 1.6
= 5.64kN/m
Ultimate Live load for 4A-4B = 3.175kN/m x 1.6
= 5.08kN/m
Ultimate Live load for 4B-5 = 3.1kN/m x 1.6
= 4.96kN/m

Total Ultimate Live Load


-Total Ultimate load
Combining the ultimate dead load and ultimate live load
30.976kN/m

29.23kN/m
28.858kN/m

Total Ultimate Load

Ultimate Load for 2-4A = 25.336kN/m + 5.64kN/m


= 30.976kN/m
Ultimate Load for 4A-4B = 24.15kN/m + 5.08kN/m
= 29.23kN/m
Ultimate Load for 4B-5 = 23.898kN/m + 4.96kN/m
= 28.858kN/m
LING YUAN MING

0318758

-Ultimate Load Diagram


4A

4B

72.8kN/m
30.976kN/m

86.746kN/m

29.23kN/m
28.858kN/m
Point Load from beam F-H/ 4B = RFBy = 86.746kN
Point Load from beam D-F / 4A = RF4Ay = 72.8kN

3.1m

0.5m

1.2m

Load Diagram
72.8kN/m
30.976kN/m

86.746kN/m

0 = R5y (4.8) - 30.976(3.1)(3.1/2) - 72.8(3.1) 29.23(0.5)(3.35) - 86.746(3.6) - 28.858(1.2)(4.2)


R5y = 183.585kN

29.23kN/m
28.858kN/m

4A
3.1m

4B
0.5m

5
1.2m

R5y =
183.585kN

R2y =
121.2312kN

0 = R2y + 183.585 - 30.976(3.1) - 72.8 - 29.23(0.5)


- 86.746 - 28.858(1.2)
R2y = 121.2312kN

121.2312kN

Shear Force Diagram

(+)

25.2056kN
0kN

0kN
2

4A

4B

121.2312kN - (30.976kN/m x 3.1m) = 25.2056kN


25.2056kN - 72.8kN = -47.5944kN
-47.5944kN - (29.23kN/m x 0.5m) = -62.2094kN
-62.2094kN - 86.746kN = -148.9554kN
-148.9554kN - (28.848kN/m x 1.2m) = -183.585kN

(-)
-47.5944kN

-62.2094kN
(-)

-148.9554kN
3.1m

0.5m

1.2m

-183.585kN

Bending Diagram
Positive area:
(121.2312kN + 25.2056kN) x 3.1m x 1/2 =
226.98kN-m

226.98 kN-m

0kN-m

0kN
2

4A
3.1m

4B
0.5m

5
1.2m

Negative area:
(47.5944kN + 62.2094kN) x 0.5m x 1/2 = 27.452kN-m
(148.9554kN + 183.585kN) x 1.2m x 1/2 =
199.524kN-m
27.452kN-m + 199.524kN-m = 226.98kN-m
Positive Area - Negative Area
= 226.98kN-m - 226.98kN-m
= 0 kN-m

LING YUAN MING

0318758

Column Analysis Calculation


Tributary Area Method (Live Load Only)
To determine 4 columns: D1 , F1, D2, F2
1

10

600
2000 1200 3000

H
G

E
D

17200

2400 1500

3000

GF I6
GF H3

GF H5

GF G2

3200 1300 2200

2500 1700 1800

19700
2400
3600

2500

2000

B
A

Ground Floor Plan


(Showing Distribution of load from slab to column)

Column

Area

Live Load

GF G2

(2.7m x 1.25m) + (2.1m x 0.85m) = 5.16m

GF H3

0.85m x 2.1m= 1.785m

1.785m
2.678kN

GF H5

(2.4m x 2.1m) + (0.9m x 1.7m) + (0.9m x 0.5m) =


6.93m

6.93m
10.395kN

GF I6

(3.0m x 0.9m) = 2.7m

5.16m
7.74kN

2.7m
6.75kN

LING YUAN MING

0318758

-Total Live Load Diagram


1

10

600
2000 1200 3000

H
G

E
D

17200

2400 1500

3000

FF I6
FF H3

FF H5

FF G2

3200 1300 2200

2500 1700 1800

19700
2400
3600

B
A

2000

2500

First Floor Plan


(Showing Distribution of load from slab to column)

Column

Area

Live Load

FF G2

(2.7m x 1.25m) + (2.1m x 0.85m) = 5.16m

FF H3

0.85m x 2.1m= 1.785m

1.785m
2.678kN

FF H5

(2.4m x 2.1m) + (0.9m x 1.7m) + (0.9m x 0.5m) =


6.93m

6.93m
10.395kN

FF I6

(3.0m x 0.9m) = 2.7m

5.16m
7.74kN

2.7m
4.05kN

LING YUAN MING

0318758

-Total Live Load Diagram

10

600
2000 1200 3000

H
G

E
D

17200

2400 1500

3000

RF I6
RF H3

RF H5

RF G2

3200 1300 2200

2500 1700 1800

19700
2400
3600

B
A

2000

2500

Roof Floor Plan


(Showing Distribution of load from slab to column)

There were no live load on roof floor plan.


Column

Area

RF G2

(2.7m x 1.25m) + (0.85m x 2.1m) = 5.16m

Live Load
5.16m
0kN
1.785m

RF H3

0kN

RF H5

3.3m x 2.1m = 6.93m

RF I6

(3.0m x 0.9m) = 2.7m

6.93m
0kN
2.7m

LING YUAN MING

0318758

Column Analysis Calculation


Tributary Area Method
Column G2

Determine the load acting on column G2


1

10

Dead Load

Roof Level
Dead Load
Slab
Roof Beam
Total

H
G

GF G2

2.7m x 1.08kN/m = 2.92 kN


8.08 kN

E
D

First Floor
Dead Load
Walls
Slabs
Beams
Column
Total

B
A

Ground Floor Plan

10

I
H
G

FF G2

Ground Floor
Dead Load
Walls
Slabs
Beams
Column
Total

4.80m x 8.55kN/m = 41.04kN


4.80m x 1.08kN/m = 5.18kN
0.3m x 0.4m x3m x 24kN/m3 = 8.64kN
73.44kN

4.80m x 8.55kN/m = 41.04kN


4.80m x 1.08kN/m = 5.18kN
0.3m x 0.4m x3m x 24kN/m3 = 8.64kN
73.44kN

Total Dead Load


E
D

Apply 1.4 Factor

8.08kN + 73.44kN + 73.44kN


= 154.96kN
154.96kN x 1.4 = 216.94kN

Live Load

First Floor Plan

10

First Floor
Live Load
Slabs

5.16m

I
H
G

RF G2

Ground Floor
Live Load
Slabs
Total Live Load
Apply 1.6 Factor

5.16m
7.74kN + 7.74kN = 15.48kN
15.48kN x 1.6 = 24.77kN

E
D

Total Ultimate Dead load + Ultimate Live load


216.94kN + 24.77kN
= 241.71kN

So, ultimate load acting on column G2 is 241.71kN


Roof Floor Plan

LING YUAN MING

0318758

Column Analysis Calculation


Tributary Area Method
Column H3

Determine the load acting on column H3


1

10

Dead Load

Roof Level
Dead Load
Slab
Roof Beam
Total

I
H

GF H3

2.95m x 1.08kN/m = 3.19kN


4.98kN

E
D

First Floor
Dead Load
Walls
Slabs
Beams
Column
Total

B
A

Ground Floor Plan

10

I
H

FF H3

Ground Floor
Dead Load
Walls
Slabs
Beams
Column
Total
Total Dead Load

E
D

Apply 1.4 Factor

2.95m x 8.55kN/m = 25.22kN


2.95m x 1.08kN/m = 3.19kN
0.3m x 0.4m x3m x 24kN/m3 = 8.64kN
43.48kN

2.95m x 8.55kN/m = 25.22kN


2.95m x 1.08kN/m = 3.19kN
0.3m x 0.4m x3m x 24kN/m3 = 8.64kN
43.48kN
43.48kN + 43.48kN + 4.98kN
= 91.94kN
91.94kN x 1.4 = 128.72kN

Live Load

First Floor Plan


1

10

First Floor
Live Load
Slabs

1.785m

Ground Floor
Live Load
Slabs

1.785m

Total Live Load


Apply 1.6 Factor

2.678kN + 2.678kN = 5.36kN


5.36kN x 1.6 = 8.58kN

I
H

RF H3

B
A

Total Ultimate Dead load + Ultimate Live load


128.72kN + 8.58kN
= 137.30kN
So, ultimate load acting on column H3 is 137.30kN

Roof Floor Plan

LING YUAN MING

0318758

Column Analysis Calculation


Tributary Area Method
Column H5

Determine the load acting on column H5


1

10

Dead Load

Roof Level
Dead Load
Slab
Roof Beam
Total

GF H5
H
G

3.3m x 1.08kN/m = 3.56kN


10.49 kN

E
D

First Floor
Dead Load
Walls
Slabs
Beams
Column
Total

B
A

Ground Floor Plan

10

FF H5
H
G

Ground Floor
Dead Load
Walls
Slabs
Beams
Column
Total
Total Dead Load

E
D

Apply 1.4 Factor

4.60m x 8.55kN/m = 39.33kN


6.30m x 1.08kN/m = 6.80kN
0.3m x 0.4m x3m x 24kN/m3 = 8.64kN
79.72kN

5.10m x 8.55kN/m = 43.61kN


7.50m x 1.08kN/m = 8.10kN
0.3m x 0.4m x3m x 24kN/m3 = 8.64kN
85.30kN
10.49kN + 79.72kN + 85.30kN
= 175.51kN
175.51kN x 1.4 = 245.71kN

Live Load

First Floor
Live Load
Slabs

First Floor Plan

RF H5
H
G

6.93m

10

Ground Floor
Live Load
Slabs
Total Live Load
Apply 1.6 Factor

6.93m
10.395kN + 10.395kN = 20.79kN
20.79kN x 1.6 = 33.26kN

E
D

B
A

Roof Floor Plan

Total Ultimate Dead load + Ultimate Live load


245.71kN + 33.26kN
= 278.97kN
So, ultimate load acting on column H5 is 278.97kN
LING YUAN MING

0318758

Column Analysis Calculation


Tributary Area Method
Column I6

Determine the load acting on column I6


1

10

Dead Load

GF I6

I
H
G

Roof Level
Dead Load
Slab
Roof Beam
Total

2.70
3.90m x 1.08kN/m = 4.21kN
6.91kN

First Floor
Dead Load
Walls
Slabs
Beams
Column
Total

0 x 8.55kN/m =
0kN
2.7
3.9m x 1.08kN/m = 4.21kN
0.3m x 0.4m x3m x 24kN/m3 = 8.64kN
22.57kN

E
D

B
A

Ground Floor Plan

10

FF I6

I
H
G

Ground Floor
Dead Load
Walls
Slabs
Beams
Column
Total

0 x 8.55kN/m =

0kN

2.7
3.9m x 1.08kN/m = 4.21kN
0.3m x 0.4m x3m x 24kN/m3 = 8.64kN
22.57kN

Total Dead Load


E
D

Apply 1.4 Factor

6.91kN + 22.57kN + 22.57kN


= 52.05kN
52.05kN x 1.4 = 72.87kN

Live Load

First Floor Plan


1

10

First Floor
Live Load
Slabs

2.7m

Ground Floor
Live Load
Slabs

2.7m

I
H

RF I6

Total Live Load


Apply 1.6 Factor

4.05kN + 6.75kN = 10.80kN


10.80kN x 1.6 = 17.28kN

Total Ultimate Dead load + Ultimate Live load


72.87kN + 17.28kN
= 90.15kN

So, ultimate load acting on column I6 is 90.15kN


Roof Floor Plan

LING YUAN MING

0318758