2 Site Plan
2 Site Plan
2 Site Plan
PROJECT:
SMART RESIDENTIAL
BIMODAL SYSYEM
TOP VIEW
PROPERTY OF:
POWER SYSTEM
EVOLUTION
ADDRESS:
C1 H9 HILLSIDE SAN
JUAN, P.R.
LOT
NEIGHBOR
SHEET TITLE:
LOCATION:
PREPA ACCOUNT #
6031032406
HOME OWNER:
PREPA METER #
00002883323
51.5'
SITE PLAN
SCALE:
NOT SCALE
DRAWING BY:
COORDINATES:
SHEET NO:
2-9
32.5'
DRAWING NO:
3.0'
E-1
24.0'
URB.HILLSIDE
CALLE 1
SAN JUAN, P.R.
32.5'
LEGEND:
Important notes
TRINA SOLAR TSM-PA05 250W, (29) MODULES IN 3 ARRAYS. ONE ARRAY OF 9 MODULE
AND 2 WITH 10 MODULE EACH ONE, FOR A TOTAL CAPACITY OF 7.25KW DC.. RACKING,
SNAP AND RACK SYSTEM. ARRAY TILT, BETWEEN 15 DEGREE EACH ARRAY.
3.0'
5.5'
29.25'
5.5'
34.4'
M
EXISTING
ELECTRICAL
PANEL
(INDOOR)
TREE
5.5'
15.0'
SOLAR SYSTEM
TSM-PA05 250W
29 MODULES OF 250 W
TOTAL POWER 7.25 kW
11.6'
DESIGNER'S CERTIFICATION
PREPA
METER WITH
MAIN
BREAKER
(INDOOR)
1. I certify that I am a licensed engineer or archited member of the collage of my profession and
authorized by this project's owner to present these construction plans to PREPA.
2. In compliance with Law No. 7 of July 19, 1985, as amended, known as
Certification Law, I certify that I prepared the electric design of this project following all codes,
standards, norms and regulation approved by PREPA. Puerto Rico Planning Board and Permits and
Regulation.
21.0'
DATE:
__________________
__________ ___________________________
LIC. NO: __________________
DESIGNER'S SIGNATURE
__________________________________________________________________________________
WIND SYSTEM
TOTAL POWER 1.0 kW
35.0'
PREPA BIMODAL
SYSTEM
DISCONNECT UNIT
(OUTDOOR)
DATE: _______________________
1. PREPA endorses the electric design shown in these construction plans based on the certification
presented by the designer in compliance with Law No. 7 of July 19, 1985 as emended.
2. PREPA does not assume responsibility over the certified design. PREPA's endorsement does not
relieve the designer from the professional responsibility assumed with the certification on these
project's plans. This endorsement receives neither the builder nor private inspector from compliance
with standing dispositions from National Electric Code; National Electric Safety Code, construction
standards, norms and regulation from PREPA and other government agencies as well as federal and
state laws ruling by the time construction begin.
LOT
NEIGHBOR
3. This endorsement is valid for one year. If electrical works have begun during this year, with prior
notification to PREPA, the endorsement will still be valid until work's completion. In case there is not
certified electrical work during a twelve month period, this endorsement will lose its validity.
__________________________________________________________________________________
OBSERVATIONS
1) RELOCATION OF EXISTING LINES AND WORK IN CONNECTION WITH ENERGIZED LINES
WILL BE DONE BY PREPA WITH THE SOLICITOR PAYING THE COST AS INCURRED WITH
PREVIOUS NOTIFICATION BY THE BUILDER, THE ABOVE MENTIONED WORK SHOULD BE
COMPLETED BEFORE COMMENCING THE WORK OF CONSTRUCTIONG THE PROJECT.
2) THE APPROVAL OF THESE PLANS BY THE AUTHORITY DOES NOT RELIVE THE BUILDER
OF COMPLYING WITH EACH AND ALL OF THE REQUISITES ESTABLISHED BY THE NATIONL
ELECTRIC CODE AND THE REGULATION OF THE PUERTO RICO ELECTRIC AUTHORITY.
3) THE APPROBAL OF THESE PLANS IS ON THE CONDITION THAT THE AUTHORITY BE
CONSULTED ON THE CONDITION OF THE ELECTRICAL SERVICE AT THE TIME OF
BEGINNING CONSTRUCTION.