0% found this document useful (0 votes)
56 views1 page

(There Are 3 Correct Answers To This Question) .: Questions

The document contains 5 multiple choice questions with 3 correct answers each about SAP sales and distribution concepts. Question 1 asks about availability check configuration and transaction assignment. Question 2 asks about factors considered in backwards scheduling for delivery dates. Question 3 asks where the extent of BOM explosion is defined for sales documents.

Uploaded by

Prasanth Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views1 page

(There Are 3 Correct Answers To This Question) .: Questions

The document contains 5 multiple choice questions with 3 correct answers each about SAP sales and distribution concepts. Question 1 asks about availability check configuration and transaction assignment. Question 2 asks about factors considered in backwards scheduling for delivery dates. Question 3 asks where the extent of BOM explosion is defined for sales documents.

Uploaded by

Prasanth Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Questions

1. Which of the following statements are true?


(There are 3 correct answers to this question).
a. The criteria for an availability check can be configured according to the
transaction being used
b. A transaction variant can be assigned to multiple transactions
c. Availability check is carried out at plant level
d. In cash order processing, an invoice document can be printed from the sales
document
e. A billing document can have multiple payers
2. SAP uses backwards scheduling to determine the delivery pick/pack date. Which
of the following does it consider?
(There are 3 correct answers to this question).
a. Transit Time
b. Transportation Planning time
c. Replenishment lead time
d. Incoming purchase orders
e. Loading Time
3. To determine how far the BOM structure should be exploded in the sales
document, where do you need to define the extent of the structure?
a. Sales document type
b. Sales item category
c. Schedule line Category
d. Delivery document type
e. Copying control
The Ultimate SD Sample Questions

You might also like