Annna Water and Sewer Authority !ar Hollow Line Repairs As of May 13, 2008

The document lists repairs and maintenance activities on the Sugar Hollow water pipeline from April 1982 to May 2008. It includes replacing leaking valves, cleaning iron deposits, repairs from breaks at various locations, and replacing sections of pipeline. The most expensive repair was in September 2004 which cost $197,981 to repair a major line break.

Uploaded by

readthehook
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Annna Water and Sewer Authority !ar Hollow Line Repairs As of May 13, 2008

The document lists repairs and maintenance activities on the Sugar Hollow water pipeline from April 1982 to May 2008. It includes replacing leaking valves, cleaning iron deposits, repairs from breaks at various locations, and replacing sections of pipeline. The most expensive repair was in September 2004 which cost $197,981 to repair a major line break.

Uploaded by

readthehook
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

'annna Water and Sewer Authority

!ar Hollow Line. Repairs as of May 13, 2008

Note: Repairs older than five years are estimated dates/costs

• Major Sugar Hollow break repair due to load on exposed pipe: April 1982
• Replaced leaking relief valves: Summer 1988
• Cleaning of iron deposits on interior ofline: Summer 1989
• Replaced leaking relief valves: Summer 1989
• Cleaning of iron deposits on interior ofline: March 1991
• . Replaced 10' section of6" blow-offpipe at Mechum's River: January 1994.
• Replaced leaking relief valves: Fall 1994
• Replaced leaking relief valves: Fall 1995.
• Lead joint leak just below dam on pipeline: October 1995
• Repair pipeline valves (parts $349): April 1996
• Repair pipeline break at Ivy (parts $ 1,514):September 1996
• Line Break at Pea Ridge: December 1996/Jan 1997
• Replaced blow-off valve at Heskel Lane: December 1996/January 1997
• Repaired pipeline break at Ivy: May 1997
• Repairs at Pea Ridge on pipeline (parts: $578):June 1997 ·
• . Installation Mvalve vault at Caretaker's house on SH pipeline (parts $3,231): July 1997
• Repaired broken tap at Heskel Lane: Spring of ~998
• Replaced Sugar Hollow intake gate valve (parts: $4,352): October 2000 ..
• Replaced leaking,relief valves (parts: $ 1,408): April 2001 ' ~ . ~. . l ' ~. .

• Replaced couplihgs' & gaskets (parts: $1,330) May and October 2001 ' ,". f , . •

• Replaced leaking'reliefvalves (parts:$2,816):October2:001 • .


• Cleaning of iron deposits on interior ofline: Sept 2003 •
• Repair of broken pipeline cleaning receiving pit valves: Sept 2003 ..
• Replaced pipeline couplings: (parts:$2,520): October 2003 •
• Major line break on September 11,2004 ($197,981)
• Replaced blow-off valve at Mechums River: Spring of2005 .
• Replaced leaking relief valves (parts:$1,263): June 2005 •
• Replaced bell joint clamp (parts:$469): October 2005 •
• SH line relocated at Hereford Drive: May 2007-By UV A '
• Replaced leaking relief valves (parts: $894): September 2007 .
• Line break repair at Buckingham Circle: January 2008 (parts & labor: $2,455)
• Replaced leaking relief valves: Apri12008 (parts & labor: $7,760)