CEM417 - Group-Of-2 - Project No 2

This document outlines the topics to be covered in a group assignment on highway construction from January to April 2011. It discusses the construction stages of a highway project, methods for repairing road pavement deterioration including pictures, and the types and functions of stationary and moving machines used on construction sites. It also defines temporary and permanent works in construction, providing examples of each. Finally, it lists additional topics to be covered, including sustainable development, infrastructure maintenance and restoration works.

Uploaded by

zul
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

CEM417 - Group-Of-2 - Project No 2

This document outlines the topics to be covered in a group assignment on highway construction from January to April 2011. It discusses the construction stages of a highway project, methods for repairing road pavement deterioration including pictures, and the types and functions of stationary and moving machines used on construction sites. It also defines temporary and permanent works in construction, providing examples of each. Finally, it lists additional topics to be covered, including sustainable development, infrastructure maintenance and restoration works.

Uploaded by

zul
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Group of 2 Assignment Jan-April2011

CEM417_group-of-2 -project no 2
1.0 Briefly explain the construction stages of highway project.
2.0 Explain how road/pavement deteriorations can be repaired. Provide pictures
and explain the right methods of pavement rehabilitation works.
3.0 List the types, functions and capabilities of stationary machines and moving
machine that are used at the construction sites.
4.0 Discuss the meaning of temporary work & permanent work in construction.
Provide examples for each term.
REPORT:
introduction
contents
conclusions
references

summary of topic; will be covered in TEST 2


Posted: March 8, 2011 in academician
0
TEMPORARY WORKS
-formwork
-scaffolding
-shoring
-trench support system
-underpining
PERMANENT WORKS
-rc technology
-precast concrete
-piling
-brick laying
LATEST TECHNOLOGY
IBS
GREEN BUILDING
GREEN CONSTRUCTION
SUSTAINABLE DEVELOPMENT in Infrastructure
maintenance works
restoration works