Cell Name Original Value Final Value
Cell Name Original Value Final Value
0 Answer Report
Worksheet: [Book1]Sheet1
Report Created: 9/22/2015 9:18:00 PM
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: Simplex LP
Solution Time: 0.11 Seconds.
Iterations: 2 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0.000001, Use Automatic Scaling
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNeg
Original Value
0
Final Value
4100
Variable Cells
Cell
Name
$D$9 Final Values T
$E$9 Final Values C
Original Value
0
0
Final Value
Integer
30 Contin
40 Contin
Constraints
Cell
Name
$F$13 Carpentry Hours
$F$14 Painting Hours
Cell Value
Formula
Status
240 $F$13<=$H$13 Binding
100 $F$14<=$H$14 Binding
ic Scaling
1%, Assume NonNegative
Slack
0
0
Variable Cells
Cell
Name
$D$9 Final Values T
$E$9 Final Values C
Constraints
Cell
Name
$F$13 Carpentry Hours
$F$14 Painting Hours
Allowable
Decrease
3.3333333333
15
Allowable
Decrease
40
20
Objective
Cell
Name
$F$7 Objective (maximise profit):
Variable
Cell
Name
$D$9 Final Values T
$E$9 Final Values C
Value
4100
Value
30
40
Lower Objective
Limit
Result
0
2000
0
2100
Upper
Limit
30
40
Objective
Result
4100
4100
21-Sep-15
4100
T
C
30
70
40
50
4
2
3
1
240 <=
100 <=
240
100