Unit-2 Tripping 28 - 03 - 2009

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

EVENT

ANALYSIS

UNIT NO : 2
1. Event No. 6 /
2009

REPORT

CSTPS

4 X 210 MW & 3 X 500 MW

Time 3:10 hrs.

Date

28/03/09

2. Operating conditions at the time of Event :


Load

Coal Cycles in service

Oil Support

173

A,C,D,E,F

Nil

3. Nature of Event: Set tripped on Condenser Vacuum very low protection


4. Last Tripping: Re-heater tube leakage

Time

Date: 11/11/2008

10:56hrs
5.Similar event occurred last time

UNIT NO :1

Time:10:55 Hrs

Date: 14/05/2008

Remedial action: Drip line replaced


6. Observations: Set tripped on vacuum very low. Following indications /relays operated. 1. TLR
operated. 2.GCB tripped. 3.MFT operated. 4 Inst Air compressor- A tripped. 5.Master trip relay 80GT
operated. 5.Generator main breaker tripped.
7.Remedial action. Shutdown extended to carry out both ID Fans repairing & balancing & CW-4
pump discharge line leakages & to attend other shutdown defects as unit was continuously
running for 133 days since 14/11/08.
8. Root cause analysis in details: TBC CT B phase at GCR Burst resulting in Bus bar differential
protection and tripping of station transformer No 1. Due to tripping of station transformer supply inst
& service air compressors tripped & hence Air pressure became low resulting in closing of TAS-5 valve,
because of this ejector pressure became low & set tripped on vacuum very low
9. Preventive action suggested :
Short term Air lock relay will be fitted to TAS-5 in next shutdown so that in case of air supply failure valve
will got lock in same position.

10. Preventive action suggested :


Long term - Nil
11. Boiler lighted up

Time: 00:30 hrs

Date: 30/03/09

12. T.A. set Synchronised

Time:08:56 Hrs

Date: 30/03/09

9. Remarks Nil

Chief General Manager