Executive Summary 1: Future Wo/inspection Future W/inspection Decrease Increase No Change Current

This executive summary provides information on risk distribution, active damage mechanisms, effects on risk, current and future risk levels with and without inspections, and equipment counts for the GAS AMARGO DE SERVICIO process unit. Currently the total annual risk cost is $1,299. Without inspections, the future risk cost would remain $1,299. With inspections, the future risk cost would decrease to $1,053, a 19% reduction. The unit contains 5 pieces of pipe and 1 vessel.

Uploaded by

Perla Vazquez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views2 pages

Executive Summary 1: Future Wo/inspection Future W/inspection Decrease Increase No Change Current

This executive summary provides information on risk distribution, active damage mechanisms, effects on risk, current and future risk levels with and without inspections, and equipment counts for the GAS AMARGO DE SERVICIO process unit. Currently the total annual risk cost is $1,299. Without inspections, the future risk cost would remain $1,299. With inspections, the future risk cost would decrease to $1,053, a 19% reduction. The unit contains 5 pieces of pipe and 1 vessel.

Uploaded by

Perla Vazquez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Executive Summary 1

Filter: Process Unit = GAS AMARGO DE SERVICIO

Risk Distribution

Active Damage Mechanisms

Effects on Risk

Risk (Total Cost) [USD/Yr]

Risk Over Time

Decrease

29%

No Change

71%

Increase

0%

Risk (Total Cost) [USD/Yr]

Risk Reduction

Risk (Total Cost) [USD/Yr]

Current

Future wo/Inspection
Future w/Inspection

1,299
1,299
1,053

Future Risk Reduction by


Avg. Equipment Reliability
MTBF [week(s)]

Future wo/Inspection
Future w/Inspection

Print date: 04/10/2015


Page 1 of 2

137317
267321

19%

Equipment Count
Rotating

Furnace Tubes

Pipe

Exchanger
Vessel

Column

5
0
1
0

PLATAFORMA DE PERFORACION MAY-D


2020-2020.ord

Executive Summary 1

Filter: Process Unit = GAS AMARGO DE SERVICIO

Effects on Risk

Risk (Total Cost) [USD/Yr]


Decrease

RBI Sugg.

User Pref.

Trad. (Non-RBI)

Final Appr.

0%

0%

0%

0%

29%

Increase

No Change

71%

14%

14%

29%

86%

86%

71%

RBI Sugg.

User Pref.

Trad. (Non-RBI)

Final Appr.

19%

0%

0%

19%

Risk Over Time

Risk (Total Cost) [USD/Yr]

Risk Reduction

Risk (Total Cost) [USD/Yr]


Current

Future wo/Inspection
Future w/Inspection

1,299
1,299

1,053

Future Risk Reduction by

1,299

1,299

1,053

Avg. Equipment Reliability


MTBF [week(s)]

Future wo/Inspection
Future w/Inspection

Database Notes

Print date: 04/10/2015


Page 2 of 2

137317

RBI Sugg.
267321

User Pref.
137317

Trad. (Non-RBI)
137317

Final Appr.
267321