Centre For Railway Information Systems

The document outlines a plan to identify and protect critical information infrastructure (CII) serving Indian Railways' IT applications and services. A committee has been formed to define the CII and develop protection and crisis management guidelines. Project groups have provided data on disaster recovery sites, but the CII data required is more comprehensive. A format and checklist are enclosed for groups to provide detailed CII information by scheduled meetings. Protection of the CII will form the basis for developing full crisis management plans.

Uploaded by

Sanjeev Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views

Centre For Railway Information Systems

The document outlines a plan to identify and protect critical information infrastructure (CII) serving Indian Railways' IT applications and services. A committee has been formed to define the CII and develop protection and crisis management guidelines. Project groups have provided data on disaster recovery sites, but the CII data required is more comprehensive. A format and checklist are enclosed for groups to provide detailed CII information by scheduled meetings. Protection of the CII will form the basis for developing full crisis management plans.

Uploaded by

Sanjeev Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

[CENTRE FOR RAILWAY INFORMATION SYSTEMS]

[IMPORTANT]
th

No. 2012/ CRIS/I&S/ Crisis Mgmt. Plan

Dt. 17 July, 2012

Sub. : Critical Information Infrastructure (CII) Identification & Protection for IR.
Ref. : Railway Board constituted Committee on CII & CMP, with CRIS convener.

With above ref. Committees Terms of Reference (Para 2), CRIS has to identify the Critical
Information Infrastructure (CII) which is serving the IT Applications & Services of Indian Railways.
Necessary protection & crisis management guidelines /plans /proposals will be based on this data.
[Previously, Project Groups have given their systems & costs data for proposed D-R site.
However, the Critical Information Infrastructure data is a super-set of D-R information, as DR is a
part of the full Crisis Management Plan (CMP) for CII].
A format + checklist is enclosed (soft-copy in e-mail) for collecting the information about CII of
IR @ CRIS. This needs to be filled-up with as much detail possible of your Project /Group.
Undersigned, with the SSE /NE of ISG will discuss with the respective Project /Group Head
as per the tentative schedule below. Please also call concerned group members of yours to discuss
this critical information, before it is submitted to the Committee & Rly. Board.
Encl. : format for CII info.

(Vijay Devnath)
GM /I&S
All GGMs /GMs /Regional GMs

C/-

Dir. /RP for kind inf.


EA to MD for kind inf. of MD.
S.No.

Proj. Group

Date

Time

FOIS

18-07-2012

11:00 to 12:30

PRS/ HQ

18-07-2012

15:00 to 16:30

UTS/ HQ

20-07-2012

11:00 to 12:30

ICMS

20-07-2012

15:00 to 16:30

CMS

23-07-2012

11:00 to 12:30

PMS

23-07-2012

15:00 to 16:30

COA/ HQ

24-07-2012

11:00 to 12:30

R-GM/ NDLS

24-07-2012

15:00 to 16:30

CN

26-07-2012

11:00 to 12:30

10

SATSANG

26-07-2012

15:00 to 16:30

11

OAEW, TMS

27-07-2012

11:00 to 12:30

12

EPS, MMIS

27-07-2012

15:00 to 16:30

13

FMM-LMS

30-07-2012

11:00 to 12:30

30-07-2012

15:00 to 16:30

31-07-2012

11:00 to 12:30

14
15

D:\Dropbox\shared_gmiscris\CII_CRIS_data-collect.doc

WISE
AIMS,CC,
I&S