Jorc Code Table 1 Report Template Updated
Jorc Code Table 1 Report Template Updated
Drilling
techniques
Drill sample
recovery
Logging
Commentary
Insert your commentary here
Criteria
Commentary
Criteria
Commentary
Commentary
Insert your commentary here
Criteria
Data
aggregation
methods
Relationship
between
mineralisatio
n widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further work
Commentary
Site visits
Geological
interpretation
Dimensions
Estimation
and
modelling
techniques
Commentary
Insert your commentary here
Criteria
Moisture
Cut-off
parameters
Mining
factors or
assumptions
Metallurgical
factors or
assumptions
Environmental factors or
assumptions
Bulk density
Commentary
Criteria
Classification
Audits or
reviews
Discussion of
relative
accuracy/
confidence
Commentary
Commentary
Insert your commentary here
Criteria
Ore
Reserves
Site visits
Study status
Cut-off
parameters
Mining
factors or
assumptions
Metallurgical
factors or
assumptions
Commentary
Criteria
Environmental
Infrastructure
Costs
Revenue
factors
Market
assessment
Commentary
Criteria
Economic
Social
Other
Classification
Audits or
reviews
Discussion of
relative
accuracy/
confidence
Commentary
10
Criteria
Commentary
Sample
treatment
Carat
Sample
grade
11
Commentary
Insert your commentary here
Criteria
Exploration
sizes per facies. Bulk sampling results, global sample grade per
Results
facies. Spatial structure analysis and grade distribution. Stone size
and number distribution. Sample head feed and tailings particle
granulometry.
Sample density determination.
Per cent concentrate and undersize per sample.
Sample grade with change in bottom cut-off screen size.
Adjustments made to size distribution for sample plant performance
and performance on a commercial scale.
If appropriate or employed, geostatistical techniques applied to model
stone size, distribution or frequency from size distribution of
exploration diamond samples.
The weight of diamonds may only be omitted from the report when
the diamonds are considered too small to be of commercial
significance. This lower cut-off size should be stated.
Grade
Description of the sample type and the spatial arrangement of drilling
estimation for
or sampling designed for grade estimation.
reporting
The sample crush size and its relationship to that achievable in a
Mineral
commercial treatment plant.
Resources
Total number of diamonds greater than the specified and reported
and Ore
lower cut-off sieve size.
Reserves
Total weight of diamonds greater than the specified and reported
lower cut-off sieve size.
The sample grade above the specified lower cut-off sieve size.
Value
Valuations should not be reported for samples of diamonds
estimation
processed using total liberation method, which is commonly used for
processing exploration samples.
To the extent that such information is not deemed commercially
sensitive, Public Reports should include:
o diamonds quantities by appropriate screen size per facies or
depth.
o details of parcel valued.
12
Criteria
Security and
integrity
Classification
13
Commentary