Lamp - Pengawasan Hydrotest-Time Sheet
Lamp - Pengawasan Hydrotest-Time Sheet
Lamp - Pengawasan Hydrotest-Time Sheet
s/d
)
A PEKERJAAN HYDROTEST PT BHATINI MITRA SEJATI TAHUN 2015
PT KOLINDO PERKASA
1
2
3
4
B
1
2
3
4
5
6
7
8
9
C
1
2
3
4
5
6
7
8
9
D
1
2
3
4
5
6
7
8
9
E
1
2
Jadwal P
JUMLAH
HARI
KERJA
PLANNING
JUMLAH
HARI
KERJA
ACTUAL
EXTEND
HARI
KERJA
Cleaning
Preparation Cleaning
Pigging Cleaning
Pigging Cleaning
Pigging Cleaning
Filling Water
Preparation Filling Water
Preparation Filling Water
Stand By
Filling Water
Filling Water
Filling Water and Pretest
Preparation Filling Water
Filling Water
Filling Water and Polly Pig Struck
Hydrotest
Pretest Hydrotest - 1
Cek Pipeline (Pressure Droup)
Filling Water
Filling Water
Pretest Hydrotest - 2
Filling Water & Pretest
Hydrotest Holding Time at 510Psi
Hydrotest Holding Time at 510-710Psi
Hydrotest Holding Time at 710Psi
Purging
Preparation Equipment For Leak Test
Purging (N2)
-1
15
32
17
No
PT BHATINI MITRA JA
Aug-15
24
25
26
27
28
29
30
31
X
X
X
X
9
6
X
X
X
X
X
X
X
X
X
6
X
X
Menyetujui,
Pelaksana
PT Kolindo Perkasa
Jadwal Pelaksanaan
November 2014
8
10
11
12
13
14
KETERANGAN
15
16
17
18
19
20
21
22
23
25
26
X
X
X
Pressure Droup
X
X
X
X
Cutting Pipe (Areal Brigeston, 5 Unit poly pig, 1 unit Bidy Pig,
X
X
X
PT KOLINDO PERKASA
Jadwal Pelaksanaan
No
A
1
2
3
B
1
2
5
C
1
2
3
D
1
2
3
E
1
2
3
JUMLAH
HARI KERJA
PLANNING
Cleaning
Preparation Cleaning
Pigging Cleaning
Pigging Cleaning
Filling Water
Preparation Filling Water
Filling Water
Filling Water
Hydrotest
Preparation for Hydrotest
Pretest Hydrotest
Hydrotest Holding Time at 510Psi
Purging
Preparation for Purging
Purging (N2)
Purging (N2)
Aug-15
24
25
26
27
28
November 2014
29
30
31
KETERANGAN
6
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
15
Menyetujui,
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.667
6.67
6.67
6.67
100
6.67
6.67
100
Pelaksana
PT Kolindo Perkasa
6.67
6.67
PT KOLINDO PERKASA
Jadwal Pelaksanaan
No
A
1
2
3
B
1
2
5
C
1
2
3
D
1
2
3
E
1
2
3
JUMLAH
HARI KERJA
PLANNING
Cleaning
Preparation Cleaning
Pigging Cleaning
Pigging Cleaning
Filling Water
Preparation Filling Water
Filling Water
Filling Water
Hydrotest
Preparation for Hydrotest
Pretest Hydrotest
Hydrotest Holding Time at 510Psi
Purging
Preparation for Purging
Purging (N2)
Purging (N2)
Aug-15
24
25
26
27
28
November 2014
29
30
31
KETERANGAN
6
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
15
Menyetujui,
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.67
6.667
6.67
6.67
6.67
100
6.67
6.67
100
Pelaksana
PT Kolindo Perkasa
6.67
6.67