GRESS PENGAWASAN PEKERJAAN HYDROTEST (

s/d
)
A PEKERJAAN HYDROTEST PT BHATINI MITRA SEJATI TAHUN 2015

PT KOLINDO PERKASA

1
2
3
4
B
1
2
3
4
5
6
7
8
9
C
1
2
3
4
5
6
7
8
9
D
1
2
3
4
5
6
7
8
9
E
1
2

Jadwal P

JUMLAH
HARI
KERJA
PLANNING

JUMLAH
HARI
KERJA
ACTUAL

EXTEND
HARI
KERJA

Cleaning
Preparation Cleaning
Pigging Cleaning
Pigging Cleaning
Pigging Cleaning

Filling Water
Preparation Filling Water
Preparation Filling Water
Stand By
Filling Water
Filling Water
Filling Water and Pretest
Preparation Filling Water
Filling Water
Filling Water and Polly Pig Struck

Hydrotest
Pretest Hydrotest - 1
Cek Pipeline (Pressure Droup)
Filling Water
Filling Water
Pretest Hydrotest - 2
Filling Water & Pretest
Hydrotest Holding Time at 510Psi
Hydrotest Holding Time at 510-710Psi
Hydrotest Holding Time at 710Psi

Dewatering and Swabbing


Dewatering and Swabing Pig Stuck
Swabing
Swabing Pig Stuck
Swabing and Filling Water Pig Stuck
Filling Water Pig Stuck
Filling Water Pig Stuck
Swabbing
Pengeluaran Pig Stuck
Swabbing

Purging
Preparation Equipment For Leak Test
Purging (N2)

-1

15

32

17

No

PT BHATINI MITRA JA

URAIAN PEKERJAAN/ TIME SHEET

Aug-15
24

25

26

27

28

29

30

31

X
X
X
X
9

6
X
X
X
X
X
X
X
X
X

6
X
X

Menyetujui,

Pelaksana

PT Bhatini Mitra Jaya

PT Kolindo Perkasa

PT BHATINI MITRA JAYA

Jadwal Pelaksanaan
November 2014
8

10

11

12

13

14

KETERANGAN
15

16

17

18

19

20

21

22

23

25

26

Pipe UnJoint Areal Aska

Bocor pada material Areal JVC

X
X
X

(Pressure Drop, Ada Kebocoran di BKR)


X
X

Pressure Droup
X
X

(Pressure Droup Masih sesuai batasan toleransi 10% as ASM

X
X

Section (Area Metering to T Joint) Section (Area T Joint To JV


X
X
X
X
X

Section (Areal ASKA to Maedoh)


X

Cutting Pipe (Areal Brigeston, 5 Unit poly pig, 1 unit Bidy Pig,
X

Areal T Joint to Asla

X
X

OGRESS PENGAWASAN PEKERJAAN HYDROTEST (


s/d
)
DA PEKERJAAN HYDROTEST PT BHATINI MITRA SEJATI TAHUN 2015

PT KOLINDO PERKASA

PT BHATINI MITRA JAYA

Jadwal Pelaksanaan
No

A
1
2
3
B
1
2
5
C
1
2
3
D
1
2
3
E
1
2
3

URAIAN PEKERJAAN/ TIME SHEET

JUMLAH
HARI KERJA
PLANNING

Cleaning
Preparation Cleaning
Pigging Cleaning
Pigging Cleaning

Filling Water
Preparation Filling Water
Filling Water
Filling Water

Hydrotest
Preparation for Hydrotest
Pretest Hydrotest
Hydrotest Holding Time at 510Psi

Dewatering and Swabbing


Dewatering
Swabing
Swabing

Purging
Preparation for Purging
Purging (N2)
Purging (N2)

Aug-15
24

25

26

27

28

November 2014
29

30

31

KETERANGAN
6

6.67
6.67
6.67

6.67
6.67
6.67

6.67
6.67
6.67

6.67
6.67
6.67

6.67
6.67
6.67
15

TOTAL TARGET AWAL


KUMULATIF TARGET AWAL

Menyetujui,

6.67

6.67

6.67

6.67

6.67

6.67

6.67

6.67

6.67 13.34 20.01 26.68 33.35 40.02 46.69 53.36 60.03

6.667

PT Bhatini Mitra Jaya

6.67

6.67

6.67

100

66.7 73.37 80.04 86.71 93.38 100.05

6.67

6.67

100

Pelaksana
PT Kolindo Perkasa

6.67

6.67

OGRESS PENGAWASAN PEKERJAAN HYDROTEST (


s/d
)
DA PEKERJAAN HYDROTEST PT BHATINI MITRA SEJATI TAHUN 2015

PT KOLINDO PERKASA

PT BHATINI MITRA JAYA

Jadwal Pelaksanaan
No

A
1
2
3
B
1
2
5
C
1
2
3
D
1
2
3
E
1
2
3

URAIAN PEKERJAAN/ TIME SHEET

JUMLAH
HARI KERJA
PLANNING

Cleaning
Preparation Cleaning
Pigging Cleaning
Pigging Cleaning

Filling Water
Preparation Filling Water
Filling Water
Filling Water

Hydrotest
Preparation for Hydrotest
Pretest Hydrotest
Hydrotest Holding Time at 510Psi

Dewatering and Swabbing


Dewatering
Swabing
Swabing

Purging
Preparation for Purging
Purging (N2)
Purging (N2)

Aug-15
24

25

26

27

28

November 2014
29

30

31

KETERANGAN
6

6.67
6.67
6.67

6.67
6.67
6.67

6.67
6.67
6.67

6.67
6.67
6.67

6.67
6.67
6.67
15

TOTAL TARGET AWAL


KUMULATIF TARGET AWAL

Menyetujui,

6.67

6.67

6.67

6.67

6.67

6.67

6.67

6.67

6.67 13.34 20.01 26.68 33.35 40.02 46.69 53.36 60.03

6.667

PT Bhatini Mitra Jaya

6.67

6.67

6.67

100

66.7 73.37 80.04 86.71 93.38 100.05

6.67

6.67

100

Pelaksana
PT Kolindo Perkasa

6.67

6.67